Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Dear Sir/Ma’am

Area
Canopy
Main House
Office
Torre
Garage

DESCRIPTION UNIT UNIT PRICE


Cpac Concrete 50 PCS 120.00 6,000
Round Ridge 264 PCS 209.00 55,176
Barge End 2 PCS 293.00 586
Eave Starter 28 PCS 108.00 3,024
Barge T-Brick 7 PCS 300.00 2,100
Tile Screw 60 PCS 2.00 120
Wafer Screw 50 PCS 3.00 150
Eagle Cement 10 PCS 230.00 2,300
Sand 70 PCS 40.00 2,800
Installation of Cpac Concrete 18,000
Roof Tiles with Accessories
And Metal Framing

Total Amount for Labor and Materials = 90,256

Full Payment for Materials = Php 72,256


30% Down Payment for Labor = Php 5,400
Full Payment for Labor after Completion = Php 12,600

Prepared By: Romeo L. Magcamit


Contact Number : 09236696624

BDO Account No. 010400100991


Name Account: Rolly Magcamit
Dear Sir/Ma’am

That's may quotation for


Roofing refer to streamline
Ang change gutters additional flashing

Scope of works
1. Attic remove
2. Attic to streamline
3. Change gutter in mean house
4. Additional wall flashing
5. Additional cement to cup flashing in right side
6. Painting to same color roofing to half roof in this house

Price for labor and materials

Total = Php 43,000

Prepared By: Romeo L. Magcamit


Contact Number : 09236696624

BDO Account No. 010400100991


Name Account: Rolly Magcamit
Contractor: Ms. Marichu Miranda
Project: Royal Villas Salaban Tagaytay

Labor & Material

Supply and Installation of Roof

Item Specification Quantity Unit Unit Cost Amount


1 Shingles Laminated 55 Bundles 2,500 137,500
2 Pangpalopo 3 tab 6 Bundles 2,500 15,000
3 Felt Paper 2 Roll 1,200 2,400
4 Drepp Egde 20 Pcs 200 4,000
5 Flated Nails 1 8 Kg 250 2,000
6 Silicon Sealant 2 Pcs 300 600

Delivery Charges 10,000


Mobilization 5,000
Labor 15,000

Total Amount for Labor and Materials = Php 191,500

Prepared By: Romeo L. Magcamit


Contact Number : 09236696624

BDO Account No. 010400100991


Name Account: Rolly Magcamit

You might also like