Professional Documents
Culture Documents
Evo HTML To PDF
Evo HTML To PDF
Evo HTML To PDF
This document is a Volvo Special Characteristic Agreement Form collecting identified special characteristics for a part and linking them to the control plan and process failure mode and effe… Full description
Save 0% 0% Embed Share Print
Volvo - Special Characteristic Agreement Form, SCA (V1b) (Previously called Supplement K). Date [YYYY-MM-DD]
The original copy of this document shall remain at the supplier's location while the part is active plus one year including electronical approval documents
Note:
This document collects identified Special Characteristics and their traceability to the Control Plan. The suppliers
product and process development process shall meet all Production Part Approval Process
Part Name: [Part Name] PD Key Contact / Phone: (PPAP) Manual 4th edition Requirements, including Ford Specific Requirements.
Lead Part Number: [Part Number] Part Folder - ID/Issue: Concurrance Stage 1
ISSUE
Supplier Name / Plant: [Supplier Name] / [Plant] PFMEA - ID / Issue: PD Engineer, Name / Date
Supplier Mfg Code: [Mfg code] Control Plan - ID / Issue: STA Engineer, Name / Date
[Program ID] [Part Name] - Issue[v1] - [YYYY-MM-DD] <= This field to be referenced in concurrance mail
Stage 1. Record of Important Characteristics and DFMEA Linkage / Cascade to PFMEA & Control Plan. Issue (stage1) [v1] Stage 2. Results collected from Prototype through to Phase 2 PPAP.
Specification ▼ Special CC /
. Added to
o Characteristic DFMEA PFMEA PTC Characteristic Process Control / Control P lan Frequency PTC's
N & on Class Class
PTC
Resp linked to Sub
Control Operation Machine
Of Checks Error
GR&R Mean Std Dev. Ppk Pp Process action plan Who? Due Date
Description Plan?
Tolerance Drwg? supplier? proofed?
7
EVO PDF Tools Demo
8
10
11
12
[Program ID] [Part Name] - Issue[v1] - [YYYY-MM-DD] <= This field to be referenced in concurrance mail
Stage 1. Record of Important Characteristics and DFMEA Linkage / Cascade to PFMEA & Control Plan. Issue (stage1) [v1] Stage 2. Results collected from Prototype through to Phase 2 PPAP.
Specification ▼ Special CC /
. Added to
o Characteristic DFMEA PFMEA PTC Characteristic Process Control / Control Plan Frequency PTC's
N & on Class Class
PTC
Resp linked to Sub
Control Operation Machine
Of Checks Error
GR&R Mean Std Dev. Ppk Pp Process action plan Who? Due Date
Description Plan?
Tolerance Drwg? supplier? proofed?
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
The original copy of this document shall remain at the supplier's location while the part is active plus one year including electronical approval documents
General note: Wherever possible irrespective of Characteristic type it is always better to apply a Poka Yoke to the process input to prevent a scrap part being generated.
Author: cwhite14
issue 1.
About
About Scribd
SlideShare
Press
Contact us
Invite friends
Support
Help / FAQ
Accessibility
Purchase help
AdChoices
Legal
Terms
Privacy
Copyright
Pinterest
Get our free apps
Documents