1) INTRODUCTION IN HVAC SYSTEM(PLAN, 17) (VEN)BATTERY ROOM VENTILATION SYSTEM AS
SCHEMATIC, EQUIPMENT SCHEDULE) PER UAE FIRE LIFE SAFETY CODE 2) ARCHITECTURAL PACKAGE 18) (VEN)KITCHEN VENTILATION SYSTEM AS PER 3) DESIGN BASIS REPORT & HVAC ROOM DATA SHEET DW172 4) CODES & STANDARDS 19) (AC+VEN) DUCT HEATER SIZING SELECTION 5) (AC)HAP HEAT LOAD CALCULATIONS FOR FCU AND AHU(COOLING) AS PER UAE GREEN BUILDING 20) (AC)DUCT SIZING SELECTION REGULATIONS 21) (CHWS)CHILLER CALCULATION(AIR COOLED & 6) (AC+VEN)FRESH AIR CALCULATION FOR FAHU, ERV WATER COOLED) AND FANS UNIT AS PER ASHRAE STANDARD 22) (CHWS)COOLING TOWER CALCULATION AND 7) (AC)AC EQUIPMENT CALCULATION FOR SERVER SELECTION ROOM 23) (CHWS)CHILLED WATER PUMP CALCULATION 8) (VEN+SM)CAR PARK VENTILATION SYSTEM AS PER 24) (CHWS)CHEMICAL DOSING UNIT SELECTION UAE FIRE LIFE SAFETY CODE/ASHRAE STANDARD 25) (CHWS)PRESSURISATION UNIT & AIR DIRT 9) (SM)CORRIDOR SMOKE MANAGEMENT SYSTEM AS SEPARATOR PER UAE FIRE LIFE SAFETY CODE 26) (CHWS)CHILLED WATER PIPING SIZING SELECTION 10) (SM)STAIRCASE AND LIFT PRESSURISATION 27) HVAC EQUIPMENT AND ACCESSORIES SELECTION SYSTEM AS PER UAE FIRE LIFE SAFETY CODE AND SCHEDULE /NFPA/ ASHRAE 28) CONCEPT DESIGN, SCHEMATIC DESIGN, DETAILED 11) (SM) SMOKE VENTILATION FOR ROOMS WITH DESIGN, TENDER PACKAGE & IFC PACKAGE HAZARDOUS & FLAMMABLE MATERIALS AS PER 29) CLIENT APPROVAL UAE FIRE LIFE SAFETY CODE/NFPA 30) VALUE ENGINEERING 12) (SM) SMOKE VENTILATION FOR FIRE PUMP ROOMS, 31) AUTHORITY APPROVALS GENERATOR, AND FIRE COMMAND CENTER AS PER UAE FIRE LIFE SAFETY CODE/NFPA 13) (SM) SMOKE VENTILATION FOR THE WAREHOUSE AS PER UAE FIRE LIFE SAFETY CODE/NFPA 14) (VEN+SM)COLD SMOKE EXHAUST SYSTEMS FOR CLEAN AGENT ROOMS AS PER UAE REGULATIONS 15) (VEN)GENERATOR VENTILATION SYSTEM AS PER THE MANUFACTURER 16) (VEN)TRANSFORMER VENTILATION SYSTEM AS PER UAE ELECTRICITY AUTHORITY REGULATIONS PLUMBING DESIGN CALCULATIONS TRAINING CLASSES WATER SUPPLY SYSTEM DRAINAGE SYSTEM 1) INTRODUCTION IN WATER SYSTEM(PLAN, 1) INTRODUCTION IN PLUMBING SYSTEM(PLAN, SCHEMATIC, EQUIPMENT SCHEDULE) SCHEMATIC, EQUIPMENT SCHEDULE) 2) ARCHITECTURAL PACKAGE 2) ARCHITECTURAL PACKAGE 3) DESIGN BASIS REPORT 3) DESIGN BASIS REPORT 4) CODES & STANDARDS ASPE/IPC 4) CODES & STANDARDS 5) SOURCES OF WATER 5) SOURCES OF DRAIN 6) VARIOUS PLUMBING FIXTURES 6) VARIOUS PLUMBING FIXTURES 7) WATER SUPPLY FIXTURE UNITS(WSFU) 7) DRAINAGE FIXTURE UNITS(DFU) CALCULATION CALCULATION 8) DRAINAGE FLOW RATE CALCULATION 8) WATER FLOW RATE CALCULATION 9) DRAINAGE PIPE SIZING 10) RAINWATER CALCULATION 9) WATER PIPE SIZING 11) MANHOLE SIZING a. Hazen-Williams b. Darcy-Weisbach Formula 12) CONDENSATE DRAIN CALCULATION 10. WATER HAMMER ARRESTER SELECTION 13) GREY WATER SYSTEM 11. WATER DEMAND CALCULATION(PEOPLE/FIXTURE 14) BLACK WATER SYSTEM /LEED METHOD) 15) SEPTIC TANK CALCULATION 12. WATER TANK SIZING 16) SUMP PUMP CALCULATION 13. TYPE OF PUMPS 17) DRAINAGE EQUIPMENT AND ACCESSORIES a. BOOSTER PUMP WITH PRESSURE VESSEL SELECTION AND SCHEDULE b. TRANSFER PUMP 18) CONCEPT DESIGN, SCHEMATIC DESIGN, DETAILED c. CIRCULATION PUMP DESIGN, TENDER PACKAGE & IFC PACKAGE d. HOT WATER CIRCULATION PUMP 19) CLIENT APPROVAL 14. HOT WATER CALCULATION AS PER ASHRAE 20) VALUE ENGINEERING a. ELECTRIC WATER HEATER(INDIVIDUAL) 21) AUTHORITY APPROVALS b. ELECTRIC WATER HEATER(CENTRALISED) c. GAS WATER HEATER(CENTRALISED) d. SOLAR WATER HEATER(CENTRALISED) e. BOILER WATER HEATER(CENTRALISED) 15. WATER EQUIPMENT AND ACCESSORIES SELECTION AND SCHEDULE 16) CONCEPT DESIGN, SCHEMATIC DESIGN, DETAILED DESIGN, TENDER PACKAGE & IFC PACKAGE 17) CLIENT APPROVAL 18) VALUE ENGINEERING 19) AUTHORITY APPROVALS FIRE SYSTEM DESIGN CALCULATIONS TRAINING CLASSES 1) INTRODUCTION IN FIRE SYSTEM(PLAN, SCHEMATIC, EQUIPMENT SCHEDULE) 2) ARCHITECTURAL PACKAGE 3) DESIGN BASIS REPORT & ROOM DATA SHEET 4) CODES & STANDARDS 5) THEORY OF FIRE 6) BASICS OF FIRE ALARM 7) PORTABLE FIRE EXTINGUISHER SELECTION AS PER NFPA10 8) AUTOMATIC SPRINKLER SYSTEM DESIGN AS PER NFPA13 a. Wet Pipe System b. Dry Pipe System c. Deluge Valve System d. Preaction System e. Foam System 8) STANDPIPE AND FIRE HOSE REEL AS PER NFPA14 9) FIRE PUMP AS PER NFPA20 10) FIRE WATER TANKS AS PER NFPA 22 11) FIRE HYDRANTS AS PER NFPA 24 12) HYDRAULIC CALCULATION – MANUAL AND SOFTWARE 13) CLEAN AGENT SYSTEMS AS PER NFPA2001 a. FM-200 b. NOVEC 14) WATER MIST SYSTEMS, 15) FIRE EQUIPMENT SCHEDULE 1) CONCEPT DESIGN, SCHEMATIC DESIGN, DETAILED DESIGN, TENDER PACKAGE & IFC PACKAGE 14) CLIENT APPROVAL 15) VALUE ENGINEERING 16) AUTHORITY APPROVALS