DAIDO KAIUN CO.

,LTD

MV ANSAC GREEN RIVER Date :

HAND OVER REPORT


RANK: THIRD ENGINEER

HAND OVER 3/E TAKE OVER 3/E

THAI GIANG NAM

NOTED BY MASTER
NOTED BY CHIEF ENGINEER

TRAN VAN TUYEN NGUYEN THANH LUAT


DUTY & RESPONSIBILITY
Third engineer is responsible to the chief engineer for the following;
. For keeping an engine room watch at sea and in port if so required.
. For the performance of such duties and maintenance work as may be directed by the
chief engineer or the first engineer.
The third engineer shall perform maintenance work as directed by the first engineer.

I LIST OF MACHINERIES & EQUIPMENT IN CHARGE


1 . BOILER & RELATED PARTS
2 . FRESH WATER GENERATOR
3 . F.W SYSTEM ( HYDROPHORE, PUMPS, PIPES…)
4 . S.W SYSTEM
5 . ACC AIR CONDITIONER
6 . E.C.R AIR COOLER UNIT
7 . GALLEY AIR COOLER UNIT
8 . EMERGENCY FIRE PUMP
9 . LIFE BOAT ENGINE, RESCUE BOAT ENGINE
10 . PROVISION REFRIGERATING SYSTEM
11 . SEWAGE TREATMENT PLANT
12 . ELECTRIC SYSTEM
13 . CALORIFIER UNIT
14 . COOKING APPARATUS
15 . GRAY WATER SYSTEM
16 . PUMPS

II LIST OF DOCUMENTS IN CHARGE


1 . MONTHLY WORKING REPORT 4(F. W. G)
2 . MONTHLY WORKING REPORT 5(BOILER)
3 . MONTHLY CONDITION REPORT 3(F. W. G)
4 . ANALYSIS OF BLR WATER & J.C.F.W
5 . MONTHLY RPT. OF CHEMICAL/ TEST CHEM.
6 . MOTOR BEARING CHECK SHEET
7 . MOTOR MEGGER TEST
8 . OZONE DEPLETING SUBSTANCE RECORD
9 . SEEMP MONTHY MONITORING REPORT
10 . BATTERY CHECK LIST
11 . MGPS DAILY RECORD
12 . PMS WORKING REPORT
13 . C/E LOG BOOK
14 . DAILY REPORT
15 . SPARE PART & STORE INVENTORY
I MACHINERIES & EQUIPMENT IN CHARGE
1 . BOILER & RELATED PARTS
- In good condition
- Maintenance works base on PMS
. Daily soot blow for Boiler
. Every 2 day bottom blow down & surface blow off
. Test Boiler water & ME C.F.W every 4 days
- Remark:
. Attention adjusted fuel oil pressure when performing change over from HFO to LS MGO
2 . FRESH WATER GENERATOR
- In good condition
- Maintenance works base on PMS
- Remark:
. Operate at 60-70% capacity , almost close vacuum adjust valve when sea water
temprature is low
3 . F.W SYSTEM ( HYDROPHORE, PUMPS, PIPES…)
- In good condition
- Maintenance works base on PMS
- Remark:
. Drain FW on deck in cold season
. Added stop valve for Deck wash FW , close after use
4 . S.W SYSTEM
- In good condition
- Maintenance works base on PMS
- Remark:
. Drain SW on deck in cold season
. Zinc plate of Low seachest filter is almost consumed
5 . ACC AIR CONDITIONER
- In good condition
- Maintenance works base on PMS
- Remark:
. 01 Del. Valve of Hot.W.Cir. Pump No2 is not a check valve
6 . E.C.R AIR COOLER UNIT
- In good condition
- Maintenance works base on PMS
7 . GALLEY AIR COOLER UNIT
- In good condition
- Maintenance works base on PMS
8. EMERGENCY FIRE PUMP
- In good condition
- Maintenance works base on PMS
- Remark: Weekly running test
9 . LIFE BOAT ENGINE
- In good condition
- Maintenance works base on PMS
- Remark:
. Weekly running test
. Recharge batteries when voltage under 12.5v (recharge battery one by one at current 7A in 5
- 8 hours)
. Drain water for exhaust pipe after operation
. Drain water for Cooling water pump in cold season
10 . M.G.P.S
- In good condition
- Maintenance works base on PMS
- Remark:
- The M.G.P.S is to be operated according to M/E telegraphe position.
11 . PROVISION REFRIGERATING SYSTEM
- In good condition
- Maintenance works base on PMS
- Remark:
. Adjust Condenser SW outlet valve to maintain Del. Press of Compresor : 1.1~1.7
Mpa
12 . SEWAGE TREATMENT PLANT
- In good condition
- Maintenance works base on PMS
- Remark:
. Add 02 chlorite tablets a week
. Next replace UV lamp : Oct-2023
13 . ELECTRIC SYSTEM
- In good condition
- Maintenance works base on PMS
- After sodium lamp lighting arrangements retrofit, need to update into
Electric drawing documents (1E-3 /D 04-013-00 ,1E-6 /E44-100-1 ,1E-7 /E44-
101-00 ,1E-12 /E40-200-00 ,1E-13 /E40-210-00 ,1E-14 /E40-215-00 ,1E-15
/E40-216-00 ).

14 . CALORIFIER UNIT
- In good condition
- Maintenance works base on PMS
15 . COOKING APPARATUS
- In good condition
- Maintenance works base on PMS
16 . GRAY WATER SYSTEM
- In good condition
- Maintenance works base on PMS
17 . MOTORS
- In good condition
- Maintenance works base on PMS
- Monthly grease up :
. AP2: Motor of Steering gear, Incinerator, Sewage Air blower, ME, FO 2nd filter, ME
LO pumps, Crane motor
. WB3: ECR Air conditioners, Galley Air conditioners, Acc Air conditioners (1
week)
. Biotac: Rudder carrier
- Remark:
.Megger test shall be conducted at every 6 month
. Everyday turn stand by pumps
18 . SPARE PART
- Record spare part consumption in inventory after used
- Order spare follow inventory
- All items will be hand over directly.
19 . REMARK: The following CMS items to be carried-out accordingly in 2023
and to be credited during vessel’s annual survey( choose 1 to overhaul in 2023 or docking).
19 . DAILY REPORT
Time of report:

All lines clear -> Run up -> Noon -> … -> Noon -> Stand by Arrival -> Drop anchor -> Heave up
anchor -> 1st line on shore -> Morning report (0800) -> Noon -> All lines clear.

Bon voyage !