Professional Documents
Culture Documents
Floor Plan
Floor Plan
Floor Plan
A B 13 C D E F G H I
40600
5488 5113 5000 5000 5000 5000 5000 2500 2500
147Y12-10-150 c/c B
147Y12-11-150 c/c B
168Y12-02-150 c/c T
29Y12-04-150 c/c B
68Y12-01-150 c/c B
96Y12-05-150 c/c B
30Y12-16-150 c/c B
31Y12-17-150 c/c B
29Y12-03-150 c/c T
96Y12-06-150 c/c T
96Y12-07-150 c/c T
63Y12-14-150 c/c T
61Y12-15-150 c/c T
14Y12-18-150 c/c B
16Y10-08-250 c/c T
16Y10-09-250 c/c T
16Y10-13-250 c/c T
8Y10-12-250 c/c T
CT3
1 1
CT1 CT1 CT1 CT1 CT1 CT3 CT1 CT1 CT1
3825
3825
CT7 CT7
2 2
CT1a CT1a CT3
CT7
3675
3675
CT1
CT5
CT1
3 3
CT1 CT4 CT4 CT2 CT2 CT1 CT4 CT4
3750
3750
22500
22500
4 4
CT3 CT5 CT6 CT6
3750
3750
CT1
5 5
CT1 CT4 CT4 CT2 CT2 CT1 CT4 CT4
CT5
CT1
4200
4200
CT7 1.EACH STAGE OF CONSTRUCTION OF THESE
WORKS MUST BE APPROVED BY THE ENGINEER
6
CT1a CT7 CT1a CT7
CT3
6 BEFORE ANOTHER STAGE IS STARTED.
3300
OTHERWISE STATED.
7
CT3
7 3.ALL STRUCTURAL CONCRETE MUST BE 1: 2: 4
CT1 CT1 CT1 CT1 CT1 CT3 CT1 CT1 CT1
MIX WITH MAX.
ACHIEVING Fcu=25N/MMSQ AT 28 DAYS.
147Y12-24-150 c/c T
147Y12-25-150 c/c T
147Y12-26-150 c/c T
29Y12-20-150 c/c B
46Y12-22-150 c/c B
97Y12-23-150 c/c B
63Y12-29-150 c/c B
61Y12-31-150 c/c B
63Y12-30-150 c/c T
CLEAN AND FREE FROM DUST,SILT OR CLAY.
31Y12-32-150 c/c B
29Y12-19-150 c/c T
24Y10-28-250 c/c T
16Y10-21-250 c/c T
expansion
joint
8. B= BOTTOM, T=TOP.
DWG TITLE:
PRIME CONSULTANT:
CLIENT: PROJECT: LOCATION:
GROUND FLOOR slab detail
HORTUS berth Ltd DRAWN BY: DATE: DWG NO
ENGR R.T
22- 0057