12200
2360
DRAWING STATUS
A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
3500 3500 3500 C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
1350
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED
17750
REFERENCE
DRAWINGS
4700
Approved By:
Project Manager
DESCRIPTION: 1 INSERT BOOM + 4 COUNTERWEIGHT B/C
Signature Date
TOTAL WEIGHT: 25.04 Ton Checked By: