External information bulletin no. 164/2011 27.12.

2011
replaces external information 011/2010 FIS - fim
0769-04-M

KG Top - „DIN 1946 T4-design“ with TÜV-S certification

Air conditioning units of version KG TOP can be offered now in “DIN 1946 T4 – version”.
For this design a certificate of TÜV-S Munich is available. This design is only available with an extended
delivery time due to the special purchased parts.
Typical particular cases are hospitals, day hospitals, laboratories, the pharmaceutical industry, possibly also
production facilities for electronical devices etc.
For this design the hygiene relevant requirements are certified from the following standards:

 DIN 1946 part 4 (current issue 12/2008)


 VDI 6022 (04/2006)
 DIN EN 13053 (11/2007)

The corresponding certificate can be requested at TK.


The extraordinary measurements are mentioned below.
In case of an order placement, VKA-K encloses the necessary detail drawings.
Air handling units as “DIN 1946 T4-design” are executed as indoor units, due to the required cleaning and
disinfection work (KGW – design possible).

1. Extraordinary measurements

Base: units of the type series KG Top.


Compared to the serial design, concerning order processing and installation the measures mentioned
below have to be taken. In reasonable cases differing or rather higher requirements can be defined by the
planning. If additional measurements are feasible, they can also be put into practice on site.
.

component requirements measurements regarding KG responsible


Top
Air conditioning Outside air suction should be none Planning
located at least 3 m above
earth’s surface and high enough
above roofage. (6.2)
Avoidance of interference of the Avoid short-circuit between FOL Planning
ambience by exhaust air. (6.2) and AUL.
Temperature (5.4) In surgery rooms adjustable from Planning
19 °C to 26°C, otherwise from
22°C to 26°C depending on
utilisation.
Air conditioning Relative humidity (5.4) Generally 30% to 60%; concerning Planning
special room use, possibly
variations necessary

Page1 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
General The complete RLT-installation Only insert verfied non-metal VK, VP
requirements has to consist of materials that components. The following VKA-K
neither emit hazardous materials materials have been verified Installation
nor form medium for microbiologically and are
microorganisms in the air-ducting applicable:
area. (6.1.2) Sikaflex 221 RLT
Mat.-No. 3738227
special order
sealing profile fan outlet
mat.-no. 3900052 to 3900057
drop eliminator profile T400:
mat.-no. 1730433 to 1730440
inspection window: mat.-no.
2000012
only with rework (black
gasket and galvanised screws are
not allowed to get in contact with
forwarded air.
Therefore, bead inside
circulating
cut off and subsequently
hosing, screws to the outside)
silencer baffle only with
glass silk fleece PT102
bag filter (all sizes and
quality categories) as special
order with installed sealing
according to 1946 T4
unit separating profile with lip PVC
Not applicable are
Sikaflex 221 mat.-no. 3710002
Silicone mat.-no. 3710001
U-profile PVC black = (edge
protection profile)

Materials of the casing Inside the unit only use verified VKA-K
construction which get in touch sealing profiles (see above); Installation
with the air flow have to be sealing foam 10 x 2.5 mm between
disinfactant resistant. frame and freerunning fan suction
Sealing profiles have to be plate (mat.-no. 3720019) is not
closed porous and are not permitted, because it is not
allowed to affilliate humidity. located in the air forwarding area.
(6.5.1)

Page2 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Construction All components are accessible Interpose at all non-accessible VKA-K
flow off and against, alternatively locations empty section with
easy and safe to dismantle. inspection door.
(6.5.1) Inspection door:
-KGT 21,43,64,96: with inspection
glass min. 4 R, without inspection
glass min. 3 R
- from KGT 130 on: min. 5 R
(Frost protection frame is not
permittable as accessibility
between heating and cooling coil).
Walls, (incl profiles, bridges) and
ceiling have to be covered inside
(powder at least 60 ym), floor is
generally executed as stainless
steel V2A (at least 1,4301).
Gehäuse KGW Das Ansaugen von gröberen Gitter auf Ansaugteil bei KG Top VKA-K
Verunreinigungen ist durch ein Serie.
korrosionsbeständiges
Maschendrahtgitter
(Maschenweite max. 20x20mm)
zu vermeiden. (6.2)
Casing Surfaces lying in the air flow are No galvanised surfaces are VKA-K
KG/KGW at least galvanised and coated permitted. Surfaces made of
(powder coating or 2-coat-liquid stainless steel or with coating (at
paint at least 60 µm), the floor least 60 µm) necessary.
part of the casing including the If you use galvanised screws you Installation
slide-in rail and all other surfaces have to use protective covers
which engage waterder have to made of plastic.
be made of non-corroding steel
or aluminium. (6.5.1)
Mechanical chracteristics Certificate ofTÜV S is available.
according to EN 1886 (certificate (can be required at TK)
of an independant institute has to
be presented):
mechanical stability at least class Series = D1 (better than D2).
D2
casing leakage class L2 Series = L2.
Outside visible (red) sealing strip Installation
on the floor, ceiling and back wall
Fix all frame rivets (floor and
ceiling) in the visible door area.
V2A Hyg. – frame with foamed
Filter baypass leakage max. 0,5 sealing and withtension spring
% (company Trox).
Series = T2 (better than T3).
Thermal insulation at least class
T3 Series = TB3.
Thermal bridge class at least
TB4, TB3 with weatherproof
design (6.5.3)

Page3 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Outside air suction chamber has To the corresponding chamber(s) VK, VP
is to be executed with a inside (asymmetric=9R) configurate
lying damper K2, pan (length at stainless steel V2A pan, air tight
least 0.5 m) (6.2), drain and door. damper K2 (K4) mit with clip return
(6.5.5) engine and inspection door.
Maintenance and cleaning of the Good accessibility through doors VK, VP
particular componentns incl. filter Walls and ceilings have to be
changing with lowest possible coated (at least 60 ym) floor as
effort. (6.5.2) stainless steel V2A (at least
1,4301). Accessible screw tips Installation
have to be equipped with screw
caps.
Do not use glavanised screws or Only use stainless steel screws Installation
screws with recessed head with hexagonal head.
inside in the floor area, execute Alternatively: cover every screw
floor without gaps. (6.5.1) head with a plastic cap (Best SKS;
10 M6)
Seal floor gaps in the unit (e.g. KG VKA-K
T 380) with special Sikaflex 221 Installation
RLT.
Doors Doors with inspection window Special design: doors overedge VK, VP
(D= min. 150 mm) and inside (105°). Doors at the fan, filter and
illumination at least with fasn, humidifier with inspection openeing
filter and humidifier. (6.5.13) and illumination (e. g. company
Schuch, Worms) inside the unit.
Bulbs without protection grille
Door sealings are not allowed to necessary.
be adhered to; they have to be The door sealings have to be
disassembled for cleaning. provided with adherent magnets (= Installation
(6.5.1) order: LATAM 42x7.7x4.8) on the
backside approx. every 200 mm.
Shut-off Arrange dampers of Weatherproof units are generally VK, VP
dampers weatherproof units inside. equipped with inside dampers. For
For indoor units outside air indoor units the outside air
dampers have to be arranged dampers have to be effected laying
either inside or outside with inside. ZUL-, ABL-, FOL-dampers
double-shelled insulation. (6.5.6) can be outside.
Use coated air-tight dampers Use K2- or rather K4-dampers with
according to DIN EN 1751 K2; spring return motor open- and VK, VP
K3; K4 (by certification of an close (hygienical version), lamella VKA-K
independent test center has to be made of aluminium have to be
presented). (6.5.6) coated, galvanised surfaces are
not permitted.
Gear wheels are not allowed to Coat galvanised surfaces at the Installation
directly get into contact with the spring return motor.
air flow. (6.4.1) Damper wheels are serially outside
the air flow at dampers K2 and K4
The current position of the (better than K3).
damper has to be obvious on the Plan for inside damper inspection
outside of the damper. (6.4.1) window in the door (therefore the VK, VP
position of the lamella is obvious)

Page4 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Silencer Only use baffle with glass silk Use KG Top baffle with glass silk VK, VP
fleece. (6.5.12) fleece, galvanised surfaces have VKA-K
to be coated (silencer completely Installation
coated also permittable)
Not permittable directly after a Verify construction. VK, VP
cooling section with
dehumidification or rather with
humidifier. (6.5.12)
Arrange after the first and before Verify construction. VK, VP
the second filter step. (6.5.12)
Has to be accessible for cleaning Verify, include empty sections if VK, VP
from diffusor and disperse site. applicable
(6.5.1)
Air filter Relative humidity inside the filter Filter drying required before the VK, VP
should be < 90 % r.F. (6.5.7.5) AU-air filter (Wolf plane pipe pre
Cleaning only permitted dust air heater or on-site solution. Use
side. (6.5.7.1) serial filter (F5/ F7/ F9). VK, VP
Lateral extensible filter frames Order V2A filter frame according to
are not allowed to be used. hygienical regulation (with foamed VK, VP
(6.5.7.1) sealing) and with fixing accessory.
The filter is not allowed to rub at Fix filter frame circulating inside
the illumination during operation the casing and seal gaps with
(TÜV-S) Sicaflex RLT 221. strected filter Installation
must not touch the bulb. Use
corresponding device or an
additional inspection part (+2R
length). VK, VP
Only long-bag-filter admissible.

Filter surface is at least 10 m² per VK, VP


m² cross-section surface.
(6.5.7.1)
At least 2 supply air site filter Verify construction; VK, VP
steps have to be provided. provide corresponding quality
1. filter step at least quality category.
category F5, recommended F7
suction site directly next to the
outside air intake
2.filter step at least quality
category F9 pressure side at the
beginning of the supply air pipe
The second filter step is basically
arranged as the last component
of the RLT-unit, i.e. arrange
pressure side after the last air
treating component before the
supply air pipe system. (6.5.7.4)
In the exhaust air area a filter of Verify construction. VK, VP
at least filter class F5 has to be
provided. (6.5.7.4)

Page5 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Avoid position of the filter frame Bag filter frame at the unit section VKA-K
at the unit section point due to point: special construcion encloses
the unit connectors. Prefer drawing „blind bag filter frame“
position at the bridge due to the („Blende Tafi-Rahmen“) Installation
sealing. Installation integrates the blind and
seals the gap.
On each filter step inspection Inspection openeing and VK, VP
opening (D= 150 mm) and inside illumination without protection grille
illumination necessary. (6.5.13) (e. g. company Schuch, Worms) in
the inspection chamber (KGT
21,43,64,96 min. 4R door
from KGT 130 min. 5R door) in
front of the bag filter necessary
(6.5.1). Door at the bag filter
section is sufficient as pure air site
inspection opening (no illumination
necessary).
Arrangement not directly after the Place in-between other functional VK, VP
cooling sections (or heat recovery components (e.g. fan) or respect at
WRG) with dehumidification or least 5 R distance.
humidifiers. (6.5.7.5)
Air filter Type label with the following Put type labels on the Installation
indications: corresponding type series
-filter brand, quantity, type
-filter class
-type of the filter medium
-operating air volume
-beginning and recommended
final pressure drop
-max. permittable final pressure
drop
-date of the last filter change
-date of the next filter change
(6.5.7.6)
Fix on-site on the frist and Choose in the configuration VK, VP
second filter step a pressure Install pressure difference Installation
difference instrument and instrument mat.-no. 2744243 and
pressure difference indicator pressure difference indicator 0-500
without sealing liquid with Pa, mat.-no. 2738 370, with visible
display. (6.5.13) area at the unit and connect air
technically.
Humidifier Due to hygienical reasons, for For surgeries only heat steam VK, VP
surgeries only steam humidifier a humudifier applicable.
are admissible (6.5.11). Systems without steam
Only systems can be used that are humidification need a certificate
sanitary harmless (6.5.11). according to
DIN 1946 T4 (12/2008).
Installation
Gaps have to be sealed with Sika-
flex 221 RLT (pan, wall, ceiling).
Arrangement of the second filter Verify construction VK, VP
step. (6.5.11)

Page6 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Relative humidity according to Verification, proper calculation Planning
humidifying track < approx. 90%. must not exceed 90% r.F. VK, VP
r.F. (6.5.11)
Corrosion resistant, able to be All inside surfaces, also the pans VK, VP
cleaned and sterilized. (6.5.11) of the humidifier (steam) made of VKA-K
stainless steel at least 1,4301. Installation
Stayer (e.g. at the door) have to be
embraced with a 90° anglel made
of 0,5 mm stainless steel V2A.
There are no galvanised or coated
surfaces admissible.
Inside illumination with inspection Configurate illumintaion in 24 V VK, VP
glass. (6.5.13) and inspection glass without
protection grill.
The components to humdification Verification, Planning
have to be easily accessible, plan door (KGT 21,43,64,96 min. VK, VP
visitable and cleanable. (6.5.11) 4R; from KGT 130 on min. 5R). If
there are doors with 7R,
additionally provide with fastening
below and above.
Door has to be over canted with
105° (instead of 90°), (because the
magnets in the door rubber do not
fix on the stainless steel V2A
inside sheet). Door with inside
frame. Inside frame with Armaflex
3 mm.
Heating coils Have to be accessible on both Verififcation, if necessary include VK, VP
sides. (6.5.8.1) empty sections
Lamella spacing at least. 2.0 Coated frame, Cu-collector, ALU VK, VP
mm, air-ducting surfaces lamella (coil with proper coating 60
corrosion resitant. (6.5.8.1) µm admissible).
Unit heaters have to be designed From KG Top 380 on, use slide in VKA-K
in that way that they can easily rails of V2A.
be cleaned. (6.5.8.1)
Heating coils / Tight lead-throughs Armaflex in in the wall has to be Installation
cooling coils Dry wall insulations. (6.5.3) executed thicker about 60 mm; so
the wall insulation at the cooling
coil stays dry.
Cooling coils They have to be accessible from Verify, if necessary include empty VK, VP
both sides. (6.5.8.1) sections.
The accumulator is to be made of Order special coil CU-Al. VKA-K
copper or stainless steel Stainless steel V2A frame has to
Cooling coil frame made of be burred, this applies for order Installation
stainless steel V2A and installation.
Coil with fin spacing of at least Risk of injury during installation on
2,5 mm. (6.5.8.2) site. (V2A-clear coating
admissible).
Arrangement of the second filter Verify construction. VK, VP
step. (6.5.8.2)
Air cooling coils are designed so Order burred design VKA-K
that they can be easily cleaned On the floor stainless steel pan
(6.5.8.1) and stainless steel slide-in rail.

Page7 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Cooling coil For an easy cleaning, all Verify construction. All condensate VK, VP
condensate connections have to drain plugs on operation side.
be put on the same side.
(6.5.8.1)
Cooling coils / Corrosion resistant, able to be Drop eliminator frame made of VKA-K
drop eliminator cleaned and sterilized. (6.5.8.3) stainless steel 1,4301, AlMg or
equivalent. During low air
verlocities (<2m/s) the drop
eliminator together with the slide-in
rail can be omitted.
Drop eliminator removable. Execute drop eliminator frame VKA-K
(6.5.8.3) screwed with stainless steel V2A Installation
screws (drop eliminator-frame has to
be deburried, i.e.. clear coating).
Fan Inside illumination and inspection Configurate inside illumintaion VK, VP
glass necessary. (6.5.13) without protection grill (e.g.
company Schuch in Worms).
Arrangement between first and Verify construction. VK, VP
second filter step. (6.5.10)
Easy accessibility for operating Provide doors on both sides of the VK, VP
and maintenance purposes. baffle (front panel).
(6.5.10)
Freerunning fans have to be Configurate coated (60 µm), Planung
prefered due to hygienical preferred EC-venti or with external VK, VP
reasons. (6.5.10) FU, Fan section with display
Constant air flow has to be opening and illumination
ensured Cable routening (also of the
Air volume / pressure gauge measuring hose) as short as Installation
outside on the unit. (6.5.13) possible without empty conduit.
Differential pressure display 0-
1600 Pa (mat.-no. 2738372)
choose during configuration and
install in the visible area on the unit
and connect air technically.
Radial fans with spiral casing Avoid, (because the verification VK, VP
need water drain with plug and has only been executed with
from KG 130 on (nominal diameter freerunning fan)
400 mm) an inspection cap. Casing fans up to KG Top 130
(6.5.10) have to be coated (60 µm) and
easily demountable. Consider door
opening and cable size.

Page8 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
The following information have to Corresponding type label Installation
be fixed permanently on every Special type label hygiene
fan chamber: Use mat.-no. 6613731
Inscribe the following data:
type / design / year of KG Top ......-1946 T4 / year of Installation
construction construction + calendar week
Free running fan / type – from
Nominal air volume order/ year of construction
Total pressure increasing calendar week
Max. speed / nominal speed
Engine capacity Total pressure from the order = p
Rotational direction of the fan tot
impeller (e.g. label on the Nominal speed + additional
impeller) max. speed on the fan type label

Rotational direction is serially fixed


on the fan.
Heat recovery Arrangement between first and Verify construction; due to the VK, VP
WRG second filter step. existing fins, this heat recovery
WRG heat exchanger is not
permitted as filter dryer.
In rooms, where there is no room If there are increase hygienical VK, VP
comprehensive return air requirements (hygiene VKA-K
operation admissible and requirements for hospitals) only
increased hygiene requirements KVS is admissible. (leakages due
exist, only WRG-systems are to the mounting at Wolf or on site
admissible, with which no are unavoidable).
material transfer is possible. If a heat wheel heat exchanger or
(6.5.9) a plate heat exchanger is used,
there has to be always a pressure
drop between outside air and
exhaust air during all operational
levels (pushing from the supply air
fan (ZUL-Venti), sucking from the
exhaust air fan (ABL-Venti)).
Bypass dampers do not need a
spring return motor.
Corrosion resistant pans made of Verify construction VK, VP
non-corrosion steel or aluminium No drop eliminator necessary for
necessary on the supply and supply air (ZUL).
exhaust air side. (6.5.5)
Duct Flexible connection not Configuration: coated (60 µm) Duct VK, VP
connection admissible due to folding. connection frame with circulating Installation
Armaflex necessary impact sound
decoupling.
Siphone Integrating sphere at least 40 Wolf integrated sphere siphone VK, VP
connection mm (can also be provided on with DN40 = series (max. 150l/h
site). discharge volume possible).
Function At the unit chamber function Mark unit parts on the outside: Installation
symbol symbols are necessary outside Put labels on the preheating coil,
on the unit chamber. filter section F7, heating coil,
cooling coil, fan section, silencer
section, steam humidifying section,
filter section F9;

Page9 of 10
External information bulletin no. 164/2011 27.12.2011
replaces external information 011/2010 FIS - fim
0769-04-M

component requirements measurements regarding KG responsible


Top
Installation Sufficient advice for hygiene Additionally to the installation Installation
manual required manual, enclose hygiene manual
mat.-no. 3040323

Delivery time: On request


Prices: On request

Modifications: - Mat. No. of differential pressure display (filter monitoring)


- Mat. No. of Sikaflex 221 RLT completed.
- Mat-No. of differential pressure display (ventilation) completed.
- Advice spring return motor in hygienical version completed.

Best regards

Wolf GmbH

ppa. Frank Stocker i. A. Miriam Fisch

Page10 of 10

You might also like