I.5.45 Rev A - SOP 78
I.5.45 Rev A - SOP 78
I.5.45 Rev A - SOP 78
78 Series
Standard Operating
Procedure
Reference: I.5.45
REVISIONS
Rev. Date Subject Sheet
A 23/03/18 Original edition -
B
C
D
E
F
G
H
I
K
L
M
N
O
P
Q
This document is the property of WEIR. It must not be used, reproduced, transmitted or disclosed without the prior written permission of WEIR.
Document ref: I.5.45
Standard Operating Procedure
78 Series Page: 4 / 10 Revision: A
SUMMARY
1 PURPOSE .....................................................................................................................................5
2 SCOPE..........................................................................................................................................5
6 TRACEABILITY ............................................................................................................................5
10 SEALING ....................................................................................................................................10
1 PURPOSE
This document describes the assembly of 78 Series valves.
2 SCOPE
This procedure concerns all 78 Series bodies, not including the pilot.
3 DOCUMENTATION NEEDED
1. Bill of material
2. 09.11 Cleaning procedure
3. I-5-16 Tightening torque instruction
4. 11.00 Test procedure
4 VISUAL INSPECTION
Check the parts condition (impact, scratch), especially on gaskets and sealing surfaces (body, nozzle,
disc, disc holder).
5 GRINDING PROCESS
The nozzle and the disc must be ground prior to assembling the pressure relief valve.
6 TRACEABILITY
Check if the parts numbers match with the production order :
-Item number
-Serial number or purchasing number
8 78 SERIES PARTS
50
46
40
41
10 7
RP NB English designation
1 1 Body
56
8 2 1 Cover
3 1 Seat
7 2 Back up ring
82
11 8 1 Guide ring
83 9 1 Guide
11 1 Disc
43 35 6 Threaded rod
3
40 1 Cover gasket
41 1 Body gasket
43 1 Seat gasket
46 1 Spring
35 50 6 Nut
56 1 Piston
82 1 Retainer washer
83 1 Retainer screw
1
Document ref: I.5.45
Standard Operating Procedure
78 Series Page: 7 / 10 Revision: A
9 OPERATING MODE
40
43
9
1 41
11
10
Grease
82
7
10
8
83
56
46
50
2
35
10 SEALING
Our products are sealed to guarantee that they have been manufactured in accordance with our quality system.
Sealing is carried out after the tests, see the 11.00 Test procedure.