RAIN CII CARBON(VIZAG)LIMITED,SEZ UNIT

Number of
S.NO Department Building Staircase Remarks
1 Admin(HR) Admin Building 2
2 Admin(HR) OHC 2
3 Admin(HR) Canteen 2
4 Store Engineering store 2
5 Store Heavy Equipment 2
6 Store Oil &Chemical store 2
7 SH&E Fire pump House 2
8 QC Lab(Cal-process) QC lab 2
9 Cal -process Gas station 2
10 Cogen-process ASP Building 2
11 Cogen-process ASP Godown 1
12 Cogen-process DM Plant 1 Required stair case
13 Cogen-process DM Plant pannel Room 1
14 Cogen-process ACC Plant 1
15 Cogen-process TG Building ground floor 2
16 Cogen-process TG Building 1st floor Required stair case
17 Cal process/Cogen CCR Ground floor 2
18 Cal process/Cogen CCR Ground 1st floor 2
19 Cal process/Cogen CCR 2nd floor 2
20 Electrical 132 Kv Yard 2
21 Electrical Switch Gear-3&5 2
22 Electrical Switch Gear-04 1
23 Electrical Switch Gear-01 2
24 Electrical Switch Gear-02 1
25 Cal process PCW Pump House 1
26 Cal process/Cogen I O Room 2
27 Cal process SILO'S(Ground floor) 2
28 Cal process TT-06 1
29 Cal process TT-03 1
30 Cal process Day Bin 2
31 Cal process CPC Loanding point 1
32 Cal process Covershed-01 1
33 Cal process Covershed-02 2
34 Cal process Covershed-03 1
35 Cal process Weight Bridge-01 1
36 Cal process Weight Bridge-02 1
37 (Note):There are Entry and Exit Staircase in all the VSK From 1 TO 6