Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

1.0 PURPOSE
This practice provides standards, procedures, nomenclature, and the mandatory requirements for
preparation and execution of project calculations.

The electrical calculation work process is further described in the Activity Based Work Flow Diagram
000.265.8840.

2.0 APPLICATION
This practice applies to Electrical Engineering calculations performed under contract or are required for
the basis of the design. Electrical Engineering calculations include hand calculations and computer-
generated calculations such as those performed using spreadsheets, Smart Plant Electrical (SPEL),
and electrical engineering analysis programs.

The Electrical Project Lead holds the overall responsibility for the correct implementation and
application of this practice on the project.

This practice is to be made available to the project team in a central repository.

This practice does not apply to calculations performed by suppliers or third party agencies.

Electrical calculations developed and performed on a project may include:

Cable Pulling Calculation


Standby Generator Loading Calculation
UPS Loading Calculation
Cable Tray Fill Calculation
Random Tray Loading Ampacity Calculation
Voltage Drop Calculations (for small power)
Lighting Illumination Calculations
Heat Rejection / Emission Calculations
Battery and Charger Sizing Calculation
Equipment Sizing Calculation
Capacitor Bank Sizing Calculation
Neutral Earth Resistor Sizing Calculation
Grounding/Earthing Calculations
Cable Sizing Calculation
Lightning Protection Calculation
Transformer Sizing Calculation
Conduit Filling Calculation
Trench/ Conduit Sizing Calculation
Cable Sizing Calculations (Low Voltage/Medium Voltage/High Voltage)

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 1/6
11/10/2020 000.265.9001 Electrical Calculations.pdf

Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

NGR Sizing Calculations


Medium Voltage Cable Sizing Calculations
Duct Bank Calculation
Substation Ground Grid Calculation

For power system studies refer to practice 000.265.9330, Power System Study.

3.0 INTERFACING DISCIPLINES


This practice requires that as a minimum and as applicable the following disciplines participate on an
internal review process during the development of the calculation:

Process Engineering
Control Systems Engineering
Telecommunications
Mechanical Equipment Engineering
HVAC (Heating, Ventilation, and Air Conditioning)
HSE (Health, Safety, and Environment)
Architectural (Building Services)
Piping Engineering
Pipelines
Construction (General)
Engineering Management

4.0 DEFINITIONS
See glossary at the end of this practice

5.0 This section has been left intentionally blank

6.0 REQUIREMENTS
6.1 The Electrical Project Lead will initiate and monitor the development of electrical
calculations.
The overall work process for electrical calculations is shown in the Activity Based Estimate
Flow Diagram (000.265.8840).

This includes the following activities:

Enforces that the electrical calculations are based on relevant project technical documents
(specifications, single line diagrams, electrical design criteria, etc.), and applicable codes
and standards.

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 2/6
11/10/2020 000.265.9001 Electrical Calculations.pdf

Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

Creates and maintains an electronic calculations log.


Establishes the calculation numbering format to the used
Determines phased engineering requirements to develop preliminary calculations.
Assigns an Electrical Engineer to complete the calculations in accordance with this practice.
Establishes the electronic filing system to be used.

The following electrical calculations may be developed and performed on the project:

Cable Pulling Calculation


Standby Generator Loading Calculation
UPS Loading Calculation
Cable Tray Fill Calculation
Random Tray Loading Ampacity Calculation
Voltage Drop Calculations (for small power)
Lighting Illumination Calculations
Heat Rejection / Emission Calculations
Battery and Charger Sizing Calculation
Equipment Sizing Calculation
Capacitor Bank Sizing Calculation
Neutral Earth Resistor Sizing Calculation
Grounding/Earthing Calculations
Cable Sizing Calculation
Lightning Protection Calculation
Transformer Sizing Calculation
Conduit Filling Calculation
Trench/ Conduit Sizing Calculation
Cable Sizing Calculations (Low Voltage/Medium Voltage/High Voltage)
NGR Sizing Calculations
Medium Voltage Cable Sizing Calculations
Duct Bank Calculation
Substation Ground Grid Calculation

6.1.1 The Electrical Project Lead will determine the type of application as related to
the creation of calculations.

6.1.2 The Electrical Project Lead will verify the calculation software used has been
approved for use on the project.

6.1.3 The Electrical Project Lead will select and validate additional tools and software
required for calculations.
Validation process includes integrity, accuracy and correctness of selected
additional tools and software.

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 3/6
11/10/2020 000.265.9001 Electrical Calculations.pdf

Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

6.2 The Electrical Project Lead will drive electrical calculations development towards the
lowest Total Installed Cost and safety in design consistent with the project Class of
Facility Quality (CFQ), the Contract, and the Scope of Work.
Requirements for implementing Cost Competitive Engineering and Design Activities are
described in Practice 000.200.1400.

Documentation that supports cost competitive design changes (such as Technical Deviation
Notices (TDN), Design Decision Records (DDR), or Variances) is prepared, issued, and
documented in accordance with the project procedures.

The Electrical Engineer incorporates requirements related to safety in design industry


practices.

Requirements for the development of a project specific Class of Facility Quality are described
in Practice 000.100.1600.

6.3 The Electrical Engineer will create calculations as per project requirements.
This includes the following activities:

Documents basis, assumptions, clarifications, and references used to perform the


calculation.

Performs self-checks of the calculations.

Releases calculations for checking and incorporates comments or verifies that comments
have been incorporated into the calculations.

Incorporates data provided by Vendor during the procurement process.

Follows and complies with the requirements established in related project job bulletins.

Prepares calculations using approved project software.

Follow requirements related to professional engineering stamping for calculations.

Follows requirements established in practice 000.200.1020, Calculation Checking.

Keeps a permanent record of the calculation in the corresponding project discipline


directory.

6.4 The Electrical Project Lead will determine whether a re-calculation is necessary once
data provided by Vendor has been received.

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 4/6
11/10/2020 000.265.9001 Electrical Calculations.pdf

Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

6.5 The Electrical Engineer will maintain and file calculations as per project (retention)
requirements.
Refer to the Project File Index and Retention Schedule (PRI&RS).

The requirements for project file index and retention schedule are described in Practice
000.037.1101.

The project close out requirements for records disposition and retention are described in the
Project Procedures Manual (PPM) Practice 000.100.0060, Section 17 Project Close Out and
associated project Job Bulletins.

7.0 SUPPORTING RESOURCES

8.0 SUPPORTING KNOWLEDGE

9.0 ATTACHMENTS, ADDENDA, WORK INSTRUCTIONS


Addenda
Not Used
Attachment
Not Used
Work Instructions
Not Used

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 5/6
11/10/2020 000.265.9001 Electrical Calculations.pdf

Practice 000.265.9001
Date 10Nov2020
Electrical Engineering
Full Practice Printed from Quality Requirements System Global Library

ELECTRICAL CALCULATIONS

DEFINITIONS
The following terms and acronyms apply to this practice.

Title Description

CFQ Class of Facility Quality

Contract A deliberate agreement enforceable by law between two or more competent


persons or parties to perform or not to perform a specific act or acts. A
contract may be oral or written. Acceptance may be either in writing or by
performance, unless the PO / contract requires acceptance thereof to be in
writing, in which case it must be thus accepted.

Electrical Engineer Provides support to the Electrical Project Lead in producing the electrical
design specification as defined in this document.

Lightning A natural phenomenon; which is associated with a high electrostatic


discharge and high energy which may lead to loss of life and property.
Lightning protection system is installed to disperse the energy from a lightning
strike safely to earth.

Project Procedures Manual Practice 000.100.0060 - Defines the procedures and methods used to
(PPM) execute a project. Job bulletins are used to augment the PPM when needed
to provide project specific procedures

UPS Uninterruptible Power Supply

© 2020, Fluor Corporation. All rights reserved. Fluor Restricted Data. Further copying or distribution only by permission.
http://localhost:8082/PDF/000.265.9001%20Electrical%20Calculations.pdf 6/6

You might also like