Done o
Done o
A B 13 C D E
5488 5113 5000 5000 5000
1275
4Y20-02 4Y20-02
03
03 4Y20-02 4Y20-02
27Y8-70-200 c/c links 26Y8-70-200 c/c links 25Y8-70-200 c/c links 25Y8-70-200 c/c links 25Y8-70-200 c/c links
E' F G I G I
4750 5000 5000 5000
4Y20-03 3Y16-01
02 03
02 4Y20-03 03 3Y20-04
24Y8-70-200 c/c links 25Y8-70-200 c/c links 25Y8-70-200 c/c links 25Y8-70-200 c/c links
A A' 13 13' G H I
4675 5925 3825 2500 2500
1175 1525 1525 975
2Y16-01 3Y20-09 2Y16-01 3Y20-09 2Y16-01 2Y16-12
2Y20-09 2Y20-09
04 07
04 2Y20-10
3Y20-10 2Y16-12 07
23Y8-70-200 c/c links 30Y8-70-200 c/c links 19Y8-70-200 c/c links 13Y8-70-200 c/c links 13Y8-70-200 c/c links 1.EACH STAGE OF CONSTRUCTION OF THESE
WORKS MUST BE APPROVED BY THE ENGINEER
BEAM 4 (225x600) 2 NOS THUS BEAM 7 (225x450) 2 NOS THUS BEFORE ANOTHER STAGE IS STARTED.
8. B= BOTTOM, T=TOP.
DWG TITLE:
PRIME CONSULTANT:
CLIENT: PROJECT: LOCATION:
GALLRY FLOOR BEAM DETAIL
HORTUS berth Ltd DRAWN BY: DATE: DWG NO
ENGR R.T
22- 0057