Professional Documents
Culture Documents
18'X65' Three Storey Residential RC Building Structural Drawing
18'X65' Three Storey Residential RC Building Structural Drawing
DRAWING CONTENT
4. Code
ACI 318-08
General Requirement for Reinforced Concrete ld f ya
= for 22mm and larger bars
db 20 fc'
(1) Material Strength
f'c,cube ≈ fc ' ÷ 0.78 (fc ' ≤ 3,500 psi) where α = 1.3 for top bars (i.e 12" or more of concrete is cast in a single concreting below the development
f'c,cube ≈ fc ' ÷ 0.80 (3,500 <fc' ≤ 5,000 psi) length or splice length)
f'c,cube ≈ fc ' ÷ 0.81 (5,000 < fc' ≤ 6,000 psi) = 1 (for other bars)
f'c,cube ≈ fc ' ÷ 0.83 (fc ' > 6,000 psi)
Modification factor = As(required)/As(provided) and ld ≥ 12" (for all cases)
where f'c,cube = cube compressive strength of concrete
fc ' = cylindrical compressive strength of concrete (05) Lap Splice in Tension
Class A splice = 1.0 ld
(2) Concrete Clear Cover Class B splice = 1.3 ld
where ld = simplified tension development length
Exposed directly to weather or in
Not exposed to weather or not in Note: (a) ld does not apply the modification factor As(required)/As(provided)
Particulars contact with
contact with ground
ground (b) Lap splice are generally Class B, except when As(provided) ≥ 2 x As(required) over the length of the
splice, and ≤ 50% of the total reinforcement is spliced within the lap length
Slabs and Walls 3
" 2" but 1 21 " for 16mm and smaller
4 (c) lsplice ≥ 12" (in all cases)
bars
db db
(04) Simplified Tension Development Length
ld f ya
= for 20mm and smaller bars Main Reinforcement
db 25 fc'
6db 12db 6db (or) ≥ 2h lsplice,tension ≥ 2h
135° ≥ 3" for seismic hook
r r r l/3
l
db (16mm or db (16mm to db (25mm or
smaller) 25mm) smaller) Splice Zone for Bottom Bar
(08) Development Length of Standard Bar Hooks (3) Both top and bottom bars are not to be spliced within the joint and a distance of twice the member
h
(09.a) Beam Bar Splice
≥ 2h lsplice,tension ≥ 2h
l/3
l
h
Splice Zone for Slab Bottom Bar
Upper Floor
Upper Floor
lsplice,tension
h2/3
h
h/3 h2
Splice Zone
h2/3
Landing Floor
l/3 l*/3
l/3 l*/3
l l
*If adjacent spans are different in span lengths, use the larger of the two. *If adjacent spans are different in span lengths, use the larger of the two.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
67' CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6" 2'-6"
1'-6" 1'-721"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
ISSUED DATE 02/12/2022
F-1 F-1 F-1 F-3 F-2
HM 2022-26
1 SHEET NO. S- 01
1'-6" 1'-721"
Property Line TITLE FOOTING PLAN
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
F-1 6@5'-0"x7'-0"x12"
F-2 2@5'-0"x7'-0"x12" Footing Plan (-8'-0" from N.G.L) NO. DATE
F-3 2@5'-0"x8'-0"x15"
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
Type Quantity Thickness Dimension Layer *Bottom Cover Side Cover Short Direction Long Direction Assumed Qe
F-1 6 12" 5'-0"x7'-0" Bottom 2" 3" 16mm@6"c/c 16mm@6"c/c 1.50 tsf
F-2 2 12" 5'-0"x7'-0" Bottom 2" 3" 16mm@6"c/c 16mm@6"c/c 1.50 tsf
F-3 2 15" 5'-0"x8'-0" Bottom 2" 3" 16mm@6"c/c 16mm@6"c/c 1.50 tsf
CLIENT PRIVATE
F.L
SCALE AS SHOWN
9" thk: 9" thk: DESIGNED
5' Hardcore 7' Hardcore -
BY
DRAWN BY -
CHECKED
-
BY
REVISION
*If lean concrete is not included, the bottom cover is 3".
**The foundation depth shown in the drawing is only for suggestion. The NO. DATE
actual depth is where the effective bearing capacity of soil is 1.50 tsf.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
**8'
12" Footing 16m@6"c/c 12" Footing
Thickness both way Thickness
6" 4'-6" 2'-6" CLIENT PRIVATE
16m@6"c/c
3" thk: Lean
both way
Concrete RADIANT
CONSTRUCTION
CONSTRUCTION
3" thk: Lean
F.L
Concrete ISSUED DATE 02/12/2022
9" thk: 9" thk: HM 2022-26
5' Hardcore 7' Hardcore
PROJECT THREE STOREY
F-3 Section (Shorter Direction) F-3 Section (Longer Direction) RESIDENTIAL RC
BUILDING
N.G.L
LOCATION MANDALAY
SHEET NO. S- 03
**8'
15" Footing 15" Footing
16m@6"c/c 16m@6"c/c SCALE AS SHOWN
Thickness Thickness
6" both way both way DESIGNED
-
BY
3" thk: Lean 3" thk: Lean
Concrete Concrete DRAWN BY -
CHECKED
F.L -
BY
9" thk: 9" thk: REVISION
5' Hardcore 8' Hardcore
NO. DATE
**The foundation depth shown in the drawing is only for suggestion. The actual depth is where the effective bearing capacity of soil is 1.50 tsf.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
61' CLIENT PRIVATE
17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
ISSUED DATE 02/12/2022
HM 2022-26
A LOCATION MANDALAY
1 SHEET NO. S- 04
A
RETAINING WALL
TITLE
PLAN
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
6" 3"
9"thk:
retaining wall
N.G.L
2'
CLIENT PRIVATE
Lean Concrete
RADIANT
CONSTRUCTION
CONSTRUCTION
LOCATION MANDALAY
SHEET NO. S- 05
RETAINING WALL
TITLE
SECTION
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
61' CLIENT PRIVATE
17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
C-1 C-1 C-1 C-1 C-1 CONSTRUCTION
2
2'-5" ISSUED DATE 02/12/2022
C-3 C-3 HM 2022-26
LOCATION MANDALAY
C-1 C-2 C-2 C-1 C-1
1 SHEET NO. S- 06
COLUMN LAYOUT
TITLE PLAN
(OVERALL)
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
A B C D E
61' CLIENT PRIVATE
17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
C-1 C-1 C-1 C-1 C-1 CONSTRUCTION
2
ISSUED DATE 02/12/2022
HM 2022-26
LOCATION MANDALAY
C-1 C-2 C-2 C-1 C-1
1 SHEET NO. S- 07
COLUMN LAYOUT
PLAN
TITLE (FOOTING TO ROOF
FLOOR)
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
C-1 8@12"x12" Column Layout Plan (Footing to Roof Floor) NO. DATE
C-2 2@12"x12"
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
61' CLIENT PRIVATE
17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
2'-5" ISSUED DATE 02/12/2022
C-3 C-3 HM 2022-26
LOCATION MANDALAY
C-2 C-2
1 SHEET NO. S- 08
COLUMN LAYOUT
PLAN
TITLE (ROOF FLOOR TO
ROOF)
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
C-2 2@10"x10" Column Layout Plan (Roof Floor to Roof) Rebar configuration NO. DATE
C-3 2@10"x10" for 10"x10" column.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
Column Schedule
Tie Bar
Type Quantity Size Cover Main Bar Storey
Support Mid
C-1 8 12"x12" 1.5" 8-16mm 1.189% 1-8mm@6"c/c 1-8mm@6"c/c Footing to Roof Floor
C-3 2 10"x10" 1.5" 6-16mm 1.284% 1-8mm@5"c/c 1-8mm@5"c/c Roof Floor to Roof
CLIENT PRIVATE
COLUMN SCHEDULE
C-2 TITLE
& DETAIL
Main Bar Tie Bar Main Bar Tie Bar SCALE AS SHOWN
8-16mm 8mm@6"c/c 6-16mm 8mm@5"c/c
DESIGNED
-
Size 10"x10" BY
DRAWN BY -
C-3 CHECKED
-
BY
A B C D E
61' CLIENT PRIVATE
17'-6" 8' 18' 17'-6"
RADIANT
GB-1b GB-1a GB-1b GB-1b CONSTRUCTION
CONSTRUCTION
2
2'
ISSUED DATE 02/12/2022
5'-3"
GB-1a HM 2022-26
THREE STOREY
*GB-1b
*GB-1b
PROJECT
GB-1b
GB-1a
GB-1a
17' 13' RESIDENTIAL RC
BUILDING
LOCATION MANDALAY
2'
1 SHEET NO. S- 10
GB-1b GB-1a GB-1b GB-1b
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
A B C D E
64'-6" CLIENT PRIVATE
Stiffener Column
3'-6" 17'-6" 8' 18' 17'-6"
(See Detail in S-38)
RADIANT
FB-5 FB-4a FB-4a FB-4a FB-4a CONSTRUCTION
CONSTRUCTION
2
FB-3 ISSUED DATE 02/12/2022
5'-3"
FB-3 FB-3 FB-3 FB-3 HM 2022-26
FB-6b
FB-6b
FB-6b
FB-6a
FB-5
17' RESIDENTIAL RC
BUILDING
FB-2
FB-2
LOCATION MANDALAY
5'-1" 10'-1"
1 SHEET NO. S- 11
FB-5 FB-4b FB-4a FB-4b FB-4b
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
FB-1 6"x12" -
BY
FB-2 10"x10"
FB-3 10"x12" REVISION
FB-4 10"x14"
FB-5 12"x12" First Floor Beam Plan (+12'-0" from GF) NO. DATE
FB-6 12"x14"
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
Stiffener Column
3'-6" 17'-6" 8' 18' 17'-6"
(See Detail in S-38)
RADIANT
FB-5 FB-4a FB-4a FB-4a FB-4a CONSTRUCTION
CONSTRUCTION
2
FB-1
FB-6b
FB-6b
FB-6b
FB-6a
17' RESIDENTIAL RC
FB-5
BUILDING
LOCATION MANDALAY
1 SHEET NO. S- 12
FB-5 FB-4a FB-4a FB-4a FB-4b
SECOND FLOOR
TITLE
BEAM PLAN
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
FB-1 6"x12" -
BY
FB-2 10"x10"
FB-3 10"x12" REVISION
FB-4 10"x14"
FB-5 12"x12" Second Floor Beam Plan (+11'-0" from 1F) NO. DATE
FB-6 12"x14"
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
Stiffener Column
3'-6" 17'-6" 8' 18' 17'-6"
(See Detail in S-38)
RADIANT
RB-5 RB-4 RB-4 RB-4 RB-4 CONSTRUCTION
CONSTRUCTION
2
RB-1
THREE STOREY
**RB-6b
**RB-6b
*RB-6b
PROJECT
RB-6a
RB-6a
17' RESIDENTIAL RC
RB-5
BUILDING
LOCATION MANDALAY
1 SHEET NO. S- 13
RB-5 RB-4 RB-4 RB-4 RB-4
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
RB-1 6"x12" -
BY
RB-2 10"x10"
RB-3 10"x12" REVISION
RB-4 10"x14"
RB-5 12"x12" Roof Floor Beam Plan (+10'-0" from 2F) *Top Bar 4-16mm NO. DATE
RB-6 12"x14" **Stirrup 2-10mm@8"c/c
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
2'-5" RB-3
ISSUED DATE 02/12/2022
HM 2022-26
RB-3
BUILDING
LOCATION MANDALAY
1 SHEET NO. S- 14
RB-3
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
RB-1 6"x12" -
BY
RB-2 10"x10"
RB-3 10"x12" REVISION
RB-4 10"x14"
RB-5 12"x12" Roof Beam Plan (+10'-0" from RF) NO. DATE
RB-6 12"x14"
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
Beam Schedule
FB-6a 12"x14" 1.5" 4-16mm 4-16mm 4-16mm 4-16mm - 8mm@4"c/c 8mm@6"c/c PROJECT THREE STOREY
RESIDENTIAL RC
FB-6b 12"x14" 1.5" 6-16mm 4-16mm 6-16mm 6-16mm - 8mm@4"c/c 8mm@6"c/c BUILDING
RF & R RB-4 10"x14" 1.5" 3-16mm 2-16mm 2-16mm 2-16mm - 8mm@6"c/c 8mm@6"c/c
TITLE BEAM SCHEDULE
RB-5 12"x12" 1.5" 3-16mm 3-16mm 3-16mm 3-16mm - 8mm@6"c/c 8mm@6"c/c
RB-6a 12"x14" 1.5" 3-16mm 3-16mm 4-16mm 4-16mm - 8mm@4"c/c 8mm@6"c/c SCALE AS SHOWN
DESIGNED
RB-6b 12"x14" 1.5" 6-16mm 4-16mm 6-16mm 6-16mm - 8mm@4"c/c 8mm@6"c/c -
BY
LB-1a 10"x12" 1.5" 2-16mm 2-16mm 2-16mm 2-16mm - 8mm@6"c/c 8mm@6"c/c DRAWN BY -
Landing
LB-1b 10"x12" 1.5" 5-16mm 5-16mm 3-16mm 3-16mm - 8mm@4"c/c 8mm@4"c/c CHECKED
-
BY
REVISION
The maximum beam main bar clear spacing between top layer and bottom layer is 1.5". NO. DATE
*The spacing of stirrup is 4"c/c and stirrup hook is placed downward for cantilever beams.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
SIZE 12"x14"
TOP BAR 6-16mm
SUPPORT BOT BAR: 6-16mm
STIRRUP 8mm@4"c/c
SIZE 12"x14"
TOP BAR 4-16mm
MID BOT BAR: 6-16mm
STIRRUP 8mm@6"c/c CLIENT PRIVATE
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
NO. DATE
The maximum beam main bar clear spacing between top layer and bottom layer is 1.5". The spacing of stirrup is 4"c/c and stirrup hook is placed downward for cantilever beams.
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
ISSUED DATE 02/12/2022
5'-3"
9" HM 2022-26
1 SHEET NO. S- 19
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
4" Slab Thickness First Floor Slab Plan (+12'-0" from GF) NO. DATE
6" Slab Thickness
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6"
6" RADIANT
CONSTRUCTION
CONSTRUCTION
2
3' ISSUED DATE 02/12/2022
5'-3"
1'-6" HM 2022-26
1 SHEET NO. S- 20
SECOND FLOOR
TITLE
SLAB PLAN
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
4" Slab Thickness Second Floor Slab Plan (+11'-0" from 1F) NO. DATE
6" Slab Thickness
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6"
6" RADIANT
CONSTRUCTION
CONSTRUCTION
2
3' ISSUED DATE 02/12/2022
5'-3"
1'-6" HM 2022-26
1 SHEET NO. S- 21
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
4" Slab Thickness Roof Floor Slab Plan (+10'-0" from 2F) NO. DATE
6" Slab Thickness
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
E
N S
W
A B C D E
64'-6" CLIENT PRIVATE
3'-6" 17'-6" 8' 18' 17'-6"
RADIANT
CONSTRUCTION
CONSTRUCTION
2
2'-5" ISSUED DATE 02/12/2022
HM 2022-26
LOCATION MANDALAY
1 SHEET NO. S- 22
SCALE AS SHOWN
DESIGNED
-
BY
DRAWN BY -
CHECKED
-
BY
REVISION
4" Slab Thickness
Water Tank Location on 4" Thk: Slab Roof Slab Plan (+10'-0" from RF) NO. DATE
(Max: Allowable Water Volume = 1,200 gal)
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
Slab Schedule
Top
All Storey 6" 0.75" Same as Waist Slab Reinforcement - CLIENT PRIVATE
Bottom
RADIANT
Y CONSTRUCTION
CONSTRUCTION
X X
LOCATION MANDALAY
SHEET NO. S- 23
SCALE AS SHOWN
Bottom Steel Plan Top Steel Plan DESIGNED
-
Y BY
DRAWN BY -
lu/3 **lu/3 lu/3 **lu/3
CHECKED
-
BY
lu lu REVISION
Section X-X *Top bars in both directions are
SLAB DETAIL Section Y-Y NO. DATE
not cut under water tank.
**Length of the largest clear span
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
A B C D E
64'-6"
3'-6" 17'-6" 8' 18' 17'-6"
R
+45'-0"
10'
RF CLIENT PRIVATE
+35'-0"
5' RADIANT
CONSTRUCTION
CONSTRUCTION
10'
5' ISSUED DATE 02/12/2022
2F HM 2022-26
+25'-0"
45' 5'-6" PROJECT THREE STOREY
RESIDENTIAL RC
11' BUILDING
5'-6"
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 24
6'
12'
GF TITLE ELEVATION-1
6' +2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-1 NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
A B C D E
64'-6"
3'-6" 17'-6" 8' 18' 17'-6"
R
+45'-0"
10'
RF CLIENT PRIVATE
+35'-0"
RADIANT
CONSTRUCTION
CONSTRUCTION
10'
ISSUED DATE 02/12/2022
2F HM 2022-26
+25'-0"
45' PROJECT THREE STOREY
RESIDENTIAL RC
11' BUILDING
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 25
12'
GF TITLE ELEVATION-2
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-2 NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
R
+45'-0"
10'
RF CLIENT PRIVATE
+35'-0"
RADIANT
CONSTRUCTION
CONSTRUCTION
10'
ISSUED DATE 02/12/2022
2F HM 2022-26
+25'-0"
45' PROJECT THREE STOREY
RESIDENTIAL RC
11' BUILDING
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 26
12'
GF TITLE ELEVATION-A
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-A NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
R
+45'-0"
10'
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 27
12'
GF TITLE ELEVATION-B
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-B NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
R
+45'-0"
10'
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 28
12'
GF TITLE ELEVATION-C
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-C NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
R
+45'-0"
10'
RF CLIENT PRIVATE
+35'-0"
RADIANT
CONSTRUCTION
CONSTRUCTION
10'
ISSUED DATE 02/12/2022
2F HM 2022-26
+25'-0"
45' PROJECT THREE STOREY
RESIDENTIAL RC
11' BUILDING
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 29
12'
GF TITLE ELEVATION-D
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-D NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
R
+45'-0"
10'
RF CLIENT PRIVATE
+35'-0"
RADIANT
CONSTRUCTION
CONSTRUCTION
10'
ISSUED DATE 02/12/2022
2F HM 2022-26
+25'-0"
45' PROJECT THREE STOREY
RESIDENTIAL RC
11' BUILDING
1F LOCATION MANDALAY
+14'-0"
SHEET NO. S- 30
12'
GF TITLE ELEVATION-E
+2'-0"
SCALE AS SHOWN
2' N.G.L
DESIGNED
+0'-0" -
BY
8' DRAWN BY -
F.L
CHECKED
-
-8'-0" BY
REVISION
Elevation-E NO. DATE
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
1 2
17'
RF
+35' - 0"
5'
3'-7"
10'
6" 2'-8"
5' CLIENT PRIVATE
CHECKED
-
GF BY
+2' - 0" REVISION
NO. DATE
Stair Elevation
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
B C
8'
CLIENT PRIVATE
RADIANT
CONSTRUCTION
CONSTRUCTION
11'-4"
11'-10" LOCATION MANDALAY
SHEET NO. S- 32
STAIR PLAN
TITLE
(GF TO 1F)
B C
8'
CLIENT PRIVATE
RADIANT
CONSTRUCTION
CONSTRUCTION
LOCATION MANDALAY
10'-7"
11'-1"
SHEET NO. S- 33
STAIR PLAN
TITLE
(1F TO 2F)
B C
8'
CLIENT PRIVATE
RADIANT
CONSTRUCTION
CONSTRUCTION
LOCATION MANDALAY
9'-10"
10'-4" SHEET NO. S- 34
STAIR PLAN
TITLE
(2F TO RF)
11'-9"
24
1F
23
+14'-0"
22
21
20
19
18
6' 17 Distribution Bar
16 10mm@8"c/c
CLIENT PRIVATE
15
14 RADIANT
13 CONSTRUCTION
CONSTRUCTION
3'-7" Main Bar
GF Landing ISSUED DATE 02/12/2022
10mm@6"c/c
+8'-0" HM 2022-26
Rise = 6"
Run = 9" PROJECT THREE STOREY
Waist Slab Thickness = 5" RESIDENTIAL RC
Landing Slab Thickness = 4" BUILDING
12 LOCATION MANDALAY
GF Landing
11
+8'-0"
10 SHEET NO. S- 35
9
3'-2" 5" 8 STAIR DETAIL
TITLE
6" 7 (GF TO 1F)
6
6' Distribution Bar 5 SCALE AS SHOWN
10mm@8"c/c 4 DESIGNED
-
3 BY
2 DRAWN BY -
1
Main Bar CHECKED
GF -
10mm@6"c/c BY
+2'-0" REVISION
NO. DATE
Stair Detail (GF to 1F)
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
11'-9"
9" 22
2F
21
+25'-0"
20
19
18
17
16 Distribution Bar
5'-6"
15 10mm@8"c/c CLIENT PRIVATE
14
13 RADIANT
12 CONSTRUCTION
CONSTRUCTION
3'-7"
Main Bar 1F Landing ISSUED DATE 02/12/2022
10mm@6"c/c
+19'-6" HM 2022-26
Rise = 6"
Run = 9" PROJECT THREE STOREY
11'-9" Waist Slab Thickness = 5" RESIDENTIAL RC
Landing Slab Thickness = 4" BUILDING
11 LOCATION MANDALAY
1F Landing
10
+19'-6"
9 SHEET NO. S- 36
8
3'-2" 5" 7 STAIR DETAIL
TITLE
6" 6 (1F TO 2F)
5
5'-6"
Distribution Bar 4 SCALE AS SHOWN
10mm@8"c/c 3 DESIGNED
-
2 BY
1 DRAWN BY -
Main Bar 1F
10mm@6"c/c CHECKED
-
+14'-0" BY
9" REVISION
NO. DATE
Stair Detail (1F to 2F)
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
11'-9"
1'-6" 20
RF
19
+35'-0"
18
17
16
15
5' 14 Distribution Bar
13 10mm@8"c/c
CLIENT PRIVATE
12
11 RADIANT
3'-7" CONSTRUCTION
2F Landing CONSTRUCTION
Main Bar
10mm@6"c/c +30'-0" ISSUED DATE 02/12/2022
HM 2022-26
Rise = 6"
Run = 9" PROJECT THREE STOREY
11'-9" Waist Slab Thickness = 5" RESIDENTIAL RC
Landing Slab Thickness = 4" BUILDING
LOCATION MANDALAY
10
2F Landing
9 SHEET NO. S- 37
+30'-0"
8
7 STAIR DETAIL
TITLE
3'-2" 5" 6 (2F TO RF)
6" 5
5' 4 SCALE AS SHOWN
Distribution Bar 3 DESIGNED
10mm@8"c/c -
2 BY
1 DRAWN BY -
Main Bar 2F
CHECKED
10mm@6"c/c -
+25'-0" BY
1'-6" REVISION
NO. DATE
Stair Detail (2F to RF)
fc ' = 2,500 psi fy(main bar) = 58,000 psi fy(confinement bar) = 40,000 psi
CLIENT PRIVATE
SHEET NO. S- 38
6"
6.5mm@6"c/c DRAWN BY -
12"x12" Floor Beam Tie Bar
CHECKED
Stiffener Column Elevation Stiffener Column Section -
BY
REVISION
NO. DATE