TAGGING ES - S - T ES - NS - T ES - NS - NT

ES-ENABLING STRUCTURE, S-STANDARD, NS-NON STANDARD, T-TO BE TAGGED, NT- NOT TO BE TAGGED
Original Drawing Size A3
STAGE - 1 STAGE - 2 STAGE - 3
1. TIE REBAR FOR PILE CAP AND POSITION THE VERTICAL BARS OF PIER 1. REMOVE PILE CAP SHUTTERS AFTER CONCRETING. 1. ACCESS SCAFFOLDING ARRANGEMENT TO BE PROVIDED AROUND THE PIER FOR TYING
2. PROVIDE LEDGER PIPE SUPPORT ALL ON THE FOUR SIDES AS SHOWN IN THE PLAN VIEW WITH CONCRETE 2. TIE STIRRUPS AT THE STARTER POSITION. THE STIRRUPS TO VERTICAL BARS.
BLOCK 3. COMPLETE THE STARTER POSITION CONCRETING. 2. PLACE COUNTER BLOCKS IN PLACE ON FOUR SIDES.
3. PILE CAP SHUTTERS TO BE PLACED AND CONCRETING TO BE DONE. 3. TIE SLING TO THE CONCRETE BLOCK AND REBAR CAGE (STIRRUPS) USING DEE-SHACKLE
AND TURN BUCKLE FOR REQUIRED CAPACITY.
4. SIMULTANEOUSLY REMOVE THE LEDGER PIPE AND ENGAGE THE CABLE WIRE WITH
CONCRETE BLOCKS
2 Nos. STIRRUPS
GUY WIRE TO BE CONNECTED AT THE NODAL POINT
DEE -SHACKLE

WIRE ROPE CLAMP


4 th Height (max)

(TYP) 10Ø SLING


(TYP)
10Ø SLING
(TYP)

(TYP)

LATERAL SUPPORT LATERAL SUPPORT

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
1

NB 40Ø(M) PIPE NB 40Ø(M) PIPE


XXXX XXXX XXXX XXXX XXXX

(TYP) (TYP)

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC
XXXX XXXX XXXX XXXX XXXX

BRACING BRACING 10Ø SLING

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
6000
NB 40Ø(M) NB 40Ø(M)
XXXX XXXX XXXX XXXX XXXX

(TYP)
PIPE PIPE

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC
(TYP) (TYP)
6000

6000

XXXX XXXX XXXX XXXX XXXX

TURN BUCKLE

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
(BOUGHT OUT COMPONENT)
BARRICADE BARRICADE BARRICADE

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC
XXXX XXXX
XXXX XXXX XXXX

(TYP) (TYP) (TYP)

45°
CONCRETE

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
DEE -SHACKLE
BLOCK
XXXX XXXX XXXX XXXX XXXX
°

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC
45

GL GL GL XXXX XXXX XXXX XXXX XXXX

COUNTER
COMPACTED COMPACTED WEIGHT
9000 SOIL (TYP) SOIL (TYP) (TYP)
9000 9000
TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT
(SCALE 1:100)
TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT
TRAFFIC DIRECTION (SCALE 1:100) (SCALE 1:100)
TRAFFIC DIRECTION TRAFFIC DIRECTION
50
0 0 COUNTER
50
WEIGHT
(TYP)
(1m x1m)
500

10
0

CONCRETE BLOCK

10Ø
SLING
(TYP)

100
(TYP)
(TYP)
1000

BARRICADE
(TYP)

500
500

(TYP) (TYP) BARRICADE BARRICADE


(TYP) 1000 (TYP)
(TYP)
TRAFFIC DIRECTION
TRAFFIC DIRECTION TRAFFIC DIRECTION
PLAN VIEW
(SCALE 1:100)
PLAN VIEW PLAN VIEW
(SCALE 1:100) (SCALE 1:100)
GENERAL CONSULTANT

NOTES:
REVISIONS CONTRACTOR DETAIL DESIGN CONSULTANT CLIENT
CHENNAI METRO RAIL LIMITED.
ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI - 600107 (INDIA)

1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS


ARE IN METERS. Notification : L&T CONSTRUCTION DRAWING TITLE PIER REBAR Issue Approved
A B C
2. THE SLING SHALL BE ALWAYS CONNECTED ABOVE Record for Issue
THE CG OF PIER REBAR CAGE As noted in the DSR No. -------------------------- dated ----------------
A : Objection A complete resubmission is required.
B : No Objection with comments. PROJECT TITLE Preliminary Design
1. HT OF PIER < 9m ONE LEVEL OF SLING C : Notice of No objection.
TYP. HOLDING ARRANGEMENT FOR
2. HT OF PIER > 9m TWO LEVEL OF SLING DRS REFERENCE :
CHENNAI METRO RAIL PROJECT PHASE 2 Definitive Design
PIER REBAR TYING
CHECKED BY REVIEWED BY ISSUDED BY DATE
Construction Reference

CORRIDOR & PACKAGE DRAWING NUMBER REV


Good For Construction

BY CONTRACTOR
A 15.03.2023 PRELIMINARY PKI HP/TNA RB TMS
DESIGNED BY CHECKED BY APPROVED BY DATE
SD2301-Q-EM-0001 A
(SHEET 1 OF 1)
This document should not be relied on or used in circumstances other than those for which it was originally
prepared and for which L&T Construction was commisioned. L&T construction accepts no responsibility for this CAD FILE SCALE
REV. DATE DESCRIPTION DRAWN DESIGN CHKD APP. HP/TNA RB TMS 15.03.2023 document to any other party other than the person by whom it was commisioned.
AS SHOWN
TAGGING ES - S - T ES - NS - T ES - NS - NT
STAGE - 4 Original Drawing Size A3
1. SCAFFOLDING ARRANGEMENT TO TIE THE STIRRUPS TO BE ES-ENABLING STRUCTURE, S-STANDARD, NS-NON STANDARD, T-TO BE TAGGED, NT- NOT TO BE TAGGED
PROVIDED FOR REMAINING HEIGHT.
2. VERTICAL BARS TO BE INSTALLED FOR REMAINING HEIGHT. STAGE - 5 STAGE - 6 STAGE - 7
3. SECOND LEVEL OF SLING FROM CONCRETE BLOCK TO 1. TIE UP THE STIRRUPS TO THE REMAINING HEIGHT. 1. SCAFFOLDING ARRANGEMENT TO BE REMOVED 1. PLACE THE PIER SHUTTER ON TWO SIDES.
REBAR CAGE TO BE PROVIDED. AFTER COMPLETION OF STIRRUPS TYING.
1 th OF HEIGHT (max)

1 th OF HEIGHT (max)

1 th OF HEIGHT (max)
2. REMOVE TWO SUPPORTING CABLE WIRES IN
1 th OF HEIGHT (max)

THE BOTTOM.
(TYP)

(TYP)

(TYP)
(TYP)

4
4
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

(MAX.)

(MAX.)
12000

12000
(MAX.)

(MAX.)
12000

12000

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

10Ø SLING
XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX

10Ø SLING
10Ø SLING 10Ø SLING (TYP) (TYP)
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

XXXX XXXX XXXX XXXX XXXX


(TYP) XXXX XXXX XXXX XXXX XXXX
(TYP)
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

6.0 to 6.5m HEIGHT


XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

BARRICADE BARRICADE
BARRICADE BARRICADE (TYP) (TYP)
74
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

45°

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
.5°

(TYP) (TYP)
CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

CY CM 10

XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

0051-VC

GL GL GL
GL XXXX XXXX XXXX XXXX XXXX
GL XXXX XXXX XXXX XXXX XXXX

COUNTER COUNTER
WEIGHT WEIGHT
(TYP) (TYP)
9000
9000 9000 9000
TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT
(SCALE 1:100) (SCALE 1:100) (SCALE 1:100) (SCALE 1:100)

TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION


COUNTER COUNTER COUNTER COUNTER
WEIGHT WEIGHT WEIGHT WEIGHT
(TYP) (TYP) (TYP) (TYP)
(1m x1m) (1m x1m) (1m x1m) (1m x1m)

10Ø 10Ø 10Ø 10Ø


SLING SLING SLING SLING
(TYP) (TYP) (TYP) (TYP)
(TYP)

(TYP)

(TYP)

(TYP)
1000

1000

1000

1000

BARRICADE BARRICADE BARRICADE BARRICADE


1000 (TYP) 1000 (TYP) 1000 (TYP) 1000 (TYP)
(TYP) (TYP) (TYP) (TYP)

TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION


PLAN VIEW PLAN VIEW PLAN VIEW PLAN VIEW
(SCALE 1:100) (SCALE 1:100) (SCALE 1:100) (SCALE 1:100)
GENERAL CONSULTANT

NOTES:
REVISIONS CONTRACTOR DETAIL DESIGN CONSULTANT CLIENT
CHENNAI METRO RAIL LIMITED.
ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI - 600107 (INDIA)

1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS


ARE IN METERS. Notification : L&T CONSTRUCTION DRAWING TITLE PIER REBAR Issue Approved
A B C
2. THE SLING SHALL BE ALWAYS CONNECTED ABOVE Record for Issue
THE CG OF PIER REBAR CAGE As noted in the DSR No. -------------------------- dated ----------------
A : Objection A complete resubmission is required.
B : No Objection with comments. PROJECT TITLE Preliminary Design
1. HT OF PIER < 9m ONE LEVEL OF SLING C : Notice of No objection.
TYP. HOLDING ARRANGEMENT FOR
2. HT OF PIER > 9m TWO LEVEL OF SLING DRS REFERENCE :
CHENNAI METRO RAIL PROJECT PHASE 2 Definitive Design
PIER REBAR TYING
CHECKED BY REVIEWED BY ISSUDED BY DATE
Construction Reference

CORRIDOR & PACKAGE DRAWING NUMBER REV


Good For Construction

BY CONTRACTOR
A 15.03.2023 PRELIMINARY PKI HP/TNA RB TMS
DESIGNED BY CHECKED BY APPROVED BY DATE
SD2301-Q-EM-0002 A
(SHEET 1 OF 1)
This document should not be relied on or used in circumstances other than those for which it was originally
prepared and for which L&T Construction was commisioned. L&T construction accepts no responsibility for this CAD FILE SCALE
REV. DATE DESCRIPTION DRAWN DESIGN CHKD APP. HP/TNA RB TMS 15.03.2023 document to any other party other than the person by whom it was commisioned.
AS SHOWN
TAGGING ES - S - T ES - NS - T ES - NS - NT
STAGE - 8 STAGE - 9 ES-ENABLING STRUCTURE, S-STANDARD, NS-NON STANDARD, T-TO BE TAGGED, NT- NOT TO BE TAGGED
Original Drawing Size A3
1. PIER SHUTTER FOR THE REMAINING TWO SIDES TO BE ENGAGED. 1. PIER SHUTTER AND SUPPORTING TRESTLE
NOW ALL THE FOUR SIDES PIER SHUTTER IS BOLTED ALL CONNECTED TOGETHER ARRANGEMENT TO BE PROVIDED BELOW SECOND STAGE - 10
2. BOTTOM LEVEL SLINGS TIED TO THE REBAR CAGE TO BE REMOVED LEVEL OF SLING TIED TO THE REBAR CAGE.
1. SLING TIED TO THE REBAR CAGE AND CONCRETE BLOCK

1 th OF HEIGHT (max)
1 th OF HEIGHT (max)

SHALL BE REMOVED.

(TYP)
(TYP)

4
4

(MAX.)
12000
(MAX.)
(MAX.)

12000
12000

10Ø SLING
(TYP)

9.5m HEIGHT
9.5m HEIGHT

10Ø SLING
(TYP)
6.0 to 6.5m HEIGHT

BARRICADE BARRICADE BARRICADE


(TYP) (TYP) (TYP)

GL GL GL GL

COUNTER
COUNTER WEIGHT
WEIGHT (TYP)
9000 9000 9000
(TYP)

TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT
(SCALE 1:100) (SCALE 1:100) (SCALE 1:100)
TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION
COUNTER COUNTER
WEIGHT WEIGHT
(TYP) (TYP)
(1m x1m) (1m x1m)

10Ø 10Ø
SLING SLING
(TYP) (TYP)
(TYP)
(TYP)

1000
1000

BARRICADE BARRICADE BARRICADE


1000 (TYP) 1000 (TYP) (TYP)
(TYP) (TYP)

TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION

PLAN VIEW PLAN VIEW PLAN VIEW


(SCALE 1:100) (SCALE 1:100) (SCALE 1:100)
GENERAL CONSULTANT

NOTES:
REVISIONS CONTRACTOR DETAIL DESIGN CONSULTANT CLIENT
CHENNAI METRO RAIL LIMITED.
ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI - 600107 (INDIA)

1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS


ARE IN METERS. Notification : L&T CONSTRUCTION DRAWING TITLE PIER REBAR Issue Approved
A B C
2. THE SLING SHALL BE ALWAYS CONNECTED ABOVE Record for Issue
THE CG OF PIER REBAR CAGE As noted in the DSR No. -------------------------- dated ----------------
A : Objection A complete resubmission is required.
B : No Objection with comments. PROJECT TITLE Preliminary Design
1. HT OF PIER < 9m ONE LEVEL OF SLING C : Notice of No objection.
TYP. HOLDING ARRANGEMENT FOR
2. HT OF PIER > 9m TWO LEVEL OF SLING DRS REFERENCE :
CHENNAI METRO RAIL PROJECT PHASE 2 Definitive Design
PIER REBAR TYING
CHECKED BY REVIEWED BY ISSUDED BY DATE
Construction Reference

CORRIDOR & PACKAGE DRAWING NUMBER REV


Good For Construction

BY CONTRACTOR
A 15.03.2023 PRELIMINARY PKI HP/TNA RB TMS
DESIGNED BY CHECKED BY APPROVED BY DATE
SD2301-Q-EM-0003 A
(SHEET 1 OF 1)
This document should not be relied on or used in circumstances other than those for which it was originally
prepared and for which L&T Construction was commisioned. L&T construction accepts no responsibility for this CAD FILE SCALE
REV. DATE DESCRIPTION DRAWN DESIGN CHKD APP. HP/TNA RB TMS 15.03.2023 document to any other party other than the person by whom it was commisioned.
AS SHOWN
TAGGING ES - S - T ES - NS - T ES - NS - NT
ES-ENABLING STRUCTURE, S-STANDARD, NS-NON STANDARD, T-TO BE TAGGED, NT- NOT TO BE TAGGED
Original Drawing Size A3
STAGE - 11 STAGE - 12
1. SHUTTER ARRANGEMENT TO BE PROVIDED 1. COMPLETE THE CONCRETING OF THE PIER. STAGE - 13
FOR BALANCE POUR HEIGHT. 1. PIER SHUTTERS AND SUPPORTING TRESTLES TO
BE REMOVED AFTER CONCRETE ATTAINS
REQUIRED DESIGN STRENGTH
(MAX.)
(MAX.)

12000
12000

(MAX.)
12000
BARRICADE BARRICADE
(TYP) (TYP)

GL GL GL

COUNTER
WEIGHT
(TYP)
9000 9000

TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT TYP. ELEVATION FOR REBAR HOLDING ARRANGEMENT
(SCALE 1:100) (SCALE 1:100) (SCALE 1:100)
TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION

BARRICADE BARRICADE BARRICADE


(TYP) (TYP) (TYP)

TRAFFIC DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION

PLAN VIEW PLAN VIEW PLAN VIEW


(SCALE 1:100) (SCALE 1:100) (SCALE 1:100)
GENERAL CONSULTANT

NOTES:
REVISIONS CONTRACTOR DETAIL DESIGN CONSULTANT CLIENT
CHENNAI METRO RAIL LIMITED.
ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI - 600107 (INDIA)

1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS


ARE IN METERS. Notification : L&T CONSTRUCTION DRAWING TITLE PIER REBAR Issue Approved
A B C
2. THE SLING SHALL BE ALWAYS CONNECTED ABOVE Record for Issue
THE CG OF PIER REBAR CAGE As noted in the DSR No. -------------------------- dated ----------------
A : Objection A complete resubmission is required.
B : No Objection with comments. PROJECT TITLE Preliminary Design
1. HT OF PIER < 9m ONE LEVEL OF SLING C : Notice of No objection.
TYP. HOLDING ARRANGEMENT FOR
2. HT OF PIER > 9m TWO LEVEL OF SLING DRS REFERENCE :
CHENNAI METRO RAIL PROJECT PHASE 2 Definitive Design
PIER REBAR TYING
CHECKED BY REVIEWED BY ISSUDED BY DATE
Construction Reference

CORRIDOR & PACKAGE DRAWING NUMBER REV


Good For Construction

BY CONTRACTOR
A 15.03.2023 PRELIMINARY PKI HP/TNA RB TMS
DESIGNED BY CHECKED BY APPROVED BY DATE
SD2301-Q-EM-0004 A
(SHEET 1 OF 1)
This document should not be relied on or used in circumstances other than those for which it was originally
prepared and for which L&T Construction was commisioned. L&T construction accepts no responsibility for this CAD FILE SCALE