Installation
Completion
Commissioning
BKR-1512a
Installation

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 2


General Information

Follow Standards

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 3


General Information

Follow Manuals

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 4


Documentation

Drawings

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 5


Documentation

Wiring Information

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 6


Documentation

Other Documents
• Detection / release system
• Pressure venting
• Room integrity

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 7


Follow Documentation

System must be installed as designed!


If modifications are necessary …
 check with the designer first before you proceed!

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 8


Safety

Never move a container without ...


• transportation cap
• anti-recoil cap
• protective caps

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 9


Safety

Never move a container without ...


• transportation cap
• anti-recoil cap
• protective caps

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 10


Safety

Do you know the valve details?


• function
• connecting ports

Never remove caps/plugs without knowing the function!

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 11


Actuation

Details provided?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 12


Actuators

Details provided?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 13


Actuators

Resetting actuators
• all actuators need manual reset!

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 14


Actuators

Resetting actuators
• electric actuator (spring loaded)

Reset Tool

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 15


Actuators

Resetting actuators
• pneumatic actuator (O-ring friction only)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 16


Actuators

Resetting actuators
• manual actuator (3 steps)
  

fired lift strike knob insert safte clip push pin back

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 17


Manifolded Systems

Details provided?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 18


Pipe Connection

Details provided?

* available from Tyco

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 19


Distribution Pipes And Fittings

Important
• Pressure rating
• Material
 cast iron and non-metallic pipes and fittings shall
not be used
• Finish
 black, galvanised, stainless steel

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 20


Distribution Pipes And Fittings

System Pressure

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 21


Distribution Pipes And Fittings

Pipes and fittings …


• must be of non-combustible material
• shall be able to withstand expected pressures and
temperatures
• pressure details see hydraulic report

Standards: pipe and fitting details


• ISO 14520-1 § 6.3
• EN 15004-1 § 6.3
• NFPA 2001 § 4.2.1

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 22


Pipe Installation

• Each pipe section shall be cleaned internally after


preparation and before assembly
• Pipe network shall be free of particulate matter and oil
residue before installation of nozzles

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 23


Pipe Installation

Before nozzles are installed ...


• blow out the whole pipe installation using compressed air
or nitrogen
• verify that flow is continuous and that the piping and
nozzles are unobstructed

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 24


Pipe Installation

Pressure test (leak test) ...


• pressurise with 3 bar
• after 10 minutes pressure drop max. 20% (min. 2,4 bar)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 25


Pipe Installation

Make installer aware of special rules


• horizontal pipes downstream a tee

Side Tee
Correct Side Tee
Incorrect

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 26


Pipe Installation

Make installer aware of special rules


• pipe section downstream a tee length = 10 x diameter

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 27


Pipe Installation

Make installer aware of special rules


• wrong installation

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 28


Pipe Installation

Make installer aware of special rules


• dirt trap (ISO 14520-1 and EN 15004-1 § 6.3.1.2)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 29


Pipe Installation

Make installer aware of special rules


• nozzle filter (VdS 2381)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 30


Pipe Installation

Pipe Hangers
• from non-combustible material
• spacing according engineering rules and standards
ISO 14520 & EN 15004 § 6.3.4:
≤25 mm pipe ≤100 mm
>25 mm pipe ≤250 mm

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 31


Pipe Installation

Pipe Hanger
• not a good idea

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 32


Nozzle Installation

Nozzle details must be given in the drawings


• orientation

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 33


Nozzle Installation

Nozzle details must be given in the drawings


• discharge pattern

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 34


Nozzle Installation

Nozzle details must be given in the drawings


• 180° nozzle

Correct Wrong

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 35


Nozzle Installation

Nozzle orientation?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 36


Nozzle Installation

Nozzle details must be given in the drawings


• pipe connection (size and thread type)
• orifice drill size (stamp at nozzle tip)

NPT or BSP

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 37


Nozzle Installation

Nozzle placement?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 38


Discharge Pressure Switch

Installation options
• pilot line

Single Container System Multiple Container System

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 39


Discharge Pressure Switch

Installation options
• distribution pipe

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 40


Warning Signs

Always required
• local language
• at all exit doors

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 41


Completion

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 42


Check System Details

As-built vs. design


• storage container(s)

=?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 43


Check System Details

As-built vs. design


• distribution system

=?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 44


Check System Details

As-built vs. design


• nozzles
• position
• orientation
• orifice size
Drill size stamped

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 45


Actual System State

Fixings / connections
• container battery

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 46


Actual System State

Fixings / connections
• pipes, nozzles

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 47


Actual System State

Container pressure

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 48


Actual System State

Container label
• correct container?

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 49


Actual System State

Warning signs

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 50


Testing

Electric actuator(s)

Reset after testing.

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 51


Testing

Pneumatic actuation line


• leakage
• function Function
?

Leakage
?

Reset after testing!

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 52


Testing

Pressure vents

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 53


Final Connection

System is operable

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 54


Commissioning

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 55


Commissioning

If ...
• system complete and checked
• system operable
• documentation ready
• commissioning schedule available

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 56


Commissioning Schedule

Example see TFPP manual

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 57


Inform Customer

'Familiarize your client with the system'


Agent
• function
• human safety
• residues (none)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 58


Inform Customer

'Familiarize your client with the system'


System actuation
• automatic (2 detector dependency)
• manual (push button)

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 59


Inform Customer

'Familiarize your client with the system'


Trouble shooting
• identify problem
• call service

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 60


Inform Customer

'Familiarize your client with the system'


Alarm
• do not panic
• leave the protected hazard

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 61


Inform Customer

'Familiarize your client with the system'


After an alarm
• do not open hazard for at least 10 minutes (hold time)
• reset alarm
• call service company
• refilling
• make system operable

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 62


Commissioning Paper

Have commissioning paper signed by customer.

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 63


Job Done

TFPP FM-200 & Sapphire Systems - Installation/Completion/Commissioning 64