CBIM Annex D Environmental and Social Management Plan

KALAHI-CIDSS NCDDP Additional Financing


Environment and Social Management Plan (ESMP)
Region : XII Subproject Title : CONSTRUCTION OF WATER SYSTEM
Province : COTABATO Subproject Total Cost : ₱2,500,000
Municipality : ARAKAN Group :3
Barangay : SAN MIGUEL Phase :2

Time Frame/Schedule
Status of Compliance
for the Implementation
Mitigation/Enhancement Cost of Mitigating with
Potential Impacts Monitoring Parameter of
Measures Measure Mitigation/Enhancement
Mitigation/Enhancement
Measures
Measures
A. Environment
Be located within Careful - No presence of cut Prior to SP On Going Compliance
or nearby Implementation of the down trees implementation
environmentally Project ensuring that
sensitive areas, no tress will be cut
protected areas down in the area of
the proposed project
Located in an Avoid cutting of trees Prior to SP On Going Compliance
erosion-/landslide- and strengthened tree implementation
prone area planting activities
Produce, or increase Implement proper LOBBY TO BLGU Presence of waste Prior to SP On Going Compliance
the production of segregation, collection Purpose: Purchase segregation implementation
solid wastes and disposal of of Bins, sacks, and facilities
wastes etc. Identified
CBIM Annex D Environmental and Social Management Plan

Provide bins for solid waste


wastes disposal sites
Strictly enforce good Presence of
housekeeping signage, checklists
practices

Improper Appropriate and LOBBY TO BLGU Inspection report Prior to SP On Going Compliance
disposal of waste disposal of materials to Allocate fund for Photo Documents implementation
from from Construction the maintenance of
Construction the SP.

 Minimal  Conduct of LOBBY TO BLGU  Attendance Sheet Prior to SP planning On Going Compliance
participation separate to Allocate fund for  Minutes of Meeting Prior to SP
of consultation with the maintenance of  Others: Photo implementation
IPs/Difficulty IP groups the SP. Documentation
in ensuring  Ensure IP
IPs’ membership in
participation the expanded
M/BDRRMC and
BDC-TWG

 Temporary  Appropriate LOBBY TO BLGU  List of signage, list Prior to SP planning On Going Compliance
structures may information to Allocate fund for of precautionary Prior to SP
pose physical dissemination on the maintenance of measures implementation
and/or social potential hazards the SP.  Photo
hazards  Post Warning Devices Documentation

 Increased risk to  Provide appropriate LOBBY TO BLGU  Presence of Prior to SP


community/perso warning signs and to Allocate fund for signage and implementation On Going Compliance
nal health and lighting the maintenance of lighting
safety during  Use of personal the SP.  Photo
CBIM Annex D Environmental and Social Management Plan

construction protective equipment Documentation


activities (PPE) during
construction
 Strict implementation
of health protocols

Other Potential Impacts and Mitigating Measures adopted


e.g. These are context-specific

Instructions in accomplishing the ESMP template:


1. Check relevant items under (i) Potential Impacts, (ii) Mitigation/Enhancement Measures, (iii) Monitoring Parameter, (iv) Time
Frame/Schedule for the Implementation of Mitigation/Enhancement Measures, and (v) Status of Compliance with
Mitigation/Enhancement Measures;
2. Compute and provide the costs necessary for implementing the mitigating measure/s;

Prepared by:

HELEN B. MUEGA DOLOROSA MUEGA JHON PALARGON


Name and Signature of PPT Member Name and Signature of PPT Member Name and Signature of PPT Member

Assisted by:

DENNIS D. ANTIPUESTO C.E. JANNINE ANNE L. LOCARIO C.E. MARY GRACE T. DIAZ
ACT TF MCT TF MCT CEF
CBIM Annex D Environmental and Social Management Plan

Noted:

CHAN JANDEE O. QUIJOTE ELMER S. MONTALES EnP. ARIEL BREEZE BAYAWAN GILBERT G. JALIPA
ACT AC MCT AC BDC TWG Chairperson BDRRMC Head