Download as pdf
Download as pdf
You are on page 1of 60
eS faocit Ael tat Heder fates DELHI METRO RAIL CORPORATION LTD. MASS RAPID TRANSPORT SYSTEM PHASE-3 DESIGN VERIFICATION, DETAIL ENGINEERING, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL AND MECHANICAL SYSTEM INCLUDING FIRE AND HYDRAULIC SYSTEMS FOR UNDERGROUND STATIONS OF DELH! MASS RAPID TRANSPORT SYSTEM PROJECT PHASE-3 CONTRACT PACKAGE: CE-09 ADDENDUM-1 Me IME EMPLOYER'S REQUIREMENTS. PARTICULAR SPECIFICATION GENERAL SCOPE OF WORK AND TECHNICAL SPECIFICATION DELHI METRO RAIL CORPORATION LIMITED METRO BHAWAN, FIRE BRIGADE LANE, BARAKHAMBA ROAD, NEW DELHI -110 0014 arndoxoe od | sevens ox sanveleop syeudoredelucunne wwe y sooue.#op ateSONGEE] 9403 Sa mani an ‘awa popodane pue paezedos ‘au papadds pus powsedoe) “nen eqyeys Seqsng ‘ypvea anpun] —_aqiieus regan Buspven ap own eaeng ureu oy aio juBnosn} noun szcsng wets ay ND WENO ae nes nnddnp pue oss secure] 9 Uo ieddo¥ pue sony z8eeN| ete patuease pe povontsod| we ven paduewe pus povostend ‘os og yous szoqsna wie au ‘8 09 eye senna wes ou stenana 10 299 2n00 Suto} ‘stenong | preter sonecuum a} S249 ered Gung Ps nent soupy wes! X14 wOURR Pe] JO UOTE 0 5 euro Pewee meee ean mes| ‘re gsm pusaoa pu aeyoa] SEE HOS zzzjo nae wee sLy-2unIoA Yo Buseng ive oR WU?’ UE) ye papraxd 9q BUS YONG WUE LL soy )0u jo sod ue an0uEEU-ON] sj} }0 sed PLES aneUEEUL UCN poppe yoenuns 60-30 u swoudnda| 5 porn 70 3d0g 129499 a, pu so] JO 18 IA Oso eyo ove VL GRE io powbe par00 66] Penn Baas IOS 20 swap ofeyys0 ST eumeowy| ewe eurron poppe wourooo | 2) lor 90-39 97 uma quouRD9p oe} vate mv ywour000, poppe 19g tum wounoop ooepan wowoteuoy! 208}00 reunion, qumuoy pesvou GuowepyeuiByo| ouesnea | — ovebea mon ‘ou eGed pio [eNsandeuo pus euryon | ou {yaujon 04 wnpueppy 60-39 9211009 sso os] eves zzcp veel zzzioou iy aunen a ova zzz yo nace wep2n SL ¥-2UMOA a ‘pany 3 960 aimsedun] aoe worntd guamed 2 vaP ot] zee vant wp ‘SL ¥-9UON 4“ ‘09+ 2102 zzz 10 veel zewel ‘si y= 3urIOA ob exvi9 oarsrece N84 ayn eouepioase ut § 28h) ar UL? 0 aap 109 wpa sL¥-aunEn 6 tums ® 29 g5 SUBORHDIN OM] pure und 59005 60 5 UE BL Orlaye Lea oh 2 veg en wet 1 wena footsauen "ame FUE end Coan maponeet oso-telaae "pani mesos jus pue ved ‘ors Sa im SSW puny ve ars Sa we Baheuno} (EE EE COS zzz 10s 2221005 sL¥-2unen ® Toa foe piu WOH Ew OR TEVElyaaye yi paul won opm, Te Jsten ses au, sovnmrecoe Ov DUEL Sey agen ous spotszane Our Pus Jer spueq ops Lope) GH PPALEMHsas “spung apew LOA wh SEL feck speuricaoes punoie oman wil opeurtvone) pune deat Wt peimcnod © 723 HE Stan 99D )Vperemyad w yo oF we en and pamued eniounwegowe.aoon) —__peanuoda iy mm gay 2 a0 otter aes woH| SX 04 MEAP! IS cate eilna casas om Jo Cua) va) eH SOVES Ont Hy da ae Joseopieouag | ‘Maun PuEYOSESITDUAS o¥ aus oes onp ses ors 8983 fa PaeeD OF} AE EA 03 oan parae! pee pevpee| oi sere pavns ut sibs me ae an seveyuen ie onan} “mdse wos Pas 1 HO seers moaae (xe aon woon| wmwerzens_ paces =e GOA SOOM erecta weay0 ware wpm SL y= auimen L Sees nowna nsuaune sever] ov) webu p sean Sry ae econ anyenursanea| siiusenon meeene 08 nus aN aN ee enenemronrcs| __wransuneg janie ra a in rope enor er cormaupon] FAs wr uaon On ORNS fe 9veu aus 000 TE (mek seu owes 99 15 eonmiessonrenviovomans (2 soMBUERION EVP (| ‘wowen pesiiny| Tpewop eurbug] souesnea | ouobed mon Guede pio | enserdeug pueeuimion| U's 1 suion 08 umpuEpPY 60'FO37ENNOD spcote a ccimrwmom cree] ems [civ | aerm | minor nim ce meommanmaned ieee bea : arene ceadawopmasen| _poauinesnpmncr mx gg meee] roves | veewnien | cezmmt sion ee eee enon oa ne ware wa waniwa | eames | euromea arama wa Samra | emi me xa ad aaa 3 21d amenamnm antec were | eens | SLFmnn eC — aod cc ampetua anced Taman | wwe | say ouea SS oneal aetociesedmmee| corns | aapumn | zen es a se nee ene sl Soom aaa Sedan aronpuraredeyvmesetir9| uostensnssaunavon fey] zecw3 | cce Huh mses siy-euron -ernnet - abyeu “OC ADSE IeUWON) nett —— aa a} cies | aes | anor een eed com cevnlcwonmnnesiece coews | rernm | mmm | siren ema = momamnmnattind| eemimoiramenmnal gyyua | wewnun | capa | sures creer ene a sae a rn eee sabrot woemea | oWieanay | etn [anime pur enon ‘rownjon 1 unpueppy 60-29 39809 yoy 2864 loa prroweasoepne-ponoway “9680 abe aa 9 e010 7a0¥8 ssopErs JO x pots S2penns panan ry “2858U0) “prabieyp-yeoubua J ADIGE Timewsvpanwatt | carotene | te2 | ene zapm — | zenmovounen | a Eanes Avro on ns aero oe moa | exe remo ose EN ‘wayshs WAH 40 S390], BUND ‘wsansks WAM a L mmin| yo oy fog mn ‘Sceinearcmananim | "Se 1 | garner moma nO eperonaomin,, | sopmod "wuo0s x unuaoge] 1eys YoUed MUNN O47 Os 0 UY] ens yo ove, Su eZ 024.037 YY ewig posinen| quowop uBHo] suesnero | — oueed man ‘uebed pO | eNsevieug pur eumion | W'S ‘yownjeA 0 unpueppy 60-39 HEED eS faooit Fat 2a Hieaeert fees DELHI METRO RAIL CORPORATION LTD. MASS RAPID TRANSPORT SYSTEM PHASE-3 DESIGN VERIFICATION, DETAIL ENGINEERING, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL AND MECHANICAL SYSTEM INCLUDING FIRE AND HYDRAULIC SYSTEMS FOR UNDERGROUND STATIONS OF DELHI MASS RAPID TRANSPORT SYSTEM PROJECT PHASE-3 CONTRACT PACKAGE: CE-09 ADDENDUM-1 GENERAL SCOPE OF WORK DELHI METRO RAIL CORPORATION LIMITED METRO BHAWAN, FIRE BRIGADE LANE, BARAKHAMBA ROAD, NEW DELHI -110 001 Annexure VI to General Scope of Work Major Equipments in CE-09 Contract S.No. Items Power cables from highest size upto 120 sq mm cross sectional area All Electrical Panels, Fire Fighting Pumps Fire Alarm Panel ups lo jor |» jo | Sandwich type Bus Duct Page 74A of 74 Technical Specifications CE-09 Annexure Vil to General Scope of Work BESUI WITH THE TECHNICAL P/ iE AS PER 2PENDIX MINIMUM LIST OF TOOLS & TEST EQUIPMENT (Rofer clause no, 7.2 of Annexure V to General Scope of Work and Chapter 13 of GS) MINIMUM LIST OF TOOLS & TEST EQUIPMENT (For each schedule of each Lot) S.No. DESCRIPTION QUANTITY 4__| vacuum CLEANER (With Extension) ‘for each Station 2__| AIR BLOWER ae 1 for each Station 3_| LED TORCH 2.for each Station 4_| tester 2 for each Station '5_| CRIMPING TOOL suitable for instaled sizes of cable. 4 8 _| HACKSAW 1 for each Station 7_| 001s KT 1 for each Station 8_| MAGNET 41 for each Station 9 _| ROPE NYLON 50 METER 1 for each Station 410 _| HAND HELO DRILL MACHINE, 4 for each Station 1_| puer ser ‘for each Station 12_| ALUMINIUM LADDER. 1 for each Station Ay_| 4FEET(A Type) 4 for each Station 8)_| 2070 36 FEET EXTENDABLE 1 for each Station 43 _| FIRST AID BOX with medicines ‘for each Station 14 _| KEY BOX suitable for 40 keys 4Lfor each Station 48 _| SCREW DRIVER SET consisting of at least- 4 for each Station A) _| SCREW DRIVER-6” 1 for each Station B)_| SCREW DRIVER-8* 4 for each Station ¢)_| SCREW DRIVER-10" 4 for each Station p)_| SCREW DRIVER-12" “for each Station 416 _| SPANNER KIT consisting of at least- 1 for each Station ‘A)_| D end SPANNER-6/7 TO 22/23,24/27 30/32 4 for each Station 'B)_| Ring SPANNER-6/7 TO 22/23,24/27,30/32 1 for each Station 47_| CROW PLIER 1 for each Station 18_| TORQUE WRENCH 4 for each Station 49_| PIPE WRENCH suitable for 150 mm pipe 4 for each Station 20_| ADJUSTABLE WRENCH ‘for each Station Page 74B of 74 21_| HAMMER (2 Ka) 1 for each Station 22_| CHISEL FLAT “for each Station 23_| ALLEN KEY set 1 for each Station 24_| Scissor. 4 for each Station 25_| SPIRIT LEVEL _ ‘Mor each Station HYDRAULIC OPERATED HANDLING TRUCK SUITABLE FOR 28 | EAROLING ALL SIZES OF AIR CIRGUIT BREAKERS ‘or each Sion Note: 3: ‘The above list is indicative and not exhaustive. If any additional Tools & Test Equipment are required the same may be indicated by the Firm in their Technical Ole However, nothing extra will be paid for any additional Tools & Test Equipment indicated by the firm. ‘The cost of Tools & Test Equipment listed above for maintenance during DLP have to be included in the quoted prices. Nothing extra will be payable for such Tools & Test Equipment. If any additional Tools & Test Equipment apart from the ones mentioned above are required during the DLP period the same will be arranged by the contractor, without any Extra Payments. This will not absolve the contractor of his responsibility to fulfill the DLP obligations as per relevant clauses of tender conditions. Contractor has to ensure availability of above Tools & Test Equipment along with Fest cartificates, calibration certificates etc. as per clause 7.2 of Annexure-V of Employers Requirements given in General Scope of work of Technical ‘Specifications and Chapter 13 of GS. ‘The requirement given above is indicative and minimum in nature (for guidance purpose only). Prior approval of engineer-in-charge wil have to be taken before supply of Tools & Test Equipment along with details regarding the make & model no. of items specified above. Page 74C of 74 Technical Specifications CE-09 ADDENDUM-1 INTERFACE MANAGEMENT DOCUMENT __ Contract Package CE-08 Lot 2- Employer's Requirements: Partcutar SPS INTERFACING WITH E&M CONTRACTORS IN UNDERGROUND STATIONS (eam) &ECS GENERAL Different Consultants / Contractors are assigned for the design and construction of various E&M facies, including lighting, pumps, escalators, elevators, DG. sets etc in the stations, These Consultants / Contractors are collectively referred (0 as EBM/ECS. The CE-08 LOT 2 Contractor is responsible for supply and erection of various equipments in the Ausiliary Substations at the stations to step down the 33 KV Auxiliary power to 415 V AC and supply to the Station Auxiiaries. CE-O8 LOT 2 shail interface with E&M for various items of work. ITEMS OF INTERFACE ‘The mains items of Interface are «Supply and erection of Low Voltage Switch Board (LVSB) = Connection between Secondary of Auxiliary Transformer and the LvsB + Low Voltage Protection + Auxiliary Transformer Differential Protection «Transformer door interlock ‘¢ Lighting and Ventilation in ASS « Earthing in ASS ‘* Ventilatior/cooling requirements if any. INTERFACE REQUIREMENTS ‘The Interface requirements are described in Table 6.3. ial Page 16 of 20 November 2012 ea sopemne Z LOT E30 “AH 09 vorooraid 119.17 814i Jo suoRoauuc ou apis | 40}8,1.0 Buyyoyets LWA Buoye ‘shejon renuezeyic ‘A 01p uo Ajojendosdde 19 pue uuopeyoud jenuoreyia Aesseoeu seuoysued, ‘skejau a1 yunow Aiddns [IMA W283 ‘8M @pIAOUA IM Z LOT 80-3O Kew | “Burda yeu Ag ‘souusoysues OY} JO 103600, ‘AH Burpuodseuioa oun yo Burddiy ese ‘sje teys siayeeue A SHY J0 Guidi (107 20-30 #19 Ka popraad | S138 SUE OTE IFUS Z107 80°30 99 lM oxeaUg AH OULL) SONIDE “apis (71 4) Uo SyNe} 1/081 Bujdeyy-seyi oped pue sieyeaig | 04 SAsjod uonDejoud AlessozeU Lim ‘ASL 9uy Uo Skejai UoRDeja:d | paplo.d ee S/T GU) UO S1eXeO1G A UOROBIOL Avesseoau ayy opinoid yeus wea | Sty eu) yeUn aunsus [1848 Z LO BO" s6eyoAmoT] (enoge pue v/r4 000} s¥@UNO}SUE asny 410} pasn 64 jy snp sng) | ey} pue souo;SUeLL “yes Aq | yonp snq so @/qeo enjeoes 0} Aepuoses Asenxny ‘uop 09 jy seyqe9 Aq Jo yonp Sg JeliojSUel| WY UO IGeIEAE ere 40 Arepuooes, ‘ka uopoauuog pue uoqaeve ‘Aiddng | sannoe) wip ensue jeus Z 107.80-30 | sewed votpeuucd | | 2 (asad pues LOWS wea Aq Be HOA M07 10 peyaue pue payddns aq il GSAT uogoae pue Aiddng | | ‘soakwea) TOWEHLOD "ON euewey suoyoenlog S93/ 8 107 80-H9ZLOTGGRD. uondusseg wen | We! (wea) suogerg vi siojpenuog Ie 3 YIM SuIpeHeIU| Seal Teev) woreaypedg wenapiea ‘sjuaweqnbay SJeKe “Ua = Z107 Bo-gO eBeyPed HEAD ¢ 2402 JOqWORON 0210 91 efed Fequepyuog ‘Suyjoog ‘suey ysneyxo PUE ‘equeweBuewe | sue) ‘pauiajeid 10 syuewesnbes jeneds voneiuen epircid yuagoa | Aue SOB 0} @SIADE Il” Z LOT BOO sev uj uonemUeA| 8 “wea ou Aq papiaoud eq 1M Yes WOREIS Up PLE | : giea sev uoenyeq uoreuucoseys)) 2107 80-30 fq ouop 24 11 SL3N ie | Hu pee eet samyeq uoKoeuUeD, “ssv oy) ul woud f i 08 J wedopul %.107 80-30 oun Aq ‘sng Serer nein | yaaa popes an SO gut (usa) eUnUo peg ua | Hee Pefuso-usuno-uou snouen ‘y 38e9] 12 epIAaud [WM WES “SSY ‘sey ‘9yj 0} siasy epyroid pue uoREIS a | saddoono eiqeuns Ul SS¥ OU} OPIS! Jbjusoyi yuog ue oped ia Wea] SAYLES UE LINK ZLOTEo-3O| — ssvyuBuuNeS| 1 “suey ysneuxe pue sue} ‘YB Jo UOHED| ssquewefveve uogewquen | peueyeid Jo sjuowexnbas eipeds Aue) Sev Ul uoneIveA pue Bunysr7 epyAoud jw SORES | W251 OU OF @SIAPE LIM Z LO B0-3D pue Buny6r | 9 740780 -30 Aq pepiaoud oq yyw soop eunsojaus sooverU “seUUoysUeL} 10) YOWAYU PUE BuUINA | Joop sswUOJsUeLL |S ‘opis [N1 pue AH u2eMjaq sud}DeuUCD 91989 joujuoo Kiesseoeu ay} OP IM Z LOT 80°30 “L017 eu Jo suonsoyeds “sosodind 'g sjuawauinbas aug apiaoid uoxperoud soy vaye) sexing | __pue JOPENUOD 1 6Ub WIM BOBO SOaAWBS) FOTEHUOD “ON SIEWON suopenuog $93/W 23 Z 4071 80-39ZL010GS9 uonduosed wey! | Wer! “suweup duseyuorres 3n0s @.qeo UypA BDUEpIOIOe xogeuunt ‘uy wood SS¥ 4) OPISIRO ‘sINOL ‘ye sBujuedo ‘Bugnos ajqeo | uf $94q80 1011U00 ‘yea oly Buoje syoddneysiqed | ayenbepe pue wali0d clnsus OL Na ‘pue Jamod 30} ‘eigeo epinoud Ilys WS ‘OU UA BORO IM Z LO BOBO | Weduoddns eiaeo | 6 ‘soaKwea) FOEHUOD “ON syewen suoyequog $93/ WB 3 2407 90-39/24071-0039 uonduaseq west_| Wel Sear vaeaReN seiriped ‘sueweumboy 572k" "U3 - 2307 80-30 #B—rPeE EAH 4 INTERFACE REQUIREMENTS BETWEEN TELECOM CONTARCTORS (C817, CS12, CS14, C515, £516, GSM/CDMA, AFC) AND E&M/TRACTION/OHE CONTRACTORS FOR ‘STATIONS/DEPOTS/TUNNELSIRSS Following requirement are listed for installation/provision by E&M/Tunnel/OHE contractors for Telecommunication work for Lighting, Air-conditioning, Cable traylladder, earthing, etc. requirements at Stations/Depot/Tunnels/RSS. A. General Interface Requirement:- 1. Cable Trays connectivity from TER to Various location of Station and Tunnel as per Combined Servées Drawing (CSO). 2. During handover of TER avaitabilty of folowing ilems are to be ensured, as a minimum = AC Power, Cable tray Risers, Air-conditioning, Lighting, AC power sockels, data /power trey ’ = 3. . Telecom Data and Power trays to be marked with distinct color codes to avoid any ambiguity between telecom and other services trays, 4. Cable tray junctions and T points should not have sharp bends and edges to avoid cable damage. The bending radius of misimum 1.5m shall be provided. 5. Data and power tray should have separation of at least 190mm between them at any place and if Crossing is required.there should be provision of a bridge to cross the cable tray. No electrical tray loser than 300mm should be provided near Telecom trays B. Lighting requirement 6 AC power points. indoor lighting facilty.and fire protection system to be done in TER, UPS, GSM/CDMA etc. Minimum 300 tux. level of lighting at FFL to be provided with some lights with emergency supply. Cable Tray installation requirement Data and Power cable trays are to be provided from TER to Concourse, Platform, Road level areas, Ail Station Entrance/Exits, Technical Rooms, SCR, TOM. EFO, Security Room, Ancilary Buildings, DG Room, Pump Room, Under croft in underoround stations ete. Cable tray Risers/Droppers to be provided in TER and S&T shafts with connectivity from nearby Telecom trays provided 8. CableTray connectivity from Optical fibre cut-outs in platform beam is to be provided up to TER with dropper up to floor level with route diversi 8. Data / Power Cable tray risers / droppers up to FFL to be provided in TER, TOM, EFO, SCR Platform supervisory booth/Panel and any other Room with connectivity from nearby Telecom trays. 10. Provision of Telecom Trays connectivity at Road level to be done for parking areas. ‘11.19 case there is double height area at PF level, the provision of cable trays and mounting structures for GSM/COMA antennas, CCTV cameras and PAS/PIDSIClock equipments should be designed at appropriate height away from PF edge. Cable Trays should be provided in a manner 80 that minimum no, of sleevesicutouts is required for Telecom equipment installations “oO Page 1 of 3 1/12. Provision for Telecom Data and Power Gable/Cable tray connectivity to be done in al the utility buidings in Depots (All leveis) with connectety from the SBT trench 13, DataPower Tray RiserfOroppers in TER, DCC. S87 shafis and other locations to be provided in connectivity of nearby telecom tray in Depots +14, Datwpower tray connectivity is o be provided inal uty bung (All levels) ncluding main gate in Depots from the pull pt connected with the trench, Data/Power Cabie Wray risers / droppers 10 be provided in TER, OCR ete. 116. Tebow Cable Tray connectivity for Platform Supervisory BootivPane! (PSB/PSP) from the nearest S&T Tray, 16, Provision of cable trays connectivity Is to be done on portals for instalation of clocks, speakers. CCTV cameras in workshop, inspection bays and stabiing yards etc in Depots. 47. For stations with radio base equipments, cable Wray connectivity for two different locations (with Toute diversity) from TER to open sky at ground leval to ’be provided for installation of GPS antennas. a 0. Earthing requirement 16. At Elevated Stations/Depot, Provision & Exlension of Main earth (<2 ohm) to be done from Main Earth Mat location to TER, UPS (S&T) Room and SCR. Copper Bus bar with min.20 holes (10 por row) 10 be provided in TER, UPS (S&T) Room, SCR and DCC in Stations and Depots. Main ‘earth extension with copper earth sicp to be done in the GSM and CDMA Rooms. 19, At underground stations, extension ef Clean Earth (<1 ohm) & Main Earth (<2 ohm) to be done from Earth Mat (Provided by Civil) to TER. Copper Bus bar with min.20 holes (10 per row) 10 be provided in TER. 20. in tunnel main earth strifs at cross passages for emergency telephones to be provided. ¥€. Air conditioning Requirements. 21. Ais conditioning to be installed for TER & UPS rooms. Drainage system of Air consitioning shove ‘be installed outside TER, & UPS rooms and only air outlet is to be provided inside rooms to maintain temperature nominal 25 degree Continuous. 22. Clear height of 3 meter should be available in TER for telecom equipments instaliatons. Instelations of other contractors’ equipments (Air conditioners etc) shall be above 3 meter height. 23. There should not be any water flow or drainage pipe passing through TER. 2 24. Confirmation of Fire Safety Provisions. +f. TSSIRSS requirements. 25, For providing Telecom facities at TSSIRSS (Out side the OMRC Premises), connectivity either by tench oF by trenchless is to be provided by traction contractor atong with their own cable route. 26. Telephone cabling inside the TSS/RSS buildings to be provided by E&M. 27 In RSSITSS building control room, table for providing telephone, telephone rosette with conncetivity required 28. Provision of Cable trough/Trench with one bracket inside RSS boundary for laying telecom cable. 29. Provision of AC 230V for telecom (CCTV, CLOCK ete) equipments. In addition to above following requirement to be installediprovided at underground stations & Tunnels. Page 20f3 90. Bracketshangers are to be provided on tunnel inner edge for laying of optical fibre cable emergency telephone cables, GSM/COMA Cables, 31. Cable ray conneetiviy isto be provided trom Telecom brackets in ivnnel to telecom cabe Ways in nearest S&T shaft 32, Data/ power cable tray connectivity is to be provided in mid shaft with connectivity from Telecom brackets in tunnel 33. Provision of Temporary power and ilumination in Tunnel to be provided {or installation of ‘emergency telephone and stand offs for LCX cable of GSM/CDMATETRA system. Temporary lighting ia Tunnel ehould not be provided in space reserved for GSM/CDMA/TETRA cables in Tunnel. . GSM/CDMA requirements. \ During handover of GSM and COMA rooms evailabilty of following iterps are fo be ensured, as eninimum:- AC power, Air-conditioning , Lighting, AC power sockets, power supply cables, Main Earth (

You might also like