Siddababa Tunnel Project

Daily Progress Report


Date: Friday, June 7, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 35°C Min Temp. : 25°C Humidity: 51%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)
1.1 Personnel-Technical Staff 1.2 Personnel-Service & Support 1.3 Personnel-Operator
S.N. Description Name Nos S.N. Description Nos S.N. Description Nos
Public Relation Officer (Mr. Mahendra Poudel)
1. Project Manager Mr.Zhou He You 1 11. 1 19. Driver 5

20. Operator 6
Mr.Yan Wei Safety Engineer/ Manager/Officer
2. Procurement Officer 2 12. 1
Mr. Zheng Hongjiang (Mr.Huang Yi Cheng)

13. Translator (Mr. Abhishek Sharma , Mr.Jit Tamang, Mr.


3. Warehouse Manager Mr.Li Jin Lian 1 4
Ranjit Regmi,Mr. Ramesh Pandey)

4. Accountant Mr.Lin Jiang Feng 1 14. Account Helper(Nisha Pandey) 1

5. Geologist Mr.Ganga Ram Maharjan 1 15. IPC engineer(Suman Gautam) 1


Mr. Su Guo Fa , 16. Cook 5
Mr.Liang Hao, 17. Cleaner 2
Mr. Zhao Chen Peng, 18. Security Guard 6
Mr.Lei Hong Jun
Mr. Chen Shao Lin
Mr. Li Tang Pei
Mr. Xu Xiao Po
Mr. Yudhisthir Panthi
Mr. Shreejesh Poudel
6. Tunnel/Site/Civil Engineers Mr. Hunag Yichen 18
Mr.Huang Guiping
Mr.Huang Hudi Mo
Mr.Wu Jian Guo
Mr.San jui(shotcrete operator)
Mr. Kaushal Raut
Mr. Deepak Sunar
Mr. Kaushal Raut
Mr.Suresh Ayer

7. Mechanical/Material Engineer Mr.Kshitiz Khanal 1

Mr. Zhang Ze Peng


Mr. Mohan Bohara
8. Surveyor 3
Mr. Harka Bista .

Mr.Zhang Jin Gui


Mr.Aklesh Kr. Sahani,
9. Lab Engineer/Technician Mr.Sandip Kandel 4
Mr.Deepak Bastola

10. QA/QC Engineer Kushal Gautam 1


Total 33 Total 21 Total 11
21. North Portal Site 22. Main Tunnel /South Portal Site

Welder/Carpenter/ Barbender/ Shotcrete


Driller/Shotcrete worker 6 2 Shotcretor/ Mason Skilled/scaffolder 7 Electrician/welder 2
worker/Traffice Controller

13 15
Electrician/operators 0 Shotcretor/ Mason Unskilled Driller 0 Operator 3

Technician/Supervisor 3 Extra technician 2 Technician/ Supervisor 3 Extra technician 0

23. Workshop 24. By-Pass 2

Welder /skilled 2 Electrician Helper Worker 4 Driller

Shotcretor/ Mason
Worker 2 Operators 6 Technical/Supervisior 2 6
Unskilled

Technician/Supervisor 2 Extra Technician Electrician Safety officer

25. Slope Protection MR 1 & Road maintenace work 26. BY-Pass 1and By-pass 3
Driller/Shotcrete worker
6 Worker at road maintenace 10 Worker in By-Pass 3 5 Driller in By-Pass 1 4
in MR-1
Workers/Operators in MR- 22 Technical/Supervisi 13
4 0 Technical/Supervisior in By-Pass 3 2 2
1 or in By-Pass 1
Technician/Supervisor in
2 0 Electrician/welder
MR-1
Grand Total 140

2. Major Equipment at site

Hrs. Down Description Down


S.N. Description Nos Hrs. Down time S.No. Description Nos Down time S.N. Description Nos Hrs. S.No. Nos Hrs.
time time

14+12 Concrete High Pressure Double


Excavator Pneumatic Jaak Hammer 12X5+3
1. 5 +12+0 0 7. Transit 3 3+3+3+3 0 13. 32 0 19. Fluid Grouting Pump 1 0 0
X6
+0 Mixer
Drilling
Hydraulic Pressure Breaker 14+12 0 Concrete Batching Plant Dry Shotcrete machine
2. 3 0 8. Machine 1 0 14. 1 2 0 20. 4 2+0+0+0 0
+0
(ROC)/DTH
10+10 Ground Robotic Shotcrete
3. Hilux / Pickup 5 +10+1 0 9. Concrete 1 0 0 15. Generator (400 KW) 1 0 0 21. 1 2 0
Machine
0+10 Pump

Air
4. Tripper 11 6X11 0 10. 4 12+0+0+0 0 16. Generator (600 KW) 1 0 0 22. Core cutter 8 0 18
Compressor

Grouting
5. Wheel Loader 3 6+6+2 0 11. Machine 1 0 0 17. Electric Compressor 1 0 0 23. Potable air compressor 1 12 0
(Low

6. Jumbo drill 0 0 0 12. Jet Fan 2 5+2 0

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Friday, June 7, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 35°C Min Temp. : 25°C Humidity: 51%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

Conducted Ref. Description


S.N. Test/Sampling/Inspect Ref. Standard Description (Test code) Test Machine S.N. Test/Sampling/ Inspect Test Machine
No. of Test Standard (Test code)

7 days Compressive strength


CSCEC-STP-ST-20240531-
1. test of shotcrete C25/30 at EN 12390-3 Automatic compressive strength test machine. 3.
1
North main tunnel rib to rib.

3 days Compressive strength


test of early strength mortar CSCEC-STP-ST-20240604-
2. EN 445 Automatic flexural & compressive strength test machine. 3.
Rockbolt grouting at North 1
main tunnel.

7 days Compressive strength


test of early strength mortar CSCEC-STP-ST-20240531-
3. EN 445 Automatic flexural & compressive strength test machine. 3.
Rockbolt grouting at North 1
main tunnel.

Blasting Material log

S.N Detonator Delay No. Quantity Aviable Unit Quantity Demanded Consumed Quantity Remaining Quantity

1 10178 54 10124
NED-1 Nos.
2 2274 20 2254
NED-3 Nos.
3 3743 21 3722
NED-5 Nos.
4 10079 50 10029
NED-7 Nos.
5 9394 43 9351
NED-9 Nos.
6 13000 44 12956
NED-11 Nos.
7 13773 68 13705
NED-13 Nos.
8 0 0 0
NED-15 Nos.
Emulsion-(Power
9 34842 400 34442.0
Gel)32mm Kg.
10 ED 1350 3 1347
Nos.
11

12

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Friday, June 7, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 35°C Min Temp. : 25°C Humidity: 51%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

5. Material available (Permanent works)

Balancce Quantity Up Quantity Production/ Remain-ing


S.N. Material Unit QA/QC Ref. available Consumption Qty this Day QA/QC Supply Ref Remarks
to previous day Supply this day Qty

CSCEC-STP-CA-
1. Aggregates(8 mm) MT -7,352.71 -27.00 -7,379.71
20231004-1

CSCEC-STP-CA-
2. Aggregates(16mm) MT 30.05 30.05
20231004-2

CSCEC-STP-CA-
3. Aggregates(22.4mm) MT 108.57 108.57
20231005-1

CSCEC-STP-FA-
4. Sand MT -569.66 -38.23 -607.89
20231009-1

CSCEC-STP-C-20231008-
5. Cement MT -83.57 -16.380 -99.95
1

CSCEC-STP-R-20231014-
6. Rebar 6mm(500 D) Kg -2,108.26 -1,152.00 -3,260.26
1

CSCEC-STP-R-20231014-
7. Rebar 8mm Fe500D Kg 6,418.00 6,418.00
2

CSCEC-STP-R-20231013-
8. Rebar 12mm Fe500D Kg -2,073.58 -2,073.58
1

CSCEC-STP-R-20231013-
9. Rebar 20mm Fe500D Kg 5,051.19 5,051.19
3

CSCEC-STP-R-20231013-
10. Rebar 25mm Fe500D Kg -27,753.27 -694.44 -28,447.71
4

11. Plate 3.60mm-4.00 4X16 Kg 40,922.10 40,922.10

12. BL Pipe 6.00'' (H) m -84.00 -84.00

13. BL Pipe 8.00'' (H) m 21.20 21.20

CSCEC-STP-SA-
2. I-Beam (100 by 180) Kg 42,860.69 -266.02 42,594.67
20231014-1

Chemicals-PCA-1
15. Kg -5,571.83 4572/079/080 -5,571.83
Admixture

233 Pcs of DCP Gewi bar CSCEC-STP-ANC-


16. pcs 37.00 37.00
with complete accessories 20231216-1

17. Plate 12mm x4x8 kg 5,800.00 5,800.00

6. Material available (Temporary works)

Balancce Quantity Up Quantity Production/ Remain-ing Remark


S.N. Material Unit QA/QC Ref. available Consumption Qty This Day QA/QC Supply Ref
to previous day Supply this Day Qty s

1.
Cement MT 0.00 0.00

2. Sand MT 4.83 4.83

3. Aggregates(8 mm) MT 48.98 48.98

4. Aggregates(16mm) MT 0.00 0.00

5. Aggregates(22.4mm) MT 49.35 49.35

6. Rebar 6mm(500 D) kg

7. Rebar 20mm(500 D) kg

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Friday, June 7, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 35°C Min Temp. : 25°C Humidity: 51%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

7. Work Progress for General Works

S.N.
Description of
Ref. Map or Layout Codes in Lay Out Work Description Unit L B H Quantity Remarks
Item

Main Tunnel(south)

MS-III-A Support system installation cycle 7.00


K0+997.5-
Installing 25mm dia rockbolt @3m nos. 60.00
1+004.5
i. DD-MT-19-A1 Sheet 1 of 2 South main tunnel pull
C25/30 Shotcrete m3 36.00
Bench rib installation and C25/30
K0+930.5-934.5 nos. 5.00
shotcrete
ii DD-SP-03-A2 South Slope protection work

Bypass
iii. DD-BP-04-A3 Sheet 1 of 1 L1K0+029 By-Pass 1

Blasting work kg 75
iv. DD-BP-05-A2 Sheet 1 of 1 L2K0+021.6 By-Pass 2
Mucking work m3 50

Blasting work kg 75
v. DD-BP-06-A2 Sheet 1 of 1 L3K0+026.1 By-Pass 3
Mucking work m3 50

MR-1

Spraying C25/30 dry shotcrete at H11.5-9.5 m3 12


Sheet no.
vii. DD-RA-10-A1 K0+820-800
8,9,10,11,12,13 of 51

Main Tunnel North

Blasting work kg 250


viii. DD-MT-19-A1 Sheet 1 of 2 K1+943.6 North main tunnel
Mucking work m3 288

9. RFI Note:

10. Social Issues If any:

11. Photos

Photo No. 1: MS-III-A support system installation work at South main tunnel Photo No. 2:Drilling tunnel face for loading explosive materials

Photo No. 3:Surveying work at South main tunnel for checking overbreak and underbreak after
Photo No. 4: Benching work at South main tunnel