2930 3120 5777 11994

TR-7 Branch 1 TR-7 Branch 1 TR-7 Branch 1 TR-7 Branch 1


160 L(m) = 2.93 200 L(m) = 3.12 250 L(m) = 5.77 315 L(m) = 12 TR-7
Branch 1
19890

4570
Center-Center L19.89 (m) * W4.57
20 MCS / 9 span * 2.21m

2930 3120 5777 11591

TR-7 Branch 2 TR-7 Branch 2 TR-7 Branch 2 TR-7 Branch 2


160 L(m) = 2.93 200 L(m) = 3.12 250 L(m) = 5.77 315 L(m) = 11.6 TR-7
Branch 2

2930 3120 5777 11127

TR-8 Branch 1 TR-8 Branch 1 TR-8 Branch 1 TR-8 Branch 1 TR-7 Branch 1
160 L(m) = 2.93 200 L(m) = 3.12 250 L(m) = 5.77 315 L(m) = 11.13
2210 315 L(m) = 19.38

19379
19890

4570

AHU AREA
45(M2)
Center-Center L19.89 (m) * W4.57
20 MCS / 9 span * 2.21m TR-8

14029
Branch 1
2930 3120 5777 10677

TR-7 Branch 2
TR-8 Branch 2 TR-8 Branch 2 TR-8 Branch 2 TR-8 Branch 2
315 L(m) = 14.03
160 L(m) = 2.93 200 L(m) = 3.12 250 L(m) = 5.77 315 L(m) = 10.68

12787
TR-8
TR-8 Branch 1
Branch 2 315 L(m) = 12.79

TR-8 Branch 2
Steel Staircase

8456
315 L(m) = 8.46

TR-7
Elevator

POINT 1:
EXISTED TR-7 & TR-8 TR-8
PVC VACUUM PIPE LAYOUT
VACUUM
T.R 7
Branch 1 TR-8 Branch 2 TR-7 2461
PLENUM
DUCT
Total Length (m)= 27.14 Total Length (m)= 32.67

793
315 PVC 250 PVC 200 PVC 160 PVC 160 PVC 200 PVC 250 PVC 315 PVC

Panel
T.R 7
L (m)= 13.31 L (m)= 5.77 L (m)= 3.12 L (m)= 2.93 L (m)= 2.93 L (m)= 3.12 L (m)= 5.77 L (m)= 20.85

13312 5770 3120 2930 1962


5217 2930 3120 5770 15600

4785
VACUUM
T.R 8 SMOKE
DUCT

4875

4875

32
0
46 13837 5770 3120 2930

3
0 2930 3120 5770 13807
9
Panel
T.R 8

Blower 2
Panel
PLENUM
315 PVC 250 PVC 200 PVC 160 PVC 160 PVC 200 PVC 250 PVC 315 PVC
DUCT
L (m)= 2.93 L (m)= 3.12 L (m)= 5.77 L (m)= 25.76
AHU Panel

L (m)= 3.12 L (m)= 2.93


Hemak

L (m)= 13.84 L (m)= 5.77


BUSWAY 2000A
LINE 2

Branch 2 TR-8 Branch 1 TR-7


Main Panel 1600A

BUSWAY 2000A

4570
Hemak

LINE 1

Total Length (m)= 32.27 Total Length (m)= 37.58

25850 25850
Center-Center L25.85 (m)*W4.875 Center-Center L25.85 (m)*W4.875
24 MCS / 11 span * 2.35m 24 MCS / 11 span * 2.35m

VACUUM
T.R 7
Branch 1 TR-8 Branch 2 TR-7 2461
PLENUM
DUCT
Total Length (m)= 27.14 Total Length (m)= 32.67

793
315 PVC 250 PVC 200 PVC 160 PVC 160 PVC 200 PVC 250 PVC 315 PVC

Panel
T.R 7
L (m)= 13.31 L (m)= 5.77 L (m)= 3.12 L (m)= 2.93 L (m)= 2.93 L (m)= 3.12 L (m)= 5.77 L (m)= 20.85

13312 5770 3120 2930 1962


5217 2930 3120 5770 15600

4785
VACUUM
T.R 8 SMOKE
DUCT

4875

4875
32
03
46 13837 5770 3120 2930 2930 3120 5770 13807
09
Panel
T.R 8

Blower 2
Panel
PLENUM
315 PVC 250 PVC 200 PVC 160 PVC 160 PVC 200 PVC 250 PVC 315 PVC
DUCT
L (m)= 2.93 L (m)= 3.12 L (m)= 5.77 L (m)= 25.76
AHU Panel

L (m)= 3.12 L (m)= 2.93


Hemak

L (m)= 13.84 L (m)= 5.77


BUSWAY 2000A
LINE 2

Branch 2 TR-8 Branch 1 TR-7


Main Panel 1600A

BUSWAY 2000A
Hemak

LINE 1

Total Length (m)= 32.27 Total Length (m)= 37.58

25850 25850
Center-Center L25.85 (m)*W4.875 Center-Center L25.85 (m)*W4.875
24 MCS / 11 span * 2.35m 24 MCS / 11 span * 2.35m

TR-8 VACUUM & PIPE TR-7 VACUUM & PIPE


PUT INSIDE THE BUILDING PUT ON VACUUM PAD
ON AHU HEMAK SIDE EXTERNAL BUILDING