Professional Documents
Culture Documents
DR Majid Albana - 27 Floor - Baghdad
DR Majid Albana - 27 Floor - Baghdad
m a j i d a l ba na @ h o t ma i l .co m
+ 9 6 4 7 7 0 2 7 24 811
Notes
job title
residential
building
SCALE As Shown
DATE 6 /2023
19.18
19.18
EL+1013.59m. EL+1013.59m.
APEX LINE. APEX LINE.
10.42
10.42
EL +103.17m. EL +103.17m.
HELI PAD.. HELI PAD..
39 39 39
38 38 38
37 37 37
36 36 36
35 35 35
34 34 34
33 33 33
5.85
5.85
32 32 32
31 31 31
4
30 30 30
29 29 29
28 28 28
27 27
26 26 26
25 25 25
24 24
23 23
22 22 22
21 21 21
20 20 20
19 19 19
18 18 18
4
17 17 17
16 16 16
15 15 15
14 14 14
13 13 13
12
11
10
9
EL +97.32m. 12
11
10
9 9
10
11
12
EL +97.32m.
TOP ROOF R C C.. TOP ROOF R C C..
2
3.30
3.30
2
3 EL +93.80m.
ROOF.F.R C C.
EL +93.80m.
ROOF.F.R C C.
3.52
3.52
3 EL +90.28 m.
3 3 EL +90.28 m.
25th.F. F. L. 25th.F. F. L.
2
3.52
3.52
3 EL +86.76 m. 3 EL +86.76 m.
24th.F. F. L. 24th.F. F. L.
2
3.52
3.52
EL +83.24 m. EL +83.24 m.
23rd.F. F. L. 23rd.F. F. L.
3 2
3.52
3.52
EL +79.72 0m. EL +79.72 0m.
2 22nd.F. F. L. 2 22nd.F. F. L.
3.52
3.52
3 EL +76.20 m.
21st.F. F. L.
EL +76.20 m.
21st.F. F. L.
3 3.52
3.52
3 EL +72.68 m.
20th.F. F. L. 3 3 EL +72.68 m.
20th.F. F. L.
3.52
3.52
EL +69.16 m. 3 EL +69.16 m.
19th.F. F. L. 19th.F. F. L.
2
3.52
3.52
132.52
132.52
EL +65.64 m. EL +65.64 m.
18th.F. F. L. 18th.F. F. L.
3.52
3.52
2
EL +62.12 m. EL +62.12 m.
3 17th.F. F. L. 17th.F. F. L.
2
3.52
3.52
2 3 EL +58.60 m. EL +58.60 m.
16th.F. F. L. 16th.F. F. L.
3.52
3.52
3 EL +55.08 m. EL +55.08 m.
15th.F. F. L. 15th.F. F. L.
3.52
3.52
3
EL +51.56 m.
14th.F. F. L.
3 EL +51.56 m.
14th.F. F. L.
3.52
3.52
EL +48.04 m. EL +48.04 m.
3 13th.F. F. L. 13th.F. F. L.
3.52
3.52
EL +44.52 m.
12th.F. F. L.
3 EL +44.52 m.
12th.F. F. L.
3.52
3.52
EL +41.00m. EL +41.00m.
3 11th.F. F. L. 11th.F. F. L.
2
3.52
3.52
2 EL +37.48 m. EL +37.48 m.
10th.F. F. L. 10th.F. F. L.
3
3.52
3.52
EL +33.96 m.
9th.F. F. L. 3 EL +33.96 m.
9th.F. F. L.
3.52
3.52
EL +30.44 m. EL +30.44 m.
8th.F. F. L. 8th.F. F. L.
3.52
3.52
EL +26.92 m. EL +26.92 m.
7th.F. F. L. 7th.F. F. L.
2
3.52
3.52
EL +23.40m. 3 EL +23.40m.
6tht.F. F. L. 6tht.F. F. L.
2
3.30
3.30
3 EL +20.10 m.
5th.F. F. L.
EL +20.10 m.
5th.F. F. L.
3.30
3.30
4 EL +16.80 m. 3 EL +16.80 m.
4 4 4th.F. F. L. (PODIUM 3) 4th.F. F. L. (PODIUM 3)
3.30
3.30
EL +13.50m. EL +13.50m.
3 3rd.F. F. L. (PODIUM 2) 3rd.F. F. L. (PODIUM 2)
3.30
3.30
EL +10.20m.
2 EL +10.20m.
1
1
2nd.F. F. L. (PODIUM 1)
3 2nd.F. F. L. (PODIUM 1)
4.95
4.95
1
EL +5.25m. 3 EL +5.25m.
1st. F. F. L( MEZZANINE) 1st. F. F. L( MEZZANINE)
2 3 3
4.95
4.95
29.59
4
EL +0.30m.
0.30
EL +0.30m.
0.30
GRND .F. F. L. GRND .F. F. L.
job title
(A)
drawing title
1
drawn
approved
A. GENERAL C1.3 CONCRETE PROPERTIES J. GENERAL FOUNDATIONS NOTES K3. PILE TESTING
M. JOINTS
A1. ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT CIVIL, INFRASTRUCTURE, J1. ALL FOUNDATIONS SHALL BE CONSTRUCTED UPON WATERPROOFING SYSTEM AND A 100mm CONCRETE BLINDING K13. PILES TESTING SHALL CONFORM TO ACI 543 STANDARDS AND PROJECT SPECIFICATION.
ARCHITECTURAL, MECHANICAL, ELECTRICAL DESIGN DRAWINGS, BOQ AND SPECIFICATIONS. IF ANY DISCREPANCY CEMENT MAX. AGGREGATE MIN. CEMENT MAX. W/C GGBS/ 28 DAYS SLAB WHICH HAS BEEN PLACED OVER AGGREGATE LAYER ACCORDING TO SOIL TEST RECOMMENDATIONS, OVER M.1 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING PROPOSED
CONCRETE
SIZE (mm) CONTENT (kg/m3) RATIO FLY ASH STRENGTH (MPa)
IS FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY BEFORE PROCEEDING WITH THE TYPE THE STABILIZED NATURAL SOIL. K14. THE CONTRACTOR SHALL ALLOW FOR 2 PRELIMINARY PILES AS LISTED IN THE TABLE BELOW, CONSTRUCTION / CONTRACTION JOINTS LAYOUT & DETAIL FOR APPROVAL
PORTION OF WORK INVOLVED. (SUPER STRUCTURE) OPC* 20 400* 0.45* THE LOCATION OF WHICH SHALL BE AGREED WITH THE ENGINEER. THE PRELIMINARY TEST PILES BY THE ENGINEER BEFORE CONSTRUCTION.
J2. DO NOT BACKFILL AGAINST PIT OR RETAINING WALLS UNTIL THE CONCRETE HAS ATTAINED FULL DESIGN STRENGTH. SHALL BE LOADED UNDER STATIC COMPRESSIVE LOADS TO 1.5 TIMES THE PILE CAPACITY.
(SUB STRUCTURE) AS PER C1.1
A2. FOR MAIN SETTING LINES AND LEVELS, REFER TO THE ARCHITECTURAL DRAWINGS. ALL DIMENSIONS MUST BE OPC* 20 400* 0.45*
M.2 CONTRACTION JOINTS SHALL BE IMPLEMENTED AND PERFORMED BY
VERIFIED ON SITE AND ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER FOR CLARIFICATION. BLINDING OPC* 20 250* 0.6* J3. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO PREVENT ANY WATER, FROM PENETRATING ANY
MAX. 10.0m AS PER TYPICAL STRUCTURAL DETAIL.
PILED FOUNDATIONS OR STRUCTURAL (HYDROSTATIC) SLABS BEFORE AND AFTER PLACING CONCRETE, AND UNTIL PRELIMINARY PILE LOAD TESTS
* TO BE CONFIRMED BY SOIL SPECIALIST.
A3. ALL DIMENSIONS ARE IN MILLIMETER, UNLESS OTHERWISE NOTED, AND ALL LEVELS ARE IN METERS. SUCH SUBGRADES ARE FULLY PROTECTED BY THE PERMANENT BUILDING STRUCTURE. N. ABBREVIATIONS O. ABBREVIATIONS
DO NOT SCALE DRAWINGS READ WRITTEN DIMENSIONS ONLY. PILE TEST LOAD
TEST TYPE
DIAMETER (mm) (kN)
J4. THE STRUCTURAL CONCRETE FOR EACH PILED FOOTING SHALL BE PLACED IN ONE (1) CONTINUOUS POUR WITH BOTTOM BARS B STRUCTURAL WALL BELOW SLAB LEVEL
A4. ALL SECTIONS SHALL BE COORDINATED WITH ARCHITECTURAL (AND OTHER TRADES) DRAWINGS BEFORE ERECTION 520 COMPRESSION 2200
THE STRUCTURAL RAFT VERTICAL POUR JOINTS SHALL TYPICALLY BE LOCATED IN THE MIDDLE THIRD OF THE COLUMN NUMBER 1 C1 STRUCTURAL WALL PLANTED ABOVE SLAB LEVEL
OF FORMWORK. ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ENGINEER FOR CLARIFICATION. SPAN BETWEEN COLUMNS OR WALLS. CENTIMETER cm DROP BEAM
J5. ALL REINFORCING FOR THE FOUNDATIONS, INCLUDING WALL AND COLUMN STARTER BARS SHALL BE PROPERLY DIAMETER Dia INVERTED BEAM OR PARAPET ABOVE SLAB LEVEL
A5. CONSTRUCTION LOADS SHALL NOT EXCEED THE (SIDL+1) KN PER SQUARE METER. PROVIDE ADEQUATE SECURED IN PLACE PRIOR TO CONCRETING. EXPANSION JOINT EJ COLUMN BELOW SLAB LEVEL
SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED THE FULL DESIGN STRENGTH. K15. THE CONTRACTOR SHALL PERFORM COMPRESSIVE LOAD TESTS ON WORKING PILES AS LISTED EACH STEP ES COLUMN PLANTED ABOVE SLAB LEVEL
J6. THE CONTRACTOR SHALL INSTALL THERMOCOUPLE SETS TO MONITOR AND RECORD HEAT GAIN IN THE PILED IN THE TABLE BELOW. PILES SHALL BE LOADED UNDER STATIC COMPRESSIVE LOADS TO EACH WAY EW PLAIN CONCRETE
A6. REFER TO ARCHITECTURAL (AND OTHER TRADES) DRAWINGS FOR OPENINGS AND SLEEVES IN CONCRETE
C2. CONCRETE REINFORCEMENT FOUNDATIONS CONCRETE DURING THE CEMENT HYDRATION PROCESS. ALL THERMOCOUPLE LOCATIONS SHALL BE 1.25 TIMES THE PILE CAPACITY. FINISH FLOOR LEVEL FFL SOLID BLOCK WALL
SLABS NOT SHOWN ON STRUCTURAL DRAWINGS, AND FOR SIZE AND LOCATION OF OPENINGS NOT DIMENSIONED. COORDINATED TO INSURE THAT THE DEVICES ARE NOT DISRUPTED DURING REINFORCING AND CONCRETE PLACEMENT.
HORIZONTAL BARS HOR HOLLOW BLOCK WALL
C2.1 GENERAL EACH THERMOCOUPLE SET CONSISTS OF 5 THERMOCOUPLES AND SHALL BE LOCATED IN INDICATED AREAS OF
NO BREAKAGE IS ALLOWED IN CONCRETE AFTER CASTING. WORKING PILE LOAD TESTS L SHAPED TOP BARS L SAND FILL
EACH PILED FOUNDATION POUR (IN PLAN) AND POSITIONED AS FOLLOWS:
HORIZONTAL LINKS AT L
Ls NATURAL SOIL
- REINFORCEMENT SHALL BE HIGH YIELD (YIELD STRESS = 460MPa ) MARKED `T', ONE (1) THERMOCOUPLE AT THE MID-HEIGHT PILE TEST LOAD
A7. REFER TO ARCHITECTURAL (AND OTHER TRADE DRAWINGS) FOR POSITIONS AND DIMENSIONS OF OPENINGS MARK TEST TYPE CONCRETE WALL COMPACTED FILL
THE CONTRACTOR SHALL PROVIDE DETAILED
DRAWINGS AND SCHEDULES OF THE REINFORCEMENT DIAMETER (mm) (kN)
IN REINFORCED CONCRETE WALLS AND COORDINATE WITH THOSE SHOWN ON STRUCTURAL DRAWINGS. ONE (1) THERMOCOUPLE MIDWAY BETWEEN THE MID-HEIGHT AND THE TOP
L
Lt HORIZONTAL LINKS AT SPECIAL WATER PROOFING
REINFORCEMENT FOR THE ENGINEER'S APPROVAL, IN ACCORDANCE ONE (1) THERMOCOUPLE MIDWAY BETWEEN THE MID-HEIGHT AND THE BOTTOM P6 520 COMPRESSION 2000
BOUNDARY ELEMENT BASECOURSE
A8. NO OPENINGS OR SLEEVES SHALL BE PLACED IN BEAMS OR COLUMNS EXCEPT AS INDICATED ON ONE (1) THERMOCOUPLE AT 300MM FROM TOP P54 520 COMPRESSION 2000 M MIDDLE BARS LIGHT WEIGHT FILL
STRUCTURAL DRAWINGS AND AS APPROVED. ONE (1) THERMOCOUPLE AT 300MM FROM BOTTOM
P62 520 COMPRESSION 2000 m METER LIGHT WEIGHT CONCRETE
- REINFORCEMENT SHALL CONFORM TO ASTM A615 STANDARDS.
TEMPERATURE READINGS FROM EACH THERMOCOUPLE SHALL BE ELECTRONICALLY RECORDED OVER A 90-DAY PERIOD MAX MAXIMUM PRECAST CONCRETE
A9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER SETTING OUT OF THE WORKS, FOR K17. A COMPREHENSIVE INSTRUMENTATION, MONITORING, AND REPORTING PROGRAM FOR THE INSTALLATION OF THE MIN MINIMUM
- REINFORCEMENT DETAILS SHOWN ON DRAWINGS ARE INDICATIVE FOR THE PREPARATION OF THE CONTRACTOR'S J7. THE CONCRETE MIX DESIGN AND THE CONSTRUCTION TECHNIQUES SHALL BE PREPARED TO LIMIT THE MAXIMUM
mm MILLIMETER THICKNESS OF SOLID SLABS
CORRECTNESS OF LINE AND LEVEL AND FOR QUALITY CONTROL OF THE MATERIALS. THE APPROVAL OF THE WORKING DRAWINGS. THE CONTRACTOR SHALL PROVIDE DETAILED SHOP DRAWINGS AND SCHEDULES OF THE TEMPERATURE DIFFERENTIAL BETWEEN ANY TWO POINTS WITHIN THE FOUNDATION TO 20 DEGREES CELSIUS, AND
K16. STANDARD SONIC INTEGRITY TESTING AT PILE HEAD SHALL BE PERFORMED FOR 100% No. NUMBER
ENGINEER SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY AND ANY ERRORS SHALL REINFORCEMENT FOR THE ENGINEER'S APPROVAL IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. A MAXIMUM CONCRETE TEMPERATURE OF 70 DEGREES CELSIUS. THE ADDITION OF ICE AS A REPLACEMENT FOR
OF THE NON LOAD TESTED PILES. N.T.S NOT TO SCALE THICKNESS OF RAFT FOUNDATION
BE RECTIFIED BY THE CONTRACTOR TO THE APPROVAL OF THE ENGINEER. A PORTION OF MIX WATER, THE REFRIGERATION OF MIX WATER, AND THE COOLING OF AGGREGATES AND CEMENT
PC PLANTED COLUMN
- WHERE BAR LENGTH IS NOT SPECIFIED, LONGEST PRACTICABLE BAR LENGTH SHALL BE EMPLOYED WITH MAY BE NECESSARY TO REDUCE CONCRETE MIX TEMPERATURE AND HEAT GAIN. THE TEMPERATURE OF THE TEST PILES , AND THE LOAD TESTING THEREOF SHALL BE ESTABLISHED AND REVIEWED PRIOR TO THE START
PW PLANTED WALL
STAGGERED LAP SPLICES. LAP LENGTH SHALL BE A MINIMUM OF 60 TIMES THE BAR DIAMETER, CONCRETE AT TIME OF PLACEMENT SHALL BE TESTED AND SHALL BE NOT GREATER THAN 32 DEGREES CELSIUS. OF PILING INSTALLATION.
R MILD STEEL BARS
UNLESS OTHERWISE NOTED. ANY CONCRETE WITH TEMPERATURE GREATER THAN 32 DEGREES CELSIUS SHALL BE REJECTED. PUNCHING SHEAR REINFORCMENT DETAIL NO 1
S STIRRUPS
B. DESIGN CRITERIA SJ SETTLEMENT JOINT
- ALL REINFORCING SPLICES SHALL DEVELOP 100% OF THE TENSILE CAPACITY OF THE REINFORCEMENT. PSD1
J8. CONSISTENCY (SLUMP) TESTS SHALL BE PERFORMED FOR EACH OF THE FIRST 5 TRUCKS SUPPLYING
T TOP BARS
B1. CODES AND STANDARDS ALTERNATIVE MECHANICAL SPLICES MAY BE CONSIDERED, PROVIDED THAT THEY DEVELOP FULL TENSILE STRENGTH.CONCRETE FOR THE FOUNDATIONS POURS.
LEVEL ON PLAN
WATERTIGHT PVC PILE HEAD GROUT FOR REBAR PROTECTION TOF TOP LEVEL OF FOUNDATION
SLEEVES
- REINFORCED CONCRETE: BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI 318M-19 TOC TOP LEVEL OF SLAB PLACE (T/B/U/L/M/S/V/H)
J9. CONCRETE CUBE SAMPLES SHALL BE TAKEN FOR THE FOUNDATIONS. THE REQUIREMENTS ARE AS INDICATED
- SEISMIC LOAD DESIGN: INTERNATIONAL BUILDING CODE (IBC 2009) TYP. TYPICAL LEVEL ON SECTION
IRAQI SEISMIC CODE C2.2 MINIMUM COVER TO REINFORCEMENT IN THE TECHNICAL SPECIFICATION - "CAST-IN-PLACE CONCRETE". BAR LENGTH IN mm
IN CASE RAFT THICKNESS LESS T&B TOP AND BOTTOM
THAN 60 PILE BAR DIAMETER, 4T20/200x6000(T) SPACING IN mm
- WIND LOAD DESIGN: AMERICAN SOCIETY OF CIVIL ENGINEERS (ACSE 7-16) J10. REFER TO THE SOIL INVESTIGATION REPORT No. SR 57/2019 DATED ON OCTOBER 2019
INDICATES TOP U U SHAPED BARS
COVER TO ALL REINFORCEMENT SHALL BE AS FOLLOWS UNLESS SHOWN OTHERWISE: USE STANDARD HOOK DETAILS
OF CAST PILE TO BAR DIAMETER IN mm
FOR ANY ADDITIONAL REQUIREMENTS. BE CUT TO FINAL VER VERTICAL BARS
= 75mm REINFORCED
GRADE OF STEEL (R/T)
60 BAR DIAMETER
ELEVATION (CUT VAR. VARIABLE
CONCRETE
= 75mm EARTH FACES, 40mm OTHER FACES PLIE RAFT OFF LEVEL)
W1 SHEAR WALL NUMBER 1 NUMBER OF BARS
= 75mm EARTH FACES, 40mm OTHER FACES
WATER TANK WALLS = 50mm PLIE RAFT T HIGH YIELD BARS
B2. DESIGN LOADS SUSPENDED SLABS = 30mm
REINFORCEMENT
(TYPICAL)
BEAMS AND LINTELS = 40mm
B2.1 LIVE LOADS = 60mm EARTH FACES, 40mm OTHER FACES
STRUCTURAL MEMBERS ARE DESIGNED TO RESIST THE TOTAL DEAD LOADS ACTING ON THEM PLUS = 30mm WITH THE SPECIFICATIONS.
THE FOLLOWING LIVE LOADS: = 60mm EARTH FACES, 40mm OTHER FACES
K. REINFORCED CONCRETE BORED PILES
PROVIDE 150mm
EXTERNAL RELATES TO CONCRETE FACES EXPOSED TO EXTERNAL ENVIRONMENT. FINAL EMBEDMENT
- BED ROOMS ............................................................................................................... 2.0 kPa K1. GENERAL INTO PLIE RAFT
- PARKING ..................................................................................................................... 5.0 kPa
- RAMPS .......................................................................................................................... 5.0 kPa D. EARTHWORKS, EXCAVATIONS AND DEWATERING K1. THE SOIL INVESTIGATION REPORT No. SR 57/2023 DATED ON OCTOBER 2023HAS BEEN PREPARED AND SHALL BE
- ASSEMBLY AREAS .......................................................................................................... 5.0 kPa CONSIDERED PART OF THE CONSTRUCTION DOCUMENTATION. THE INFORMATION GIVEN IN THE SOIL REPORT
- STORAGE ..................................................................................................................... 5.0 kPa D1. WHEN EXCAVATING TO FOUNDATION LEVEL CARE SHOULD BE TAKEN NOT TO DISTURB THE UNDERLYING IS SOLELY A GUIDE. RESPONSIBILITY IS ACCEPTED BY THE OWNER OR THE ENGINEER FOR ITS CORRECTNESS. 50mm PROTECTION SCREED
MATERIAL. ALL FOUNDATION EXCAVATIONS SHALL BE INSPECTED AND ANY SOFT SPOTS SHALL BE 4MM WATER PROOFING MEMBRANE
- LOBBY ........................................................................................................................... 5.0 kPa COMPACTED FILL UP TO
REMOVED AND REPLACED WITH GRANULAR FILL COMPACTED BEFORE CONSTRUCTION PROCEEDS. 95% OF MODIFIED PROCTOR TEST
EXCAVATION SHALL AT ALL TIMES BE CARRIED OUT IN DRY CONDITIONS. K2. ALL PILES SHALL BE BORED CAST IN SITU USING TEMPORARY STEEL CASING.
NATURAL SOIL
TO BE PROVIDED BY SPECIALIST
K5. ALL PILES SHALL UTILIZE SELF-COMPACTING CONCRETE (SCC) AND SHALL BE PLACED IN ONE CONTINUOUS
PILESGROUND WATER SHALL BE MAINTAINED AT LEAST 500mm BELOW THE DEEPEST POINT IN THE EXCAVATION CONCRETE POUR USING THE TREMIE METHOD.
I1. ALL LEVELS ARE REFERENCED TO ARCHITECTURAL DATUM LEVEL. MIN CEMENT CONTENT 400 kg/m3 SECTION 1-1(REFER TO PILE LAYOUT)
- CONCRETE ADDITIVES USED TO IMPROVE CONSISTENCY, WORKABILITY, QUALITY AND STRENGTH OF CONCRETE
SHALL BE APPROVED BY THE ENGINEER. job title
(A)
drawing title
1
drawn
approved
A B C D E F FF G GG H I J K L M
30.48
2.47
W7
12
11
10
9
SCHEDULE OF COLUMNS AND WALLS
W1 W2 W2 W2 W2 W1
COLUMNS SIZE
OR WALLS WIDTH REMARK
ID (mm) (mm)
W1 1900 500
8
W2 1900 700
7 W3 2500 350
W7
W6
W7
W6 W4 3500 350
6
W5 just basement
5
W6 W6 1500 400
W6
CW
4 W7 - 350
3
Notes
2
LW
W4 W5 W5 W5
W3
1
W8 W8 W8 W8 W8 W8
job title
(A)
approved 8 ST/D/08
P90 P90 P90 P90 P90 P90 P90 P90 P90
P1 P3
SPIRAL STIRRUPS T10@15 Cm. C/C SPIRAL STIRRUPS T10@15 Cm. C/C
P90 P90 P90 P90 P90 P90 P90 P90 P90
14 T 20
12 T 16
P-60 CM ∅ P-90 CM ∅
WORKING LOAD = 3350 KN WORKING LOAD = 5350 KN
01
no. date initials revision
02 3350 KN 5350 KN
04 ² ² ²
GGBS MICROCILICA
05 job title
148 kg. 260 kg.
approved
3 ST/D/06
P90 P90 P90 P90 P90 P90 P90 P90 P90
2.50
P90 P90 P90 P90 P90 P90 P90 P90 P90 0.05
0.10
0.25
0.25
job title
approved
3 ST/D/06
L1 (CLEAR SPAN) L2 (CLEAR SPAN) L3 (CLEAR SPAN)
SAME LAYER
SAME LAYER
SAME LAYER
BAR D
TOP AT DISC. BAR E BAR E BAR F
SUPPORT BAR C BAR C BAR C
TOP BARS TOP AT TOP BARS TOP AT TOP BARS TOP AT
SUPPORT SUPPORT SUPPORT
50 50
17Ø
90° ACI
90° ACI COVER (TYP.)
D
D
HOOK
17Ø
17Ø
HOOK SPLICE SPLICE SPLICE
SAME LAYER
SAME LAYER
CANTILEVER 0.05 L1 0.10 L1 0.10 L2 0.10 L3 0.05 L3
0.10 L2
50
FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
NOTES:
1. REFER TO BEAM SCHEDULE FOR NO. AND SIZE OF TOP AND BOTTOM BARS REQUIRED PER BEAM.
2. PROVIDE 60MM CENTRE TO CENTRE WHEN SCHEDULES CALL FOR 2 LAYERS OF REBARS. TYPICAL BEAM LONGITUDINAL SECTION
3. FOR CANTILEVER BEAMS OR RIBS, BARS SHOULD BE EXTENDED UP TO ONE HALF THE CANTILEVER SPAN. NOT TO SCALE
D
D
Tslab
60 BEAM 60
60 BEAM
REINF.
REINF. REINF.
BEAM
W W
REINF.
Type (1) SLAB no. date initials revision
Type (2)
TYPICAL INTERNAL BEAM SECTION
TYPICAL EDGE BEAM SECTION
N.T.S
N.T.S
Type (4)
job title
TYPICAL EDGE INV. BEAM SECTION TYPICAL BEAM LONGITUDINAL SECTION
N.T.S (A)
drawing title
approved
11
B' A'
12 No. Ø12
0
15
6@
Ø1
0
20
2 @
0.500
Ø1
5Ø16mm Ø16mm@200
Slab Reinf.
Ø12@150
0
15 Slab Reinf. 0
6@ 15
Ø1 6@
0 Slab Reinf. Ø1
Ø12@200 20
@
Ø 12 20
0
@
Ø12
Ø12@200
Slab Reinf.
CONCRETE COVERS
SECTION A'-A' (between slab & landing )
-SLABS = 25 mm
-BEAMS = 40 mm
no. date initials revision
-COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
job title
-RAFT FOUNDATION = 75 mm
(A)
drawing title
Stairs detail
scale date
12FLOORS + PENT-HOUSE 1-100 6 /2023
drawn job no. sheet no.
approved
7 ST/D/07
P90 P90 P90 P90 P90 P90 P90 P90 P90
3165
1495
985
P90 P90 P90 P90 P90 P90 P90 P90 P90
520
kc 8162
P90 P90 P90 P90 P90 P90 P90 P90 P90
44 - 12 m
PILES works
job title
(A)
drawing title
approved
3 ST/D/06
1000
3000
60
8240
5330
1000
3000
6000
job title
digging works
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 6 /2023
drawn job no. sheet no.
approved
3 ST/D/06
Main Bar 26- Ø25 26- Ø20 36- Ø20
FCU
Column Reinf.
Rest See
500 700
Section C 50
2500
1900
1900
TYPICAL EDGE TO BEAM DETAIL
Main Bar
Ties
10 th Floor
350
500 700
Section
Ground Level
foundation
level
1900
job title
FCU
Column Reinf.
Rest See
35
35 35
Section C 50
1500
TYPICAL EDGE TO BEAM DETAIL
Main Bar
Ties
350 40
10 th Floor
Section
Ground Level
foundation
level 35
3500
1500
job title
(A)
drawing title
Ø25@7 Cm C/C MAIN BARS Ø25@15 Cm C/C MAIN BARS Ø20@15 Cm C/C
W5 W6
designed project manager
drawn
scale
1-100
job no.
date
6 /2023
sheet no.
60 BAR DIAMETER
ELEVATION (CUT
CONCRETE
PLIE RAFT OFF LEVEL)
PLIE RAFT
REINFORCEMENT
(TYPICAL)
PROVIDE 150mm
FINAL EMBEDMENT
INTO PLIE RAFT
COMPACTED FILL UP TO
95% OF MODIFIED PROCTOR TEST
TO BE PROVIDED BY SPECIALIST
MIN. 13.00m DEPTH
P90 P90 P90 P90 P90 P90 P90 P90 P90
520 MM
PROVIDE ROLLER
SPACER ASSEMBLY
(MINIMUM 4 PER LEVEL)
PILE SPIRAL
T10/200MM
75mm CLEAR
COVER
approved
3 ST/D/06
WATERTIGHT PVC PILE HEAD GROUT FOR REBAR PROTECTION
SLEEVES
60 BAR DIAMETER
ELEVATION (CUT
CONCRETE
PLIE RAFT OFF LEVEL)
PLIE RAFT
REINFORCEMENT
(TYPICAL)
PROVIDE 150mm
FINAL EMBEDMENT
INTO PLIE RAFT
COMPACTED FILL UP TO
95% OF MODIFIED PROCTOR TEST
TO BE PROVIDED BY SPECIALIST
MIN. 13.00m DEPTH
P90 P90 P90 P90 P90 P90 P90 P90 P90
520 MM
PROVIDE ROLLER
SPACER ASSEMBLY
(MINIMUM 4 PER LEVEL)
PILE SPIRAL
T10/200MM
75mm CLEAR
COVER
approved
3 ST/D/06
A B C D E F FF G GG H I J K L M
30.48
12
11 T12@15 L=3.5m T16@15 L=3.5m T16@15 L=3.5m T16@15 L=3.5m T16@15 L=3.5m T16@15 L=3.5m
T16@20 L=3.5m
T16@15 L=3.5m
T16@20 L=3.5m
T16@15 L=3.5m
T16@15 L=3.5m
T16@15 L=3.5m
10
9
T10@20 L=5m
T16@20 L=5m
T16@20 L=5m
SLOPE
T12@20 L=5m
T16@20 L=2m
T10@20 L=5m T10@20 L=5m
T12@15 L=8.5m
8
T12@20 L=2m T12@20 L=2m
T16@20 L=3.5m
T16@20 L=3.5m
14 % SLOPE
14 % SLOPE
6
T16@20 L=2m
T16@20 L=2m
T16@15 L=3.5m T16@15 L=3.5m
T16@20 L=3.5m
T16@20 L=3.5m
4
T16@15 L=5m
5T12/m L=4m
3
5T12/m L=4m
5T12/m L=4m
6T12/m L=2m
SLAB 1 THK 25 CM
T20@15 Cm C/C (T&B)
T16@15 L=5m
16T15/m L=3.0m T16@15 L=3.0m T16@15 L=3.0m T16@15 L=3.0m T16@15 L=3.0m
T16@15 L=5m
T12@20 L=4.5m
T16@15 L=4.5m
T16@15 L=4.5m
T16@20 L=4.5m
T16@20 L=4.5m
1
no. date initials revision
job title
(A)
BASEMENT 2A SLAB
LAYOUT
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 6 /2023
drawn job no. sheet no.
approved 9
A B C D E F FF G GG H I J K L M
30.48
12
SLAB 3 THK 20 CM
T12@15 Cm C/C (T&B)
B4
11
T20@10 L=3.0m
T20@10 L=3.0m
SLAB 3 THK 20 CM T20@10 L=3.0m
10
T20@10 L=3.0m
T12@15 Cm C/C (T&B)
B3 B3 B3 B3 B3
9
B3 (INV)
@ 0.00 LEVEL
RAMP
B1
B1*
8 CB1(INV)
NOTE:
T16@15 L=1.5m
T12@15 L=3m T16@15 L=1.5m
T12@20 L=3.5m
STAIRCASE STAIRCASE
T12@20 L=3.5m
7
SLAB 1 THK 30 CM
T16@15 Cm C/C (T&B)
B3
LIFT
B2
T20@10 L=2m
T16@15 L=1.5m
T12@20 L=3.5m
B3
T12@20 L=3.5m
B3
5 T20@10 L=5m
CB1
T20@10 L=2m
4
T12@15 Cm C/C (T&B)
SLAB 3 THK 20 CM
B3
SLAB 2 THK 30 CM
T12@15 Cm C/C (T&B)
3 T12@15 L=6.0 m
T20@10 L=3.0m
B2
B2
T12@15 L=6.0m
LIFT
SUNK SLAB
T12@20 L=5.0m
B3
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
SLAB AT -O.6 LEVEL
SEE DRAWING NO. 34 B3
SLAB 2 THK 30 CM
T12@15 Cm C/C (T&B)
T12@15 L=3.0m T12@15 L=3.0m T12@15 L=3.0m
T12@15 L=1.5m T12@15 L=1.5m
job title
(A)
approved 9
SLAB AS PER SCHEDULE
SLAB REINFORCEMENT BARS
LEVEL +0.70
LEVEL +0.00
LEVEL +0.15
job title
(A)
drawing title
SECTIONS
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 6 /2023
drawn job no. sheet no.
approved 9
A B C D E F FF G GG H I J K L M
30.48
B1
12
11
CB1
CB1
SLAB 2 THK 20 CM
T20@15 Cm C/C (T&B)
10 B1 B1 B1 B1
B1
T15@15 L=6.0m
SLOPE
B4
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
B1
B1
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
B1
SLAB 2 THK 20 CM
8 T16@15 L=2m B1
T16@15 L=2m
B2
T20@15 L=1.5m T16@15 L=1.5m
STAIRCASE STAIRCASE
7
T16@15 L=3.5m
SUNK SLAB
B2
3T16 (T&B) EDGE BARS
T16@20
T16@20 L=5.0m
T16@15 L=2m
T16@15 L=2m
B4
B2
LIFT
B4
5 SLAB LEGEND:
SLAB 2 THK 20 CM
3T16 (T&B) EDGE BARS
4
SLAB 2
B4
B2
B3
3 VOID
T16@15 L=6m
T16@15 L=6m
T12@20 L=3.0m
B3
LIFT
T20@15 L=6.0m
T20@20 L=6.0m
T12@15 L=6.0m
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
1
no. date initials revision
approved 9
A B C D E F FF G GG H I J K L M
30.48
B1
12
11
CB1
CB1
SLAB 2 THK 20 CM
T20@15 Cm C/C (T&B)
10 B1 B1 B1 B1
B1
T15@15 L=6.0m
SLOPE
B4
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
B1
B1
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
B1
SLAB 2 THK 20 CM
8 T16@15 L=2m B1
T16@15 L=2m
B2
T20@15 L=1.5m T16@15 L=1.5m
STAIRCASE STAIRCASE
7
T16@15 L=3.5m
SUNK SLAB
B2
3T16 (T&B) EDGE BARS
T16@20
T16@20 L=5.0m
T16@15 L=2m
T16@15 L=2m
B4
B2
LIFT
B4
5 SLAB LEGEND:
SLAB 2 THK 20 CM
3T16 (T&B) EDGE BARS
4
SLAB 2
B4
B2
B3
3 VOID
T16@15 L=6m
T16@15 L=6m
T12@20 L=3.0m
B3
LIFT
T20@15 L=6.0m
T20@20 L=6.0m
T12@15 L=6.0m
SLAB 1 THK 30 CM
T20@15 Cm C/C (T&B)
1
no. date initials revision
approved 9
A B C D E F FF G GG H I J K L M
30.48
12
11
B2 B2 B1 B2 B2
10
T20@10 L=3.0m
T20@10 L=3.0m
9
T20@10 L=3.0m
T20@10 L=5.0m
T20@10 L=3.0m
T20@10 L=5.0m
T16@15 L=6.0m
T20@10 L=3.0m T20@10 L=3.0m
SLAB 1 THK 24 CM
T12@15 Cm C/C (T&B) T20@20
B1
T12@15C/C AS PER SCHEDULE
ADDITIONAL BARS
B1
OTS
T20@10 L=2m T20@10 L=2m
T20@10 L=2m
T20@10 L=2m
8 AS PER SCHEDULE
T12@20 L=4m
T16@15 L=2m
T12@20 L=4m
T16@20
B2
LIFT
B3
T20@10 L=2m
T20@10 L=2m
T16@15 L=1.5m T16@15 L=1.5m
5
T16@15 L=3.5m
B2
3
T16@15 L=6m
EXTRA BARS
T20@10 L=3.0m
3T16(T/B) AROUND THE
T16@15 L=6m
B2
OPENING
LIFT
3T16(T/B)
3T16(T/B)
3T16 (T&B)
2 3T16 (T&B) OPENING
DIAGONAL BARS
DIAGONAL BARS
B2
3T16(T/B)
T16@15 L=3.0m
T20@10 L=5.0m
T20@10 L=6.0m
T20@10 L=6.0m
T16@15 L=3.0m
T16@20 L=6.0m
T20@10 L=6.0m
T20@10 L=5.0m
TYPICAL O.T.S
job title
approved 9
A B C D E F FF G GG H I J K L M
30.48
12
11
B2 B2 B1 B2 B2
10
T20@10 L=3.0m
9
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=5.0m T20@10 L=3.0m T20@10 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
B1
SLAB 1 THK 24 CM T20@20 T12@15C/C AS PER SCHEDULE
B1
OTS
T20@10 L=2m T20@10 L=2m
T16@15 L=2m
8
T20@10 L=2m AS PER SCHEDULE
T12@20 L=4m
T16@15 L=3.0m
STAIRCASE STAIRCASE
7 T16@15 L=3.0m
T20@10 L=2m
T12@20 L=4m
T16@15 L=7.5 m
T20@10 L=2m
6
T16@15 L=7.5 m
T20@10 L=2m
B2
LIFT
B2
T20@10 L=2m
T16@15 L=3.0m
5 T16@15 L=3.0m
T20@10 L=5m
T12@20 L=1.5
T20@15 L=2m
4
OTS
B2
T20@15 L=6.0m
SLAB 2 THK 30 CM
T12@15 Cm C/C (T&B) T20@10 L=2.0m
3 EXTRA BARS
3T16(T/B) AROUND THE
B1
OPENING
LIFT
OTS
3T16(T/B)
3T16(T/B)
OTS 3T16 (T&B)
2 3T16 (T&B) OPENING
DIAGONAL BARS
DIAGONAL BARS
T20@10 L=3m
B2
T20@10 L=3m T20@10 L=3m
T20@15 L=6m 3T16(T/B)
T16@15 L=3.0m
T20@10 L=5.0m
T20@10 L=5.0m
T20@10 L=5.0m
T20@10 L=5.0m
T16@15 L=3.0m
TYPICAL O.T.S
T20@10 L=5.0m
(A)
approved 9
A B C D E F FF G GG H I J K L M
30.48
12
11
B2 B2 B1 B2 B2
10
9
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=5.0m T20@10 L=3.0m T20@10 L=3.0m T20@10 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
T12@20 L=5.0m
B1
SLAB 1 THK 24 CM T20@20 T12@15C/C AS PER SCHEDULE
B1
OTS
T20@10 L=2m T20@10 L=2m
T16@15 L=2m
8 T20@10 L=2m
AS PER SCHEDULE
T12@20 L=4m
T16@15 L=7.5 m
T20@10 L=2m
6
T16@15 L=7.5 m
B2
LIFT
B2
T20@10 L=2m
T20@10 L=2m
T16@15 L=3.0m
5
T16@15 L=3.0m
T12@20 L=1.5
4
OTS
B2
T20@15 L=6.0m
SLAB 2 THK 30 CM
T12@15 Cm C/C (T&B) T20@10 L=2.0m
3 EXTRA BARS
3T16(T/B) AROUND THE
B1
OPENING
LIFT
OTS
3T16(T/B)
3T16(T/B)
OTS 3T16 (T&B)
2 3T16 (T&B) OPENING
DIAGONAL BARS
DIAGONAL BARS
B2
T20@10 L=3m
3T16(T/B)
T16@15 L=3.0m T20@15 L=6m
T20@10 L=5.0m
T20@10 L=5.0m
T20@10 L=5.0m
T20@10 L=5.0m
T16@15 L=3.0m
TYPICAL O.T.S
T20@10 L=5.0m
job title
approved 9
A B C D E F FF G GG H I J K L M
30.48
T20@20
12 ADDITIONAL BARS
T12@15C/C AS PER SCHEDULE
AS PER SCHEDULE
11
B2 B2 B1 B2 B2
10
T16@15 L=3.0m
T16@15 L=3.0m
9 T20@10 L=3.0m
T20@10 L=3.0m
T20@10 L=5.0m
T20@10 L=3.0m
T20@10 L=3.0m T20@10 L=5.0m
T12@20 L=5.0m
PC1
T12@20 L=5.0m
T12@20 L=5.0m
LEVEL +74.2
T20@12 L=5.0m
B1
CORE WALL
B1
LEVEL +73.2
CORE WALL
OTS
T20@10 L=2m T20@10 L=2m
T16@15 L=2m
8
T20@10 L=2m
T20@10 L=2m
T16@15 L=7.5 m
T12@20 L=4m PC1
6
T16@15 L=7.5 m
T20@10 L=2m
T20@10 L=2m
PC1
B2
LIFT
B2
PC1
T16@15 L=3.0m
T16@15 L=3.0m
B2
T16@15 L=6.0m
SLAB 1 THK 35 CM
T12@15 Cm C/C (T&B)
T20@10 L=6.0m
T16@15 L=6.0m
T20@10 L=2.0m
3
PC2 SLAB 3 THK 20 CM
B1
OPEN
PC2 PC2 EXTRA BARS
3T16(T/B) AROUND THE
OTS
OTS OPENING
2
PC2
3T16(T/B)
3T16(T/B)
3T16 (T&B)
3T16 (T&B) OPENING
DIAGONAL BARS DIAGONAL BARS
T20@10 L=3m
T20@10 L=3m
B2
T20@10 L=3m
T20@15 L=6m
T20@10 L=5.0m
T20@10 L=5.0m
T20@15 L=5.0m
T20@15 L=5.0m
T16@15 L=3.0m
SLAB 2 THK 30 CM
T12@15 Cm C/C (T&B)
TYPICAL O.T.S no. date initials revision
1
job title
(A)
3T16 (T&B) EDGE BARS
drawing title
approved 9
A B C D E F FF G GG H I J K L M
30.48
12
11
10
9
T12@20 Cm C/C
T16@20 Cm C/C
B1
B1
SLAB 1 THK 25 CM
T16@15 Cm C/C (T&B)
B1
ROOF SLAB
B1
B1
B1
B1
B1
4
B1 B1
3 NOTE: B1
B1
B1 SLAB 2 THK 15 CM
B1
B1
T12@15 Cm C/C (T&B)
2 T10@20 Cm C/C
B1
SLAB 2 THK 15 CM
T12@15 Cm C/C (T&B)
T12@20 Cm C/C
ROOF SLAB
1
no. date initials revision
job title
approved 9
SCHEDULE OF BEAMS RAFT SLAB SCHEDULE OF BEAMS RAMP
job title
(A)
drawing title
SCHEDULE OF BEAM
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 6 /2023
drawn job no. sheet no.
approved 9