Toilet Layout

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

R0 DESIGN DEVELOPMENT

2' X 1' WALL TILES 2' X 1' WALL TILES


AS SPECIFIED. AS SPECIFIED.

WASH BASIN
URINAL AS SPECIFIED
WASH BASIN
WALL HUNG WC WALL HUNG WC
6" SUNK SLAB. NO. DESCRIPTION DATE DRAWN BY

6" SUNK SLAB. REVISIONS

SECTION AA' SECTION BB'

2' X 1' WALL TILES 2' X 1' WALL TILES


AS SPECIFIED. AS SPECIFIED.
NO. OF PRINTS

WALL HUNG WC DISTRIBUTION OF PRINTS


WALL HUNG WC
General Notes
WASH BASIN WASH BASIN These drawings and accompanying specifications
as instruments of service are the exclusive property
of
M/S. DESIGN IDEAS and their use and publications
shall be restricted to the original site for which they
6" SUNK SLAB. were prepared.
6" SUNK SLAB. Reuse, reproduction or publication by any method
in whole or part is prohibited except by written
permission from the Architect.
Title to these plans and specifications shall remain
with the Architect without prejudice and visual
SECTION CC' SECTION DD' contact with them shall constitute prima facie
D' evidence of acceptance of these restrictions.
Contractor must verify dimensions on the job and
canteen store canteen store
report discrepancies, if any, to this office.
Drawings are NOT to be SCALED, written dimensions
grocery store
grocery store staff kitchen
executive 9650.0000 [2451]
kitchen 3 Burner
Range
Table
Range SKF-3
2 Burner Table

are to be followed.
SKF-8
SKF-3
5549.0570 [1409] Chapati
Dosa Plate
Table
collection SKF-3 SKF-7
Trolley SKF-6
Maker
Chapati SKF-5
Deep Fryer Table SKF-4 Dhokla
SKF-2 SKF-3 SKF-2A SKF-11A Maker

EXECUTIVE

EKV-2
Table
EKV-3
Shelves
4834.9694 [1228]

EKV-4
SKF-11

Puffer Pulveriser
Range Idli
2 Burner

EKV-9
SKF-10 SKF-11B Maker

Sink Work
Range
3 Burner Shelves

Big
Table

EKV-2A
NV-4
SKF-1
Sink Work SKF-11

TERRACE SKF-9A
Sink Work
Table
Work Top

Table
SKF-9 Table

EKV-10
Chapati
Ind Sink Work
EKV-8 Ind
Plate

EKV-11A
Plate
Shelves Work Top
Table
Sink Work
SKF-14
Table

Sink Work
Sink Work

LADIES

EKV-3
SKF-15
VEG Wet

NV-4
VEG HEN Dough Grinder

E KITCHEN STAFF KITC


Kneader

Deep Fryer
Table

EKV-11
EXECUTIV

SKF-16
Potato
Peeler
Table 10864.3541 [2760]

24-05-2024

Pulveriser

Elec Panel
NV-2

Date

SKF-12

Small
1651.0319 [419]
Shelves Shelves SKF-18 SKF-17

Pulveriser
EKV-6 EKV-7

SKF-13
300 lts Fridge Deep Freezer 300 lts Fridge Deep Freezer
1492.2197 [379] 1500.0000 [381] 702.4381 [178]

Big
WASH ROOM
STAFF KITCHEN NON VEG
NV-3A
2100.0000 [533] EKV-5 EKV-5A EKV-5B
Sink Work Table
NV-3 NV-2 NV-1 Work Top 3 Sink Unit for Drinking water Work Top
MORI Table Tandoor NV-7
Veg Deep Freezer
Platform Deep Freezer Platform Work Table Ind
Trolley Trolley Cutting
1500.0003 [381] 3 Burner Range Plate

CANTEEN
Sandwich Table SERVING AREA
Shelves Shelves
Tiffin packing

1:50
Shelves Shelves Shelves
Dish wash Dish Rack

Scale
NV-6
area

Pot Wash
AC outdoor unit
MORI
PLATE COLLECT FAST FOOD
Bain Marie 4 Bain Marie 3 Bain Marie 2 Bain Marie 1

STAFF
Garbage Grinder Soiled Plates Fresh Plates Non Veg Pizza Veg Pizza
2060.0000 [523]
1500.2000 [381]

AC outdoor unit
22078.7692 [5608] 500.0000 [127]

Gauresh
SERVING PLATFORM
Drawn
C' WASHROOM C 22078.7692 [5608]

20228.0589 [5138]
2825.4133 [718]
CARD
READER

CARD
3319.8283 [843]

1718.1559 [436]
READER
900.0000 [229]

750.0000 [191]

MUSIC
SYSTEM
3547.6250 [901]
Checked Paresh
G.TOILET

STAIRCASE
FIRE EXIT
900.0000 [229]
7074.7962 [1797]
FIRE EXIT 1522.3860 [387]

STAIRCASE 4250sqft area


9638.9149 [2448]
2738.8069 [696]
L.TOILET 3412.1712 [867]
Approved Paresh
192 seating

UP
3480.0000 [884]

DN
900.0000 [229]
1348.9422 [343]

4350.0000 [1105]

passage Elec 2300.1627 [584] SHEET SIZE A2- 594 mm x 420mm


D 21067.1048 [5351]
Load

ELECTRIC LAYOUT FLOORING LAYOUT


STAFF CANTEEN

Tiffin
wash
distribution

G.Hand
wash
1650.0000 [419]
File Name
3530.0000 [897]
1500.0000 [381] Tiffin
wash
L.Hand 1650.0000 [419]
CLIENT
B'

1107.6140 [281]
wash

2478.6465 [630]
30954.8900 [7863] 8602.7766 [2185]

UNION BANK
DRINKING
WATER
21608.8823 [5489]

4051.8953 [1029]

2707.7766 [688]

3978.6465 [1011]
SLIDING PARTITION

SERVING PLATFORM Open kitchen SERVING PLATFORM

EXECUTIVE PROJECT

INTERIOR RENOVATION OF

TERRACE
HAND
GENTS TERRACE
23502.5288 [5970]

13447.7852 [3416]

WASH ROOM UNION BANK BHAVAN, NARIMAN


WASH
16172.7852 [4108]
EXECUTIVES DINING AREA CUM HALL FOR MEETING/FUNCTION

POINT, MUMBAI.
DB LIFT LIFT

A' A 1375.0000 [349]


LIFT
LIFT
LOBBY
ENT

3129.5050 [795]

13985.0000 [3552]
1375.0000 [349]
LIFT

1225.0000 [311]
DRINKING
WATER DESIGN IDEAS
2,SREE RANG BLDG,,
2650 sqft area executive
Gents
executive
DR.AMBEDKAR ROAD, OPP BANK OF BARODA,
Ladies
126 seating Hand
Wash Room Wash Room
wash Canteen
staff Canteen
CENTRAL MATUNGA MUMBAI-19
washroom staff
LOCKER TELE : 24118778,24131712

SE
2nd Floor Canteen

EAST

SOUTH
Sheet Title Project No.
29.05.2024 NORTH
SECOND FLOOR PLANS

NE

SW
NORTH

WEST
FOR EXECUTION

NW
Total Floor
B

ELECTRIC LAYOUT 10000 sqft area


KEY PLAN TOILET DETAILS
Dwg. No.

FLOORING LAYOUT 1
(1:250) Rev. No.
R-0

You might also like