DR - Majid Al-Bana Park+ 7th Floor Karada Al Ataar
DR - Majid Al-Bana Park+ 7th Floor Karada Al Ataar
DR - Majid Al-Bana Park+ 7th Floor Karada Al Ataar
Notes
job title
Residential Tower
Structural
Drawings
SCALE As Shown
DATE 3/2024
3.40 3.40
+9647702724811
3.75
3.75
3.75
3.75
دبطم دبطم ةفرش
ةفرش
ديفروم
ديفروم
4.30
4.30
6.10
6.10
1.55
1.55
1.55
1.55
1.75
1.75
2.65
مدمد مدمد 2.65
محافممش
4.70
Notes
5.50
7.00 4.70
6.10
UP
DN
UP
دعصم
دعصم
THE BUILDING SYSTEM WILL BE
2.00
2.00
2.50 2.50
5.90
دمح دمح
19.90
19.90
CONSIDER AS SHEAR WALL
3.00
UP
ةفرش
4.00
15.70
دميحش
80
2.20
6.00
6.00
3.50
2.20
3.70
2.50
DN
100
UP
415
375
375
دبطم
415
415
375
375
دبطم
ةفرش دبطم ةفرش ةفرش دبطم ةفرش
ديفروم ديفروم ديفروم ديفروم
430
430
430
430
610 340 340 610 610 340 340 610
120 120
ةيف ةيف 120
ةيف ةيف 120
ةفرش ديوص ديوص ةفرش
155
مدمد
175
175
175
مدمد
175
175
175
مدمد مدمد
265 265 265 265
120 120
job title
400
400
470
فحطةم
470
470
ةفرش ةفرش
محدموف
550
550
550
550
محدموف
550
550
550
550
Residential Tower
400 620 120 400 620 120
120 120
620 620
150
150
ةفرش ةفرش
UP UP
0.70
0.70
100
100
ةفرش ةفرش
محدموف محدموف
390
390
610 610
555
555
ديوص ديوص
200
200
250 250
590
590
590
590
700 700
فحطةم
485
485
فحطةم
485
فحطةم 485
فحطةم
340 340
Structural
765
765
765
765
610 610
610
Drawings
610
600
600
600
600
بصمد بصمد
بصمد بصمد
260
260
260
260
600
600
240 240
240 240
ةيف ةيف ةيف ةيف
155
155
155
155
550
ديفروم
550
550
ديفروم ديفروم
375
375
375
325
DATE 3/2024
15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x MECH MECHANICAL
Nylon Sheet
0
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). x SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( ( ) 2023 \ \ \ ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (90K/ m²) AT DEPTH OF (-4.00m) ON GROUND SLAB
BELOW THE EXISTING N.G.L. MEMBER (mm) Typical Sec. Of Ramp
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40
2Ø16
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF Ø10 @ 200
COLUMNS 40 Ø10 @ 200
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D) 2Ø16
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
FORMED FOUNDATION 50 Arround all windos for loovers
LIQUID LIMIT ≤ 25%.
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 3-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø16
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø16@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 1000 1250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND. A
WATER STOPS SHOULD BE FACTORY MOLDED.
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG
. all dim. from ARCH D.W.G. DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF.
EXTENDING IN THE SHORT DIRECTION.
L<2000, h=200 , A=B=2-Ø12
SEC. ( a - a )
designed
GENERAL NOTES
project manager
L<5000, h=400 , A=2-Ø12 , B=2-Ø16 ENG : DR-Majid Albana
checked scale date
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5)
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT job no. sheet no.
2
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
NEW SLAB TO BE POURED FREE END SLAB
(CANTILEVER SLAB)
OLD SLAB
50% SUPPORTING
OLD SLAB
(BACK PROPPING)
3) WIND LOADS:
GENERAL NOTES :-
4) SEISMIC LOADS:
drawing title
approved
3 ST/D/03
A B C D
ADDITIONAL ADDITIONAL
Ø25@200 mm Ø25@200 mm
BOTTOM L=3m BOTTOM L=3m
D
ADDITIONAL
Ø25@200 mm
BOTTOM L=3m
4
B
Ø25@200 B. MESH B
ADDITIONAL ADDITIONAL -SLABS = 25 mm
Ø25@200 mm Ø25@200 mm
BOTTOM L=3m BOTTOM L=3m
-BEAMS = 40 mm
5 -COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
-RAFT FOUNDATION = 75 mm
6
-THE BUILDING IS DESIGNED FOR BASEMENT + GROUND
FLOOR + 6 FLOORS + PENT-HOUSE
ADDITIONAL
Ø25@200mm
BOTTOM L=3m
3.0
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
job title
3.0
BAR DIA.(mm) 10 12 16 18 20 22 25 (A)
drawing title
LAP LENGTH (mm) IN 400 500 600 650 700 800 900
Foundation Plan
PLAN OF FOUNDATION
COLUMNS REINFORCEMENT&SEC.
LAP LENGTH (mm) IN 400 600 700 800 900 1000 1250 designed
ENG : DR-Majid Albana
project manager
approved 4 ST/D/04
Ø16@200 H
Ø16@200 V
A B C D
W1
1
Section (D-D)
Ø16@20
D
cm C/C
4
B 0.90
0.05
W1
0.10
B 0.25
W1
0.25
5
SECTION IN RAFT FOUNDATION
BASEMENT WALL W2
W1
A
job title
(A)
drawing title
scale date
checked
approved 5 ST/D/05
Reinf. conc. Raft
foundation 40 Mpa min.
5 cm plain concrete
2layers Bitumen 1cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
25cm Sub base 95% comp.
25cm Bolder
Sub grade ( stiff & stable )
Lift
B
B
0.90
0.05
0.10
0.25
0.25
250 250
Ø12@200H
60 BAR DIA METER
Ø12@200V
500 500
1.0
Section B'-B'
no. date initials revision
job title
(A)
drawing title
5
ENG : Majid Albana
approved ST/D/06
UP
B'
A'
12 No. Ø12
0
15
6@
Ø1
0
20
2 @
دعصم 0.500
Ø1
Slab Reinf.
Ø12@150
0 Slab Reinf.
15
6@
Ø1
Ø12@200 2 00 Slab Reinf.
2@ 0
Ø1 20
@
Ø12
Ø12@200
CONCRETE COVERS
SECTION A'-A' (between slab & landing ) 200mm
-SLABS = 25 mm
-BEAMS = 40 mm
no. date initials revision
-COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
job title
-RAFT FOUNDATION = 75 mm
(A)
drawing title
Stairs detail
. all dim. from ARCH D.W.G. -THE BUILDING IS DESIGNED FOR
BASEMENT + GROUND FLOOR + 6
designed
ENG : DR-Majid Albana
checked
project manager
scale date
FLOORS + PENT-HOUSE 1-100 3/2024
drawn job no. sheet no.
approved
7 ST/D/07
A B C D
W2
1
W3 W3
C1 C1
SCHEDULE OF COLUMNS AND WALLS
COLUMNS SIZE
OR WALLS LENGTH WIDTH REMARK
C3 C3 3
ID (mm) (mm)
C2 C2
C1 900 400 just in basement
C2 1100 400
C3 900 400
W1 250 2500 lift
C3 4 W2 300 just in basement
B
C1 C1
Notes
W2
W2
B
C3 C3 5
C1 C1
A
W3 C1 C1 C1
6
W2 A
job title
(A)
drawing title
scale date
approved 8 ST/D/08
20 - Ø20 20- Ø20 20 - Ø16
Ø10@200 Ø10@200 Ø10@200
3Ties/Set 3Ties/Set 3Ties/Set
Main Bar Roof Floor
Ties
Column Reinf.
Rest See
C 50 900 1100 900
Section
400 400
400
3 rd Floor
Section
Ground Level
400 400
400
foundation
level
job title
(A)
drawing title
SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
TYPICAL INTERNAL COLUMN TO BEAM DETAIL TYPICAL EDGE COLUMN TO BEAM DETAIL checked scale date
1-100 3 /2024
drawn job no. sheet no.
8
1
f16@150 f16@150
0.4
0.4
Reinf. conc. Raft
foundation .
5 cm plain concrete
0.4
W2
2layers Bitumen 1cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
VAR.
Ø16@20
cm C/C
0.10
0.25
0.09
0.25
job title
approved
10 ST/D/10
A B C D
B2 B2 B2
1
B2
B2
Notes
B3 B3
3
Ø12@150 B. MESH Ø12@150 B. MESH
CONCRETE COVERS
B2 B3
B3 -SLABS = 25 mm
B2 3⌀16mm -BEAMS = 40 mm
-COLUMNS = 40 mm
-WALLS = 25 mm
0.20
-SLAB ON GRADE = 50 mm
-RAFT FOUNDATION = 75 mm
4
Ø12@150 B. MESH Ø12@150 B. MESH
0.50
Ø10mm @ 170mm c/c
Stirrups
B2
2⌀20mm
B2 0.20
5
B3 Detail
Ø12@150 B. MESH Ø12@150 B. MESH
B2 B2
6
Ø12@150 B. MESH Ø12@150 B. MESH
B2 B2
B1 B1
B2
job title
(A)
drawing title
scale date
approved
11 ST/D/08
1 2 3
L/3 L/3 L/3
1 2 3
Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Ø10mm @ 170mm c/c
Stirrups Stirrups
Stirrups
Beam1 - Longitudinal
Section
2⌀20mm
3⌀20mm 5⌀20mm
0.20
0.20
0.20
0.50
0.50
0.50
Ø10mm @ 170mm c/c Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Stirrups Stirrups Stirrups
1 2 3
L/3 L/3 L/3
1 2 3
Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Ø10mm @ 170mm c/c
Stirrups Stirrups
Stirrups
Beam1 - Longitudinal
Section
6⌀25mm L=9m
0.20
job title
0.50
3⌀20mm
BEAM REINFORCEMENT&SEC.
designed project manager
Notes
3
CONCRETE COVERS
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH
-BEAMS = 40 mm
-COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
-RAFT FOUNDATION = 75 mm
5 25 mm
Camber slab camber 25 mm
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@200 . MESH
ADD Ø16@200 T L=8 m
200
350
6 150
3000
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
25 mm
ADDITIONAL camber B2 25 mm
camber
Ø12@200 mm
TOP L=4m
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
TOP REINFORCEMENT BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title
Slab Reinf.
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 PLAN OF SLAB
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 REINFORCEMENT&SEC.
FOR ALL DROP PANLE BOTTOM REINFORCEMENT designed
ENG : DR-Majid Albana
project manager
4.0 approved
13 ST/D/08
A B C D
Notes
3
CONCRETE COVERS
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH
-BEAMS = 40 mm
-COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
-RAFT FOUNDATION = 75 mm
5 25 mm
Camber slab camber 25 mm
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@200 . MESH
ADD Ø16@200 T L=8 m
200
350
6 150
3000
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
25 mm
ADDITIONAL camber B2 25 mm
camber
Ø12@200 mm
TOP L=4m
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
TOP REINFORCEMENT BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title
Slab Reinf.
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 PLAN OF SLAB
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 REINFORCEMENT&SEC.
FOR ALL DROP PANLE BOTTOM REINFORCEMENT designed
ENG : DR-Majid Albana
project manager
4.0 approved
13 ST/D/08
A B C D 250
2Ø10 E.F.
Ø10/250
400
1 see slab reinf.
200
300
Ø10/200
3Ø12T&B
250
100% SUPPORTING
OLD SLAB
50% SUPPORTING
OLD SLAB
25% SUPPORTING
COLUMN COLUMN
Ø12@150
4 DETAIL FOR SLAB SUPPORTING COLUMN COLUMN
(BACK PROPPING)
5
ADD Ø20@200 T L= 2.5m
2
5
2 Ø12@150
Ø12@200 H
6 Ø12@200 V Beam
25 mm
Ø12@200 V Camber slab camber 25 mm
Ø12@200 H
PENT HOUSE
job title
BAR DIA.(mm) 10 12 16 18 20 22 25
(A)
TOP REINFORCEMENT
Slab Reinf.
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 drawing title
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 PLAN OF SLAB
SLAB THICKNESS = 200 mm REINFORCEMENT&SEC.
BOTTOM REINFORCEMENT
designed project manager
ENG : DR-Majid Albana
checked scale date
Typica SLAB reinforcement . all dim. from ARCH D.W.G. drawn
1-100
job no.
3/2024
sheet no.
approved
11 ST/D/12