Construction Health and Safety Plan evaluation for:
NR Item Y/N/? Comment
1 Index N 2 Definitions/ acronyms 3 Introduction and scope of the Health and Safety Plan 4 Client 5 Client contact details 6 Site location 7 Project description/scope of work 8 Objectives, targets and company commitment 9 Communication procedures 10 Cost of safety 11 Scope of the Health and Safety Plan 12 Occupational health and safety goals and objectives 13 SHE risk surveillance, measurements and monitoring a Discription of risk assessment b A monitoring plan and review plan c Client baseline risk assessment d Issue-based risk assessment e Continiuos risk assessment f Daily task risk assessments g Method statements and control measures h Operational permits to work i Site inspections j Project monthly audits k Principal contractors management of change weekly report m Monthly management report 14 Legal requirements and reference documents a Health and Safety Policy b Reference legislation/documents and standards c Letter of good standing d Notification of construction/permit to work e External permits, way-leaves required for project 15 Workers management a Workers medicals b Workers details, ID, next-of-kinn c Staff transport d Working Hours 16 Contractors management and responsibilities a Contractors selection b Mandatary Agreements CR 5 and CR 7 appointments c PC and Contractor supervision and appointments Assistant to CEO Temporary designer Construction manager Assistant construction managers Construction supervisors Assistant to construction supervisors Health and safety officer Traffic management safety officer SHE representatives and committee List of possible appointments Competence and training of principal contractor and d contractors employees Induction Awareness (toolbox talks) Qualification/experince/training Principal contractors activity based management plans and e procedures Site establishment, hoarding, installation of services Working at height, fall prevention/protection plan Temporary works, scaffolding, formwork and support work Excavations and trenching Working in confined spaces Hot-work, welding, flame cutting and similar operations Blasting Public safety, access control and security Cranes, Lifting, lifting equipment and lifting plan Demolition Barricading and edge protection Recording, Investigation and Reporting of Incidents (Act 24) Electrical installation work Temporary electrical installation Housekeeping, material storage and management Lockout procedures Handling, storage and removal of waste material Bulk mixing plant Traffic management plan Deliveries and storage Handling, storage of hazardous and flammable chemical substances Confined space Working in/over water environment
e Principal contractors activity based management plans and procedures(Continued)
Environmental protection Dust suppression Spill prevention Waste management Working in inclement weather Ergonomic hasards f Emergency management Emergency numbers Project/site specific emergency plan requirements Evacuation First aid management Fire and explosion precautions and equipment g Plant, machinery, equipment and tools h Personal Protective Equipment and Clothing i Health and safety signage j Intoxication k Construction employees facilities Toilets Potable water Washing facilities Protected eating facilities 17 SHE Plan update 18 Minimum administrative requirements (Safety file content) 19 General comment
Auditor Pieter Herbst Signature: Date:
Definitions Introduction Scope of work Scope of these specification Site information and constraints Legal requirements and reference documents Sanral reference documents and standards Letter of good standing permit to work application external permits required for projet review of she performance Risk assessment A monitoring plan and review plan Project risk assessments Baseline risk assessment Issue-based risk assessment Continuous risk assement Daily task risk assessments Method statements and control measures Operational permits to work Inspections Monthly audits Principal contractors management of change weekly report Monthly management report Site management, supervision, appointments and responsibilities Project participants and relationships List of participants Appointments and responsibilities Sanral responsibilities Sanral appointed agent responsibilities Sanral appointed designer of structure responsibilities Principal contractor shall appoint construction manager assistant construction managers construction supervisors assistant to construction supervisors Health and safety manager and officer Traffic management safety officer List of possible appointments Responsibilities of principal contractor competence and training Induction Awareness (toolbox talks) Competence of principal contractor and contractors employees Cost of health and safety Health and safety representatives and safety committees Principal contractors she management plans and procedures Site establishment, hoarding, installation of services Health and safety plan Lifting and lifting equipment and lifting plan Demolition Public safety, access control and security Traffic management plan Barricading and edge protection Working at height fall prevention/protection plan Environmental protection and waste management Temporary works, scaffolding, formwork and support work Excavations Confined space Hot-work, welding, flame cutting and similar operations Blasting Working time Emergency manageement Project/site specific emergency plan requirements Fire and explosion precautions First aid management Incident management and recording and recording and investigtion ofincidents Temporary electrical installation Stacking & storage Personal protective clothing adequipent Health and safety signage Plant, machinery and equipment Construction employees facilitie Housekeeping Handling and storage of hazardous and flammable chemical substances Intoxication Minimum administrative requirements INDEX Introduction Site location Project description Scope and aim of the Health and Safety Plan Occupational health and safety goals and objectives SHE surveillance, measurements and monitoring Compliance and other requirements Health and Safety Policy Legal reference Cost of safety Mandatary Agreements Site management & Supervision Structure and responsibilities Empyreal construction appointments Workers management Workers medicals Workers details Contractors Management Contractors selection Appointments Responsibilities SHE Plan approval Proof of good standing and notification of change of contractor Competence, training and duty to inform Traffic accommodation Staff transport Material storage and management Deliveries and storage Handling, storage and removal of waste material Stacking and storage Structure Bulk mixing tanks Public Safety Site security and access control SHE monitoring Inspections Risk Assessments Safe work procedures Audits Non-conformance management and reports Stop work notice Working at height Fall Prevention Plan Working in confined spaces Working in water environment Scaffolding Temporary works Demolition Works Working Hours Personal Protective Equipment and Clothing Signage Recording, Investigation and Reporting of Incidents (Act 24) Health and Safety Representatives and safety Committee Excavations and trenching Emergency Procedures Emergency numbers and procedures Electrical installation First aid Fire Precaution Evacuation Site hygiene facilitates Toilets Potable water Solid waste Liquid waste Hazardous waste Washing facilities Management hazardous chemicals Management of flammable liquids Plant, machinery, power and hand tools Cranes, lifting equipment and activities Environmental protection Dust suppression Spill prevention Waste management SHE Plan update Safety file content