FEEDER MV-1Q1
+A04
INCOMER
MV1 -1Q1 +A01
LOAD
BANK
440v 4MW
LOAD BANK
TEMP 20KV /440
XFMR
LOAD
BANK
440 4MW
DB 21/03/24 PRIMARY
SIGN Walk of system and all associated appartus to take place prior to commencment of switching to verify as follows
TIME +A12:C53A12:C63C12A12:C61A12:C62A12:C61A12:C59A12:C58A12:C57A12:C55A12:C53A12:C51A12:C50A12:C49A12:C48A12:CA12:C47
Confirm that approved request for energisation is in place
Confirm that approved request for isolation is in place
Confirm that energisation time and date has been agreed and that all necessary parties are aware
Confirm that isolation time and date has been agreed and that all necessary parties are aware
Confirm that a declaration of fitness has been received
Confirm that QAQC documents are approved and signed off
Confirm that equipment has completed L2 Cx.
Confirm that torqueing records are to hand
Confirm that pre-energisation test results are to hand
Confirm that VLF/ Hi-Pot test record sheets are to hand
Equipment owner to confirm that the approved protection settings have been applied to preotection relays
Expected configuration of equipment:
Confirm equipment/ system being energised is clear of personnel and safe to energise
Confirm fire extinguisher is to hand
Confirm equipment/ system being isolated is clear of personnel and safe to energise
Confirm that all warning and safety signage has been posted
Confirm that relevant test equipment is to hand
Confirm all necessary safety PPE is to hand
Confirm that all outgoing circuits have LOTO applied to prevent uncontrolled energisations
Confirm that communication equipment is at hand
Confirm that all necessary parties are available to witness energisation
Confirm that all necessary parties are available to witness isolation
Confirm that this switching plan is approved for use
Confirm system boundaries are attached
Equipment owner to confirm that tap changer settings are correct
Confirm equipment is in good condition and safe to energise
Confirm area being energised has been walked and is ready to energise
Confirm area being energised is secure
Confirm permit system is implemented for energised area and equipment
Confirm that there are no unexpected alarms on systems being worked on
Confirm remote switching is available
Confirm support generator available as required
Confirm cable routes are completed with signage posted
Confirm cabling has sufficient mechanical protection when passing through areas under construction
DB 21/03/24 PRIMARY
Table 1 ARC Flash requirements
Scenario 20kv Utility feed only
Max Cal/Cm^2 52.89
PPE cat 5
2) LEVEL 0 CONFIRM VCB MV-1Q1 +A05 FEEDER TO RMU 2.1C CB1 IS RACKED
MV1 MV-1Q1 +A05 OUT IN TEST POSITION AND CIRCUIT EARTH SWITCH IS APPLIED
SWITCH FEEDER TO RMU WITH LOCK NO….3….
2.1C-CB1
ROOM CONFIRM MECH FLAG IS VISIBLE AT VCB WINDOW. AND
M.00.85 CASTELL KEY 1Q1FB3 IS FIRMLY IN POSITION ON VCB ON
FLORES HMI CONFIRM INPUT 304 IS INDICATING EARTH SWITCH
CLOSED.
LEVEL 0 MV-1Q1 +A04
3) MV1 FEEDER TO RMU CONFIRM VCB MV-1Q1 +A04 FEEDER TO RMU 1.2B CB1 IS RACKED
SWITCH 1.2B-CB1 OUT IN TEST POSITION AND CIRCUIT EARTH SWITCH IS APPLIED
ROOM WITH LOCK NO….2….
M.00.85 CONFIRM MECH FLAG IS VISIBLE AT VCB WINDOW. AND
CASTELL KEY 1Q1FB2 IS FIRMLY IN POSITION ON VCB.ON
FLORES HMI CONFIRM HMI INPUT 304 IS INDICATING EARTH
SWITCH CLOSED.
NOTE THIS IS TEMPORARY FEEDER TO 20KV LOAD
BANK STRING
DB 21/03/24 PRIMARY
4)
CONFIRM VCB MV-1Q1 +A03 FEEDER TO RMU 2.2B CB1 IS RACKED
LEVEL 0 OUT IN TEST POSITION AND CIRCUIT EARTH SWITCH IS
MV1 MV-1Q1 +A03 APPLIEDWITH LOCK NO….1….
SWITCH FEEDER TO RMU
CONFIRM MECH FLAG IS VISIBLE AT VCB WINDOW.AND CASTELL
2.2B-CB1
ROOM KEY 1Q1FB1 IS FIRMLY IN POSITION ON VCB. ON FLORES HMI
M.00.85 CONFIRM HMI INPUT 304 IS INDICATING EARTH SWITCH CLOSED.
7)
LEVEL 0 CONFIRM VCB MV-1Q1 +A01 INCOMER SUPPLY IS RACKED OUT IN
MV1 MV-1Q1 +A01 TEST POSITION. AND CIRCUIT EARTH SWITCH IS APPLIED WITH
SWITCH INCOMER A LOCK NO….15….
ROOM CONFIRM MECH FLAG IS VISIBLE AT VCB WINDOW.
M.00.85 AND CASTELL KEY 1Q1ES0 IS FIRMLY IN POSITION ON VCB.
ON FLORES HMI CONFIRM HMI INPUT 304 IS SEEING EARTH
SWITCH CLOSED. BOTH MV1 AND UTIITLITIES SUB STATION B
SHOULD BE VERIFIED INDICATION CLOSED PRESENT AT BOTH
LOCATIONS.
8)
LEVEL 0 MV-1Q1 +A01 CONFIRM CONTROL VT. S ARE RACKED OUT AND IN TEST
MV1 INCOMER A POSITION.
SWITCH PROCEED TO RACK CONTROL VT. S INTO SERVICE POSITION ON
PRIMARY SIDE VCB INCOMER ANCILLIARY SERVICE SPOUTS
ROOM
M.00.85
MERC SIGN………………………………………………
SYNA SIGN……………………………………………….
DB 21/03/24 PRIMARY
10) LEVEL 0 CONFIRM IN COLLABORATION WITH SYNA.
MV1 MV-1Q1 +A01 ALARMS OR LOCKOUT ARE NOT PRESENT ON INCOMER
SWITCH INCOMER A CUBICLES IN MV 1 A01 AND FEEDER CUBICLE SUBSTATION B
J2Q13 RING MAIN FEEDER.
ROOM
M.00.85
MERC SIGN………………………………………………
SYNA SIGN……………………………………………….
LEVEL 0
11) MV1 LEVEL 0 PROCEED TO CLEAR MV1 SWITCHROOM AND LOCK ALL DOORS.
SWITCH MV1 SWITCHROOM SAFETY BARRIERS ARE TO BE ADORNED BOTH ENTRANCES.
M.00.85 AND PERSONNEL TO BE PRESENT TO PREVENT UNAUTHORISED
ROOM ENTRY.
M.00.85
Metering
DEVICE L1 L2 L3
HMI
PQM
VDI
15) LEVEL 0 MV-1Q1 +A01 AT INCOMER MV-1Q1 +A01 PROCEED TO RACK INCOMER VCB TO
MV1 INCOMER A SERVICE POSITION
SWITCH ON CIRCUIT AND BUS BAR
CONFIRM ON SEL 751 REMOTE OPERATION IS INDICATED AS
ROOM AVALIBLE AND ILUMINATED.
M.00.85 CONFIRM NO ALARMS OR LOCKOUTS ARE PRESENT.
MV-1Q1 +A01
16) LEVEL 0 INCOMER A SAP AND BUDDY TO CLEAR THE ROOM
MV1 CONFIRM DOORS RELOCKED AND BARRIERS AND NO ENTRY
SWITCH PERSONNEL ARE PRESENT.
ROOM
M.00.85
DB 21/03/24 PRIMARY
LOCATED AT MV1 CONTROL ROOM AT FLORES PANEL.
17) LEVEL 0 MV-1Q1 +A01 IN COLABRATION WITH ALL PERSONELL.
MV1 INCOMER A CONFIRM NO ALARMS OR LOCKOUTS ON FLORES PANEL ARE
SWITCH PRESENT.
PROCEED TO INITIATE CLOSURE ON HMI OF VCB INCOMER
ROOM MV-1Q1 +A01.
M.00.85 THE VCB SHOULD NOW BE CONFIRMED AS CLOSED ON HMI AND
BUS BAR LIVE.
CROSS CHECK SEL 751 FOR ALARMS OR UNEXPECTED
INDICATIONS.
CONFIRM AT VCB CONTROL SECTION CLOSED ILUMINATION.
AND MECH FLAG CLOSED INDICATOR ARE VISIBLE.
AT CUBICLE MV-1Q1+A04 CONFIRM VCB REMAINS IN TEST
18) LEVEL 0 MV-1Q1 +A04 POSITION.
MV1 FEEDER CONFIRM EARTH SWITCH STILL APPLIED WITH LOCK NO…2…
SWITCH (TEMPORARILY
UTILISED FOR PROCEED TO WITH STT AND DEISOLATE LOCK….2……
ROOM LOAD BANK DISENGAGE FEEDER CIRCUIT EARTH SWITCH TO THE OPEN
M.00.85 STRING) POSITION.
CONFIRM MECH FLAG INDICATES OPEN.
AT FLORES HMI INPUT 304 IS INDICATING CORRECT AS EARTH
SWITCH OPEN.
19)
LEVEL 0 MV-1Q1 +A04
MV1 FEEDER SAP AND BUDDY PERSONEL TO PROCEED TO ADORN FULL CAT
SWITCH (TEMPORARILY RATED ARC FLASH SUIT AND ENTER MV1 SWITCHROOM
UTILISED FOR
ROOM LOAD BANK
M.00.85 STRING)
20)
MV-1Q1 +A04 AT MV-1Q1+A04 SAP AND BUDDY PERSONNEL PROCEED TO RACK
LEVEL 0 FEEDER VCB A04 TO SERVICE POSITION.
MV1 (TEMPORARILY CONFIRM ON VCB CONTROL SEL 751 IS INDICATION VCB IN
SWITCH UTILISED FOR SERVICE.
LOAD BANK CONFIRM ON SEL 751 REMOTE CONTROL IS INDICATED.
ROOM STRING) AT FLORES HMI CONFIRM SERVICE POSITION IS INDICATED AND
M.00.85 VISIBLE.
DB 21/03/24 PRIMARY
M.00.85 NOW LIVE.
DB 21/03/24 PRIMARY
DB 21/03/24 PRIMARY
DB 21/03/24 PRIMARY
DB 21/03/24 PRIMARY
DB 21/03/24 PRIMARY
Person in charge - Procedure / work-scope COMPLETED:
Name………………………………………………………….
Name………………………………………………………….
Signature …………………………………………………… Date …………………………………
…………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………...
DB 21/03/24 PRIMARY