BOGO PARK MAIN

PLUMBING JOB
ESTIMATE
ROLANDO G. JEMINO JR. DATE WORK WORK
325 K Urgello St., Sambag I, Cebu City OF INVOICE START DATE END DATE
1/09/2023 1/ 10/2022 2/27/2023
09667806480 QUOTE VALID PAYMENT
Email Add: NUMBER UNTIL DUE BY
junjeminojr@gmail.com 002

ATTN:
CLIENT MATERIAL QTY UNIT PRICE TOTAL
MA. VIDA CARMENCITA Water Pump (Heavy Duty)) 1 HP 1 pcs 6780.60 6780.60
MARTINEZ Water Valve 1 pcs 1250.20 1450.20
Martinez and Sons Realty Corp.
High Automatic Pressurized water Tank 1 pcs 9759.50 9759.50
2nd Flr. Osmeña Blvd, Cebu City
PPR Pipe - Length 1” - 20 Feet 25 pcs 378.80 9470
PPR Elbow 1” 25 pcs 75.80 1895
Male Adaptor/connector 22 pcs 197.50 4345
Female Adaptor/connector 22 pcs 162.50 3575
Clamp PVC 1” 120 pcs 58.40 7008
PPR Elbow w/ Thread 12 pcs 188.60 2263.2
PPR Tee 1” 12 pcs 138.60 1663.2
Coupling 1” 12 pcs 128.70 1544.4
PPR Valve 1” 12 pcs 248.70 2984.4
TOTAL MATERIALS 52, 738.5

Design, installation and connections of Main Plumbing System of Bogo Park Lodge
1.Design and Layout of the Main Plumbing System
2. Installation of Water Pump and connections of Plumbing line from the Automatic Pressure Tank to the Main Storage
DESCRIPTION OF WORK Tank
3. Plumbing Layout and installations of water outlets and water meter for 22 Rooms
LABOR Days RATE TOTAL
Plumbing Engineer (Highly Skilled) 3 2250 6750
Master Plumber(Highly Skilled) 20 1350 27000
Helper 1 20 750 15000
TOTAL LABOR 48, 750

TERMS AND CONDITIONS MISCELLANEOUS CHARGES QTY PRICE TOTAL


Note: Plumbing Accessories 12 pcs 168.30 2019.60
50% Down payment upon signing a TOTAL MISCELLANEOUS 2, 019.60
contract and progress billing
thereafter

SUBTOTAL 103, 508.10

THANK YOU CUSTOMER SIGNATURE DISCOUNT 5%


DISCOUNT AMOUNT 5175.41
For questions concerning this quote,
please contact SUBTOTAL LESS
98332.695
DISCOUNT
Engr. Jun Jemino - TOTAL TAX 12% VAT
09667806480 AUTHORIZED SIGNATURE TAX AMOUNT 11799.92
TOTAL 110, 132.615