Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

PALMA SERASIH GROUP


PT BATU BORNEO PERDANA
DEPARTMENT TEHNIK

Time
Configurasi MP Mechanic Name Remaks Component Planner
(Hour)
Masuk yusri/Febryanto/jumri 0.0 4
Job Order Man Power Izin
4 masuk
0 yusrijumriadi/febryant 28.0 masuk
Work Shop Sakit 0 yusri/jurhanryanto/feb 0.0 masuk
Cuti 0 yusri/jurhanryanto/feb 0.0 masuk 0 0 0 0 0 0 0
Hari / Tanggal : Mandah 0 0 0.0 0
02 Juni 2024 Mangkir 0 0 0.0 0
Dinas 0 0 0.0 0
TOTAL MP 4 0 0.0 0
MAN POWER TARGET JAM PENGERJAAN
TINDAKAN
NO CODE UNIT HM / KM DATE BD JENIS KERUSAKAN COMPONENT RFU KETERANGAN
PERBAIKAN
NAME STATUS TAG START FINISH JUMLAH (JAM)

1 DT 15 - 02/06/24 ganti ban replace Attachment yusrijumriadi/febryanto/ju b0 3 30.05.2024 7:00 16:00 7.0 Onprogress
2 Greder 01 - 23/05/24 instal ban dan pasang radiator repair Attachment yusrijumriadi/febryanto/ju b0 3 30.05.2024 7:00 16:00 7.0 Onprogress
3 DT 05 - 31/05/24 bocor ban repair Attachment yusrijumriadi/febryanto/ju b0 3 30.05.2024 7:00 16:00 7.0 Onprogress
4 DT 14 - 02/06/24 servic rutin lubricate Attachment yusrijumriadi/febryanto/ju b0 3 30.05.2024 7:00 16:00 7.0 Onprogress

Status : B0 = Under Repair, B1 = Tunggu Parts, B2 = Tunggu mekanik, B3 = Accident, B4 = Weather, NA = Scheduling repair / overhaul

Mekanik
Electrican
Welder CUACA :