Professional Documents
Culture Documents
Integrated Land Use Transport Planning Singapore Lta
Integrated Land Use Transport Planning Singapore Lta
Integrated Land Use Transport Planning Singapore Lta
2.7mil
MRT/LRT trips
25 km
3.4mil
49 km Bus trips
1.0mil
CBD Taxi trips
High-density
housing 2.6mil
Active Mobility
2
Copyright©LTA Singapore 2020
Land transport master plan
From supply-driven to aspirational outcomes
20-Min Towns; 45-Min City
• Rail connectivity
• Integrated hubs and regional
centres
• Transit priority corridors
Transport for All
• Gracious and caring commuting
culture
• Barrier-free journeys
3
Copyright©LTA Singapore 2020
Integrated land-use & transport planning
A consistent strategy applied since independence in 1965
Concept Plan1991
Medium term plans
Master Plan 10-15 years
5 Year Road
Rail Lines and
Development
Bus Network
Programme
4
Copyright©LTA Singapore 2020
Judicious land developments
Work with markets to deliver outcomes
Private
Sector Land
Land assembly Land release Use Urban
Objectives Redevelopment
Authority
(URA)
•Land acquisition •Government Land Sale
(GLS) programme
•Resettlement Outcomes
•Supply (quantum and
site selection) timing
•Compensation Land Land
•Direct allocation at Transport Yield
market valuation Objectives Objectives
•Land alienations,
amalgamation and
•Development control Land Transport Singapore Land
re-parcellation and building plan Authority Authority
(LTA) (SLA)
approvals
Food
Punggol Digital
District
Jurong Lake
District
Construction
7
Copyright©LTA Singapore 2020
#3: Reduce reliance on private transport
A suite of “push” measures (ownership and usage)
8
Copyright©LTA Singapore 2020
#4: Targetted congestion charging
Harnessing technology and data to shape demands
Expressways
45 km/h 65 km/h
20 km/h 30 km/h
Other Roads
9
Copyright©LTA Singapore 2020
#5: Recent green movements
Calibrated interventions and “nudges” to go car-lite
Electric car sharing
Private hire
Electric Taxi
Electric and
Hybrid Buses
10
Copyright©LTA Singapore 2020
Once over lightly
▪ Vision and long term
planning
▪ Interventions to get
outcomes
• Integration
• System-wide
• Push-and-pull
• Technology/data
• Behavioural nudges
11
Copyright©LTA Singapore 2020
Thank You
E-mail: looi_teik_soon@lta.gov.sg
LTAsingapore
12
Copyright©LTA Singapore 2020