Weekly Schedule for DOCUMENT SUBMISSION
Weekly Project xxxxxxxxxxxxx
Name of Contractor yyyyyyyyyyyyy
Package LMS-16
Date from 20-Mar., 2020 to 4- Apr., 2020
Document
Date Structure name Location
Work item Description Type of file
Mar-29 (Mon) Intake 00+120 to 00+180 Construction Re-bar arrangement Working drawing
Main canal 10+100 to 12+200 Joint survey Survey data Excel sheet
Drawing
Main canal 10+100 to 12+200 Construction Earth works Working drawing
Mar-31 (Wed) Borrow area As per attached Boundary survey Plan Working drawing
Soil test Laboratory density test
Apr-01 (Thurs) Secondary canal 1+700 to 2+250 Lining Structural details Working drawing
Apr-02 (Fri)
Apr-03 (Sat)
Apr-04 (Sun)
Serial No.
Weekly Schedule for FIELD WORKS
Weekly Project xxxxxxxxxxxxx
Name of Contractor yyyyyyyyyyyyy
Package LMS-16
Date from 20-Mar., 2020 to 4- Apr., 2020
Apr-03 (Sat) Construction Intake side wall (00+100 to 00+1 Re-Bar arrangement
Form