Draft Matrix Salary Position Non Staff PT. KBL 2021 1

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

3,660

Matrix Salary PT. Karya Bhumi Lestari Project KJA

UMSK 3,026,200 Tahun 2020 UMK 3,050,000 Tahun 2021 LEVEL POSITION MATRIX - NON STAFF

Non-Staff Rate Selisih Kenaikan Non-Staff Rate LEVEL I/1 LEVEL I/2 LEVEL I/3 LEVEL I/4 LEVEL I/5 LEVEL I/6 LEVEL I/7 LEVEL I/8 LEVEL I/9

Band Level Min Mid Max Rate Min 2020 - 2021 Band Level Min Mid Max Workshop Helper Serviceman 3 Mechanic 3 Serviceman 2 Mechanic 2 Serviceman 1 Mechanic 1 Painter & Body Repair Specialist Mechanic Specialist
1 3,026,200 3,029,831 3,031,647 Rp 23,800.00 1 3,050,000 3,053,660 3,055,490 Officeboy Tool Keeper Auto Electric 3 Tyreman 2 Auto Electric 2 Tyreman 1 Auto Electric 1 Excavator ≥ 250T Auto Electric Specialist
2 3,032,858 3,034,068 3,035,279 Rp 23,852.36 2 3,056,710 3,057,930 3,059,150 Track Cleaner Driver LV Fab Welder 3 Painter & Body Repair 2 Fab Welder 2 Painter & Body Repair 1 Fab Welder 1 Fabrication Specialist
3 3,036,515 3,038,305 3,040,726 Rp 23,881.12 3 3,060,396 3,062,200 3,064,640 Washman Tyreman 3 Painter & Body Repair 3 Machinist 2 Fab Fitter 2 Machinist 1 Fab Fitter 1 Inspector
4 3,043,147 3,047,989 3,062,514 Rp 23,933.28 4 3,067,080 3,071,960 3,086,600 Trainee Operator Carpenter 3 Machinist 3 Service Truck Operator Lifting Equipment Opr 2 Operator 3 Lifting Equipment Opr 1 Operator Specialist
I 5 3,072,126 3,083,698 3,092,776 Rp 24,161.19 I 5 3,096,287 3,107,950 3,117,100 Washman Plumber 3 Maintenance Clerk Fuel Truck Operator Operator 4 Excavator ≥ 120T Operator 2 Shovel
6 3,112,749 3,132,117 3,153,300 Rp 24,480.68 6 3,137,230 3,156,750 3,178,100 Chainman Checker Maintenance Dispatcher Water truck Operator Excavator < 120T Dump Truck ≥ 240T Excavator ≥ 200T Operator Trainer
7 3,177,542 3,213,219 3,235,008 Rp 24,990.25 7 3,202,532 3,238,490 3,260,450 Helper Chainsawman Trainee ( 2 Year ) Rigger Dump Truck ≥ 100T Dozer D9/D275 Dozer D10/D375/D11/D475 Lead Hand - Camp Maintenance
8 3,256,191 3,298,255 3,319,741 Rp 25,608.80 8 3,281,800 3,324,195 3,345,850 Security CM Technician Lifting Equipment Opr 3 Dozer D7/D85/D8/D155 Grader 24H Loader CAT966/980 Lead Hand - Civil
9 3,519,718 3,616,309 3,767,619 Rp 27,681.34 9 3,547,399 3,644,750 3,797,250 Signmaker Operator 6 Operator 5 Grader 14H-16H/14-16M/825 Loader CAT966/980 Training clerk 1 Lead Hand - Electrician
Pumpman Dump Truck < 60T Dump Truck ≥ 60T Backhoe Loader Driller Production Clerk 1
Berdasarkan Surat Keputusan Gubernur Kalimantan Timur dengan nomor surat 560/K.603/2020, tentang Pelaksanaan Upah Minimum untuk Timekeeper Water Truck, Manhaul (Light Truck) Water Truck > 60T Lowboy Carpenter 1 Engeneering Clerk 1
daerah yaitu Kabupaten Paser.
Articulated Dump Truck (AT) 740 Compactor Blade Wheel Dozer Plumber 1 SHE Clerk 1
Articulated Dump Truck (AT) A35 Carpenter 2 Training clerk 2 Accounting Clerk 1
Compactor Roller Plumber 2 Production Clerk 2 Payroll Clerk 1
Matrix Salary PT. Karya Bhumi Lestari Project TBG & Kab Kutai Kertanegara Training clerk 3 Engeneering Clerk 2 Administration Clerk 1
Production Clerk 3 SHE Clerk 2 Assistant Survey 1
UMSK 3,180,180 Tahun 2020 UMK 3,180,180 Tahun 2021 Engeneering Clerk 3 Accounting Clerk 2 Electrician 1
Non-Staff Rate Selisih Kenaikan Non-Staff Rate SHE Clerk 3 Payroll Clerk 2 Safetyman 1
Band Level min mid max Rate Min 2020 - 2021 Band Level Min Mid Max Accounting Clerk 3 Administration Clerk 2 Safety Patrol
1 3,180,180 3,183,996 3,185,904 Rp - 1 3,180,180 3,183,996 3,185,904 Payroll Clerk 3 Assistant Survey 2
2 3,187,176 3,188,448 3,189,721 Rp - 2 3,187,176 3,188,448 3,189,721 Administration Clerk 3 Electrician 2
3 3,191,020 3,192,901 3,195,445 Rp - 3 3,191,020 3,192,901 3,195,445 Assistant Survey 3 Safetyman 2
4 3,197,989 3,203,077 3,218,342 Rp - 4 3,197,989 3,203,077 3,218,342 Electrician 3
I 5 3,228,443 3,240,603 3,250,144 Rp - I 5 3,228,443 3,240,603 3,250,144 Safetyman 3
6 3,271,133 3,291,486 3,313,748 Rp - 6 3,271,133 3,291,486 3,313,748
7 3,339,223 3,376,715 3,399,612 Rp - 7 3,339,223 3,376,715 3,399,612
8 3,421,874 3,466,078 3,488,657 Rp - 8 3,421,874 3,466,078 3,488,657
9 3,698,809 3,800,315 3,959,324 Rp - 9 3,698,809 3,800,315 3,959,324 Operator 5 - Articulated 45T

Berdasarkan Surat Keputusan Gubernur Kalimantan Timur dengan nomor surat 560/K.619/2020, tentang Pelaksanaan Upah Minimum untuk
daerah yaitu Kabupaten Kutai Kertanegara.

Matrix Salary PT. Karya Bhumi Lestari KCF Balikpapan

UMSK 3,069,316 Tahun 2020 UMK 3,069,316 Tahun 2021


Non-Staff Rate Selisih Kenaikan Non-Staff Rate
Band Level Min Mid Max Rate Min 2020 - 2021 Band Level Min Mid Max
1 3,069,316 3,072,999 3,074,841 Rp - 1 3,069,316 3,072,999 3,074,841
2 3,076,068 3,077,296 3,078,524 Rp - 2 3,076,068 3,077,296 3,078,524
3 3,079,778 3,081,593 3,084,049 Rp - 3 3,079,778 3,081,593 3,084,049
4 3,086,504 3,091,415 3,106,148 Rp - 4 3,086,504 3,091,415 3,106,148
I 5 3,115,896 3,127,633 3,136,841 Rp - I 5 3,115,896 3,127,633 3,136,841
6 3,157,098 3,176,742 3,198,227 Rp - 6 3,157,098 3,176,742 3,198,227
7 3,222,814 3,259,000 3,281,099 Rp - 7 3,222,814 3,259,000 3,281,099
8 3,302,584 3,345,248 3,367,040 Rp - 8 3,302,584 3,345,248 3,367,040
9 3,569,865 3,667,833 3,821,298 Rp - 9 3,569,865 3,667,833 3,821,298

Berdasarkan Surat Keputusan Gubernur Kalimantan Timur dengan nomor surat 560/K.604/2020, tentang Pelaksanaan Upah Minimum untuk
daerah yaitu Kota Balikpapan.

You might also like