Professional Documents
Culture Documents
KM, 5th KM Stone (1) - 2
KM, 5th KM Stone (1) - 2
5 Nos Bars 6 mm φ
NH-72A
NH-72A NH-72A Each 375 mm Long
ELEVATION
ELEVATION
ELEVATION FACE-II
FACE-I
SIDE ELEVATION
SECTIONAL PLAN
FRONT ELEVATION SIDE ELEVATION
DETAIL OF KILOMETRE STONE
DETAIL OF 200 METRE STONE
SECTIONAL PLAN
130
RB
G.L
A A
PLAN
CLIENT: AUTHORITY ENGINEER : EPC CONTRACTOR : PROJECT : CONCESSIONAIRE INDEPENDENT ENGINEER DRAWING TITLE : DRG. NO. CIPL/D1055/HW/DWG/SP/ 002
Checked By Checked By Checked By Approved By
FOUR LANING FROM KM. 100.757 TO KM. 107.350 Resident cum Highway/
GWALIOR SHIVPURI SECTION OF NH-46 PASSING
Construction Manager Project Manager Team Leader/Resident Engineer
KM,BOUNDARY STONE
THROUGH MADHAV NATIONAL PARK IN THE
Bridge/Structural Engineer
AS BUILT DRAWING
STATE OF MADHYA PRADESH ON EPC MODE BASIS
NATIONAL HIGHWAYS
LEA ASSOCIATES SOUTH DATE :
AUTHORITY OF INDIA ASIA PVT. LTD KRC INFRA PROJECTS PVT LTD. SCALE : AS SHOWN PAPER SIZE : A2