Reference to the discussion on the subject mentioned above, we hereby submit our lowest cost for the
construction of house inclusive all of men and materials.
FRAMED STRUCTURE type construction Rate = Rs. 1800/- per square feet
Any clarifications in this regard please feel free to contact us @ 8667395332 or email the queries to
hariprasath.civil@gmail.com.
Hope our prices are very competitive and looking forward to receive your valuable work order.
Thanking you,
Yours faithfully,
AGAM CONSTRUCTIONS
V.HARIPRASATH.DCE
ENGG
Specification of materials
column 1’X8” size column with 6 no’s 12 mm main rods with 8 mm stirrups 10-
inch c/c
Plinth beam 15”x9” size beam with 3 no 12 mm top hanger bars with 3 no 16 mm
bottom main rod with 8 mm stirrups with 10-inch c/c
Basement total height is 3 feet above road level. With using fly ash
Basement bricks. Basement fille with gravel and consolidate using bore well water.
PCC 4 inch thick will be done over basement level.
Toilet Door PVC doors (Rs.3500 max including fitting and fixing)
Plastering Work only for door and window borders & for Concrete surfaces – CM 1:5
and also for brick work walls – CM 1:5
Electrical Materials GM or GOLDMEDAL basic Modular Boxes and switches, Branded ISI
conduit & KUNTHAN branded cables
Over Head Tank 1000 Liters capacity PVC WATER TANK (no brick tank) 3 layer 5000 rs
Toilet Flooring Antiskid Ceramic tiles (1'x1') @ Rs.40 per square feet
Kitchen Toilet Wall tiles Ceramic tiles for 7 feet height @ Rs.40 per square feet
Parapet walls 4” Half brick wall with using fly ash bricks up to 3’6” height.
All acrylic oil and water base paints will be use in Asian branded
6 mm metal concrete for open terrace area with slope finish for water
Weathering coarse
drainage.
Upvc with basic model 12 mm grill with outer frames and plain shutters
with basic design glass.
windows
Upvc rate - 450 per sqft
kitchen Kitchen granite slab 150 rs per sqft with ss basic model sink 2’ x 1.5’
Place for Material storage and labor shed to be given at free of cost near to the site.
Construction power & water supply to be provided by owner’s cost. We are not responsible for
bore motor and coil if any problems in motor.
While execution if Any Modifications in the plan or works are required by the client it will be
cost extra
Any sort of amount given for obtaining permanent/temporary EB service to be paid by the
owner.
Any changes from the above specifications or in drawings will be charged extra.
If any material price unexpectedly increased above 10% the amount will be charged extra
Sump and septic tank not included in the contract amount. (20 Rs per liters for sump
construction)
Plumbing and wiring fittings are not included. (Fan, light, taps, basins, closet etc). all provisions
will be given as per requirements.
Compound wall and gate not included in the contract amount. (Extra RS 1750 for running feet)
For wall construction only
Compound gate is client scope as per client requirements.
Modular kitchen works, any kind of interior and exterior decoration works are not included 4 feet
wide cudduppa slab selves only for kitchen and bedrooms. Not extra selves work included. safety
grills, thinnai works, any kind of additional interior works not included.
Service line work ,meter box work,ups and cctv line,speaker line works are not included.
Provisions, materials, equipment’s, motors, pipes, fittings, for rainwater harvesting system will be
cost extra.
RATE
= 4200x1800
= 75,60,000
Mr.Hariprasath.DCE
AGAM CONSTRUCTIONS Mr.SOUNDAR