AL Toukhi PO Substation Work

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
FAX ON glad) gb Lai 5 Ae ticall (8 pall As 5 AlToukhjfsaghall Al Toukhi Company for Industry, MESSAGE Trading & Contracting Purchase Order No. 7843 | ; 31 December From Al-Toukhi Company. Torgent | Dat ee Mis: Baran Company Limited (Subcontractor) Ordinary =O] 4, 5 Te ‘Ann: Mr, Mohsan Bajwa ime; SGN Mob:0803213$69 - | Ener. Osman Samir No, of MR | Hanated By | 99566-11-2766655 Ext.265 | Pages | | No. iets Project code MODON/2100 QTN. No. Email Dated 10/12/2020 Budget ‘Account Cade 131040000000 Ttem Code Rl | Subject P.O for Installation work for Macon Project. (CONSTRUCTION OF MODON 132/33kV BSP (PHASE-1) IN WAAD AL-SHAMAL (NEOA This “Service Contract” legally binding is made of and entered into as of December 21, 2020 (Service Contract Date) between Al Toukhi Company (Contractor) and M/s Baran Company Limited (Subcontractor) for the “Complete Equipment Installation Work for Modon Waad Al-Shamal Project” fully compliant to Technical Specifications, Request for Quotation specifications, relevant standards, project requirements and subject to SEC approval as follows: A+ Scope of work. > The SUBCONTRACTOR will carry out all works required for complete installation as per the attached Annex#1 for SOW of the following: 1. 132kV GIS. 2. 132KV Power Transformer. 3. 33kV SWGR. AC & DC, Lighting panels, 125VDC & 48VDC Chargers, Convertors ete] ‘Lot — Protection & metering Panels including Remote Ends a TFR, DSM including Remote Ends SAS Panels. ‘Communication Room Panels including remote ends Auxiliary Transformer. E-Mail Address: Procur@altoukhicom Tel. 2766655 — Fax, 4059341 Page. 1 FAX EN glial y 5 pga y Ae Linall po phi Ls yc AlToukhyfsaghll Al Toukhi Company for Industry, MESSAGE Trading & Contracting _ 1, Capacitor Bank 11. Surge Arrestor. 12. Neutral Grounding Resistor. 13. Cable Ladder & tray 14, HY Power Cables 1s, MV, LV Power Cable, control Cables and Grounding cables. 16. Lighting Work including Lighting Pale. 17. Gantry related work, 18. Earthing & Grounding System. 19, Sum Pump 20, CCTV Erection. 21. Any ancillary electrical system required for completion of listed down works, > The SUBCONTRACTOR will carry out all works required for complete cable pulling and termination of Low voltage, Control, Protection, instrumentation cables, MV power cables and installation of HV, MV Cable Support for complete Substation & remote ends duly in line with Technical Specifications of SEC as per the attached sow. ¥ The SUBCONTRACTOR will ensure implementation of following scope of work but is not limited to: 1. Shifting of cable drums from yard to job site avoiding any damage i, Cable pulling as per provided cable schedules avoiding any cable wastage ii, Marking and drilling of holes in panels/boxes/equipment base plates iv. Lift cables from cable ladeler in to the panel with proper dressing Cable glanding using appropriate size of glands, material under Al-Toukhi (Cable, Gland & LV, MV, Control Cable Lug’s Will Supply by TIT) The SUBCONTRACTOR will provide sufficient skilled manpower with enough supervision including but not limited to qualified Site in charge, foremen, supervisors, certified scaffolding supervisors (qualified erecters) etc. for timely completion of job including provision of multiple shifts and groups. Far GIS, & SWGR, requirements of Installation Supervisor in terms of manpower, tools & equipment shall be meet_to. complete job on target dates (Special tools and heavy equipment provide “By Contractor), \ Teed F AX GY gall 5 Laat y AeLivall pa gb As ya AlToukhifgeigball ‘Al Toukhi Company for Industry, MESSAGE Trading & Contracting > The SUBCONTRACTOR foremen, supervisors, lead men & technician ete. should be qualified and enough in number to carry out job with quality without any loss or damage to material/equipment, and in line with applicable standards and in time. Unqualified staff will be demobilized from site: immediately. In case of non-compliance to qualified manpower requirement, Al Toukhi has right to terminate subcontract agreement in full or partial. > The SUBCONTRACTOR shall meet all quality standards of SEC and Al Toukhi, Violation of quality norms will result in penalty or cancelation of subcontract agreement. ‘The SUBCONTRACTOR will unbox,or unpack as required shift Material back & forth from storage yard with in project site to Job location, as required for SUBCONTRACTOR scope of work. > The SUBCONTRACTOR is responsible for the checking and verification of the proper v materials to be used in order to comply with the technical conditions applicable for cach element and compliance with the applicable codes and specifications of the manufacturer, Al Toukhi and SEC, > The SUBCONTRACTOR shall coordinate with Al Toukhi for work plan & weekly reports. > Perpetration, approval and submission of red markup drawings once installation is completed. Hard copy of AO / A3 size drawings will be provided by Al Toukhi. Work will not be considered complete, until unless markup drawings are submitted & approved by SEC, > The SUBCONTRACTOR shall provide all tools and tackles required for installation of above mentioned equipment including but not limited to: Hilti Core bit and Coring machine DIAMOND CORE BIT, Spanner Seis, Ratchet Sets, Torque Wrench, chain block, lifling belts, cargo belts, shackles, Shillings, ladders, scaffolding, Water Levels, pliers, monkey pliers, adjustable Wrench, core drilling machine with bits, Drill machine with bits, Concrete Drill Machines with bits, Grinders & cutters with discs, screw drivers, Vacuum cleaners, Tools for box opening (e.g. Hammer, Crow Bar ete.), cable drums, marking thread, all consumables to complete scope of work, List of smininyam tools required for installation, > Miscellaneous (Subcontractor Scoy ext \ v = FAX OY Aba yo jLaall y eLinall 8 bids yo AlTouhy{geighall Al Toukhi Company for Industry, MESSAGE Trading & Contracting 1) Mobilization and Demobilization from Job Site, 2) Accommodation & food for Manpower. 3) Transportation, Boarding, lodging and Local transportation. 4) Responsible for all SEC inspections. 5) Subcontractors are responsible for issuing and renewing their staff SBC Id’s under their scope (If required), 6) Required PPE, hand gloves etc. for the employees of subcontractor, 7) Minimum one QC Engineer / supervisor/inspector (based on scope size) 8) Minimum one safety supervisor. 9) Certified scaffolding supervisors, erectors & inspectors 10)Subcontractor should maintain daily proper Housing keeping at site. Note: It is mandatory that the Subcontractor scope of work complies with technical documents, international standards and specifications, within the terminal points, unless explicitly excluded by the Subcontractor in the Commercial Offer and agreed by Al Toukhi Co. in writing, B-SPECIFICATIONS: The following specification shall be followed and considered as references; > Annex#] Scope of work. C- Contract ents: ‘This Contract includes and incorporates the following documents including mutually agreed amendments, a) Purchase Order, b) Al Toukhi Co. General Terms and Conditions, c) RFQ# 10160 seat by Al Toukhi ) Supplier Technical Offer excluding any commercial condition Except otherwise specifically mentioned herein, no other document shall be part of this, Contract. In case of apparent contradictions between these documents, to the extent they cannot be reconciled: the preceding document shall prevail over the dacument that follows, in pete mentioned order. In the event of apparent contradictions between documents on the same level, the waited document shall take priority over the earlier one. | D-~CONTRACT PRIC! ad =~ The price for the above scope of supply is as per the following break - Unit ‘Total Ai it | tem | Description ume: | Uae | TeaLAnee Page. FAX SY gladly 5g) yp Letivall ps gibt As yt AlTouknjfeagtall Al Toukhi Company for Industry, | MESSAGE Trading & Contracting 132 kV GIS & LCC Panels Installation | include OPDMS bet i TER ES.00 Power Transformer Installation inel SA with 2 [Rese Lot 1 50,390.00 | 3. | Sump Pumps Installation & Termination Lot 1 28,420.00 | 4. | Cable Tray & Supports Works Lot 1 94,670.00 LV Control ‘Power Cables laying & 3 | Termination work at 1 BN | 6 |33kV SWGR Installation Lot 1 23,860.00 7_| Auxiliary Transformer Lot 1 2,600.00 8 | Capacitor Bank Installation Lot 1 13,040.00 MV Power Cable Pulling & Clamps 8 lectus, Lot 1 30,090.00 10_| Lighting Works including Lighting Pole Lot 1 253,210.00 ‘AMI, PSE, DSM & Fault Recorder Panels 11 | including remote End Installation Work Lot ! 12,200.00 125VDC & 48V Batteries & Battery Charger, 12 Converter Panel Installation Lot y 17,370.00 13 | NER Installation Work Lot 1 2,880.00 ‘Communication system panels including 14 | remote End installation ie ' aypate 15 Frovortce & Contro! Pancls Installation Lot 1 20,180.00 ork 16 | SAS panels Lot 1 5,790.00 17 | LV AC/DC and lighting Panels Installation Lot 1 8,340.00 18 | Overall Work at Remote End Lot 1 109,790.00 19 | Erection of Gantry work | Lot 1 53,530.00 HV Power Cable Pulling & Cable Clamps, 20 | ink boxes Installation work ee : IED 21 | Earthing & Grounding System overall project | Lot 1 159,530.00 22 | CCTV Erection of Poles & Cameras Lot 1 9,560.00 ‘Total amount equal One Million Five Hundred Thousand SAR Only. 1,500,000.00 | E— PAYMENT TERMS: > 90% of contract value shall be paid through L/C to be opened by Al- Toukhii' Comps within One (1) month from the complete site mobilization date approved by

You might also like