Reservoir Data

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PARTICULARS OF MAJOR RESERVOIRS AND BARRAGES AS ON 27.02.2024.@ 06:00 A.M.

THIS YEAR 27.02.2024


LAST YEAR AS ON 27.02.2023
Present Cumulative Outflow details in Cusecs
Gross Average inflows in this Average Flood
RESERVOIR F.R.L.
S.No Capacity Inflows of water year Outflows of Cushion
(Distance from origin of river) in feet Level in Storage Power Level in Storage Inflows Outflows
in T.M.C. last 24 hrs in T.M.C last 24 hrs Spillway Canals Others in T.M.C
Feet in T.M.C. House Feet in T.M.C in Cusecs in Cusecs
in Cusecs (From in Cusecs
01.06.2023)
(9)=(10) to (14) =
(1) (2) (3) (4) (5) (6) (7) (8) (10) (11) (12) (13) (15) (16) (17) (18)
(13) (4) - (6)
KRISHNA BASIN
1 ALMATTI (518 km)* 1705.00 129.72 1683.96 50.48 0 228.98 1631 0 0 1510 121 79.24 1685.37 53.70 0 13923

2 NARAYANAPUR (590 km)* 1615.00 37.64 1602.89 22.81 0 168.30 3791 720 0 3071 0 14.83 1613.06 34.99 9561 11442

3 UJJAINI 1630.00 117.24 1606.71 55.11 0 63.02 225 0 0 0 225 62.13 1625.25 101.03 0 1851

4 JURALA (775 km) 1045.00 9.66 1034.65 4.30 0 153.78 428 0 0 312 116 5.36 1038.02 5.78 80 786

5 TUNGABHADRA 1633.00 105.79 1587.02 8.72 0 112.06 2510 0 749 1670 91 97.07 1605.87 30.12 0 8344

6 SRISAILAM (985 km) 885.00 215.81 815.90 37.91 -22 142.20 1153 0 0 960 193 177.90 824.00 43.95 8563 4599

7 NAGARJUNA SAGAR (1107 km) 590.00 312.05 516.40 142.79 0 128.05 2067 0 483 1350 234 169.25 550.00 209.77 8797 29241

8 PULICHINTALA (1210 km) 175.00 45.77 126.67 5.61 0 34.22 200 0 0 0 200 40.16 172.90 42.57 3200 3200

9 PRAKASAM 57.05 3.07 53.95 2.26 0 179.33 0 0 0 0 0 0.81 56.85 3.03 3228 3228

GODAVARI BASIN
10 JAIKWADI 1522.00 102.73 1505.01 46.60 1 24.11 2633 0 0 2368 265 56.13 1516.76 82.36 0 3104

11 SINGUR 1717.93 29.92 1712.11 21.11 0 21.57 725 0 0 450 275 8.81 1713.35 22.74 0 590

12 NIZAM SAGAR 1405.00 17.80 1397.15 8.56 0 43.07 2350 0 0 2155 195 9.24 1398.42 9.74 0 2259

13 SRI RAM SAGAR 1091.00 90.31 1071.20 31.42 0 199.51 7973 0 0 7526 447 58.89 1077.70 46.45 0 5933

14 LOWER MANAIR DAM 920.00 24.07 895.65 8.24 1863 62.16 2361 0 0 2268 93 15.83 905.25 13.19 5000 5779

15 KADDAM 700.00 7.60 677.58 3.13 0 60.39 77 0 0 9 68 4.47 688.30 4.92 194 648

16 SRIPADA YELLAMPALLI 485.56 20.18 472.44 10.68 0 396.10 685 0 145 468 72 9.50 483.63 18.54 3396 5647

17 S.A.COTTON BARRAGE 44.75 2.93 44.92 2.96 9124 3052.81 8970 0 0 8970 0 0.00 43.21 2.61 7219 7295

PENNAR BASIN

18 VELIGODU BALANCING RESERVOIR 868.44 16.95 824.17 1.86 0 12.00 50 0 0 0 50 15.09 846.49 7.45 0 780

19 SOMASILA 330.00 78.00 286.38 17.42 0 29.77 3785 50 2450 1150 135 60.58 322.45 61.75 124 3515

20 KANDALERU 278.89 68.03 214.99 10.26 0 2.78 790 0 0 750 40 57.77 261.58 44.95 0 1840

VAMSADHARA & OTHER BASINS


21 YELERU 284.00 24.10 244.52 7.89 73 15.17 1240 0 0 1240 0 16.21 264.80 14.24 60 1185

22 GOTTA BARRAGE 125.00 0.66 118.24 0.13 156 81.14 156 0 0 156 0 0.53 118.86 0.17 110 340

Total Storage Cap. of T.S. and A.P.


Reservoirs
966.90 316.53 650.41 551.83
(4+6+7+8+9+11+12+13+14+15+1
6+17+18+19+20+21+22)
Note: Please visit the above particulars on the Web Site:https://irrigationap.cgg.gov.in User id:guest,password:guest. FLOOD CELL, VIJAYAWADA Ph.No: 0866-25747260
Note:-* READINGS AS ON 26.02.2024 @ 8.00A.M
PARTICULARS OF BARRAGES AS ON 27.02.2024 @ 06:00 A.M.
1 S.A.COTTON BARRAGE, DOWLAISWARAM
CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
Depth of water in UTILISATION IN UTILISATION IN T.M.C. SURPLUS IN TMC SURPLUS IN TMC
Discharge As on Today
Arms feet (above Crest DISCHARGE INTO CANALS IN GODAVARI DELTA T.M.C. FROM FROM 01.06.2022 TO INTO SEA FROM INTO SEA FROM
in Cusecs in Cusecs
level of +35.00 ft.) 01.06.2023 to Till SAME DATE OF LAST 01.06.2023 to TILL 01.06.2022 TO
date YEAR DATE SAME DATE OF
(a) Dowlaiswaram Arm 9.90 0 1 Eastern Delta (Canal opened on 01.06.2023) 2650 72.41 54.95 LAST YEAR

(b) Rali Arm 9.80 0 2 Central Delta (Canal opened on 01.06.2023) 1720 42.71 33.94
(c) Maddur Arm 9.60 0 3 Western Delta (Canal opened on 01.06.2023) 4600 113.88 96.76
(d) Vijjeswaram Arm 9.50 0 4 Industrial Discharge 0 0.00 0.00
2820.76 6233.14
Total Surplus (Outflow over Crest) 0 TOTAL 8970 229.00 185.66
Inflow in Cusecs TOTAL SURPLUS INTO SEA FROM 01.06.2022 to 31.05.2023 in
9124 6252.390
T.M.C.
TOTAL UTILISATION FROM 01.06.2022 to 31.05.2023 in T.M.C 218.050
Depth of water in feet
9.90
(above Crest level) PATTISEEMA DETAILS TODAY : Level - 13.561 m (44.49 ft) , Minimum level required to lift the water-14 m (45.93 ft), Number of pumps operated : 0, Drawals : 0 Cusecs,
Cumulative drawals : 58.7241 TMC , Last Year Cumulative Drawls at same date: 0 TMC.

2 PRAKASAM BARRAGE , VIJAYAWADA


CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
UTILISATION IN UTILISATION IN T.M.C. SURPLUS IN TMC SURPLUS IN TMC
Discharge As on Today INTO SEA FROM
DISCHARGE INTO CANALS IN KRISHNA DELTA T.M.C. FROM FROM 01.06.2022 TO INTO SEA FROM
in Cusecs in Cusecs 01.06.2022 TO
01.06.2023 to Till SAME DATE OF LAST 01.06.2023 to TILL
Depth of water in feet date YEAR DATE SAME DATE OF
(above Crest level of 8.90 LAST YEAR
1 Eastern Main Canal ( Canal Closed on 15.02.2024) 0 67.53 107.60
+45.05)
2 Western Main Canal (Canal Closed on 15.02.2024) 0 43.37 67.99
3 Guntur Channel ( Canal Closed on 15.02.2024) 0 0.93 1.61 67.82 1322.95
4 Lift Irrigation Scheme 0 0.00 0.00
Total Surplus (Outflow over Crest) 0 TOTAL 0 111.83 177.20
TOTAL SURPLUS INTO SEA FROM 01.06.2022 to 31.05.2023 in
1328.760
T.M.C.
Inflow in Cusecs 0 TOTAL UTILISATION FROM 01.06.2022 to 31.05.2023 in T.M.C 194.360

3 GOTTA BARRAGE , VAMSADHARA (Boddepalli Rajagopala Rao Project)


CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
Depth of water in feet UTILISATION IN UTILISATION IN T.M.C. SURPLUS IN TMC SURPLUS IN TMC
As on Today
(above Crest level of 8.24 DISCHARGE INTO CANALS, GOTTA BARRAGE T.M.C. FROM FROM 01.06.2022 TO INTO SEA FROM INTO SEA FROM
Discharge in Cusecs
+110.00ft.) 01.06.2023 to Till SAME DATE OF LAST 01.06.2023 to TILL 01.06.2022 TO
in Cusecs date YEAR DATE SAME DATE OF
Upstream in feet 118.24 1 Right Main Canal ( Canal Closed on 03.02.2024 ) 0 6.09 5.78 LAST YEAR

Downstream in feet 98.43 2 Left Main Canal ( Canal Opened on 08.07.2023 ) 156 21.33 19.89 50.91 124.68
Total Surplus (Outflow over Crest) 0 TOTAL 156 27.42 25.67
TOTAL SURPLUS INTO SEA FROM 01.06.2022 to 31.05.2023 in
124.680
T.M.C.
Inflow in Cusecs 156 TOTAL UTILISATION FROM 01.06.2022 to 31.05.2023 in T.M.C 27.740

SAC Dowleshwaram Barrage: 1st Warning (3.58mt over sill of Barrage) - 10,00,000 Cusecs, 2nd Warning (4.19mt over sill of Barrage)- 13,07,270 Cusecs, FLOOD DUTY
Danger Level (5.41mt over sill of Barrage) -17,00,000 Cusecs.
Note:

OFFICER
Prakasam Barrage: Warning Level (+57.00 Feet) -3.97 Lakshs Cusecs, Danger Level: (+60.00 Feet) - 5.66 Lakhs Cusecs
Gotta Barrage: Ist Warning: 40,000 Cusecs, IInd Warning: 80,000 Cusecs, Danger Level: 1,04,000 Cusecs ,

You might also like