1 which one of the following is not a key element of SRS?

. Business model
Constraints
Assumption
Business requirements

2 ____ manage the system development, assign staff, manage the budget and reporting, and ensure that deadlines a
. Project manager
network engineer
graphic designers
systems analysts

3 a business analyst and his or her team must be aware of both ____ of the presentation.
. the content and its delivery
the content and the audience
the delivery and the audience
the audience and the topic

4 what are the two types of requirements in a solution requirement?


. functional and non functional
hard and soft
functional and technical
non technical and non functional

5 what do you mean by project priorities?


. features to be completed immediately
whose BV value is the highest
whose CP value is highest
Both a & b

6 in swot analysis, a threat is described as?


internal factors that can have a positive impact of the asses group
external factors that can have a positive impact of the assessed group
. external factors that can have a negative impact of the assessed group
internal factors that can have a negative impact of the asses group

7 what is the goal of any elicitation technique?


detrmine the assumptions
risks
. both a & b
desires

8 change request is reported in which log


request log
. change request log
stake holders log
BA log
9 what is an ERD?
Endangered relationship diagram
Entity rational diagram
engaged rational diagram
. entity relationship diagram

10 What is RCA?
Run Chart Analysis
a set of business tools that are used to calculate revenue within a collaborative environment
relative control analysis
. a set of business tools and techniques that are used to identify the root cause of business problems or events

11 what is focus cluster?


relevant stakeholders feedback
. all stakeholders feedback
Client's feedback
BA's Feedback

12 Abbrevation of UML?
. Unified modelling language
Uniform markup language
Unified markup language
United markup language

13 examples of strenght that will include all of the following except for the
an organizational culture of achievement and successes
innovative technologies
brand recognition
patents and trademarks

14 which study ____ determines whether the project should go forward.


. feasibility study
opportunity identification
system evaluation
program study

15 a business case document contains the following except


cost benefit analyses
time estimates it would take to break even
potential impact of new project on existing business operations
. meeting schedule for stakeholders

16 in OOA what is abstractions


considering all required
. considering what is required and ignoring what is not required
considering what is not required and ignoring what is required
none of the above
17 the most effective project goals should be
. SMART
Monitored
Addressed
Assessed

18 who can be a deciding factor for the change requests in aglie?


sponsor
. portfolio product owner
program manager
all of the above

19 what is the first step in conducting organizational change?


to assess the staff, change potential
to assess management change potential
. to assess current state of the organization
to assess market potential of the organization

20 RTM in SDLC is used to ____


. Validate the requirements
check for the completion of the requirements
note the progress of the requirements
update the client

21 which is not a planning factor for BPA


BA Approach
Organizational standards
type of the project
. client's demands

22 how many steps are in the software development life cycle (SDLC)
4
5
7
10

23 you are business analyst preparing for elicitation. You have selected the people who will participate in the elicitatio
Prototyping
interviews
Requirement workshop
. Survey/questionnaire

24 why does a company conduct a JAD?


. to assess the capability of its information system in the presence of a number of stakeholders
to assess the productivity of the different departments
to assess the progression of implemented charges
to analyze the data gathered by the specific stakeholders
25 stakeholder in a JAD session can be of the following EXCEPT
Business analyst
. supplier
technical staff
project manager
g, and ensure that deadlines are met.
ness problems or events
will participate in the elicitation events. While selecting the elicitation events, one of the considerations you need to make is to have open
need to make is to have open or closed ended questions. also, what is the best method for distributing those questions? what technique h
e questions? what technique have you selected for the elicitation events?