David Mukhembi Simiyu Print

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ELEVATION 03 A B C D 5 4 3 2 1 NOTES

A B C D TO SEPTIC TANK 3.200 3.800 3.200 2.600 1.400 3.300 2.100 1.All dimensions are in millimetres unless otherwise

X
specified.
10.200 2.All dimensions should be checked on site and any
0.850 1.500 0.850 1.150 1.500 1.150 0.850 1.500 0.850 discrepancies should be reported to the architect.
3.All works to be carried out in accordance with
the local authorities regulations.
IC IC IC 4.Use figured dimensions only do not scale from the
drawing.
PV PV PV 5.Walls below 200mm thick to be reinforced with
5 5 hoop iron at every alternative course.
6.DPC to be laid under walls and to be minimum
150 mm above finished ground level.

2.600
7.All drainage pipes passing under building and
2.600

driveway to be encased in 150mm thick concrete


KITCHEN DINING BEDROOM II sorround.
8.All inspection chambers in driveway to have
heavyduty covers.

0.400
9.All reinforced concrete works to be in accordance

4 IC 4
with structural engineers details.
IC 10.1000 gauge polythene (damp proof membrane)
and anti-termite treatment to be provided under
1.400

ground floor concrete slab.

0.600
PV
SHW SHW PV

3 3
ELEVATION 02

ELEVATION 04
0.400
9.400

MASTER KEY OF FIRE SYMBOLS


BEDROOM BEDROOM III
3.300

SITTING ROOM A B C D 5 4 3 2 1

3.300
9L water fire extinguisher

5kg carbondioxide fire extinguisher

WM Water meter
01 ELEVATION 01 1:60 02 ELEVATION 02 1:60
2 PV PV PV PV
2 FACP Fire Alarm Control Panel

8" Dia Fire alarm bell


2.100

2.100
PV VERANDAH PV D C B A 1 2 3 4 5 S/H
3.200 3.800 3.200 2.100 3.300 1.400 2.600 Smoke detectors / Heat detectors

BG BG Break glass
1 1
PV

0.300
0.850 1.500 0.850 0.900 0.500 1.500 0.600 0.850 1.500 0.850

3.200 3.800 3.200 




A B C D 
X



ELEVATION 01 


0. FLOOR PLAN 1:60 EMAIL:

ELEVATION 03 


F - FLOOR S - SKIRTING
F S 
W C
W - WALL C - CEILING
FLOOR
A - CERAMIC TILES

SKIRTING
D C B A 1 2 3 4 5 A -100 x25mm CERAMIC TILES

WALL
03 ELEVATION 03 1:60 04 ELEVATION 04 1:60
A - PLASTER & PAINT
B - 2100mm CERAMIC TILES

CEILING
5 4 3 2 1
A - CHIPBOARD PAINTED
2.600 1.400 3.300 2.100 ROOF NOTES
Roof slope= 30 Degrees, Decra roofing tiles
Project
to architect's approval on T& G ceiling borads
on 75x50mm scrappec purlin at equal c/c PROPOSED THREE
ELEVATION 02

ELEVATION 04

BEDROOM BUNGALOW ON

3,600×1,500
1,900×1,500
according to sheet length, on

1,500×1,500
1,500×2,100
W x H SIZE
900×2,100
LR NO.

600×600
75x150mm scrapped rafters at 1800mm
2.304
2.304

C/C with 25mm hoop iron strips.

OPENINGS SCHEDULE
589
100x50mm collar pieces, ties, braces
and tie beams. 100x50mm wall plate. Title
225x25mm fascia and verge boards. working drawings
300mm RC lintel

QNTY
2100x900mm high flash door
3.000
3.000

Client:
to architect's details

Triple Window with M... 6


Single-Hung Window ... 2
7
1

1
1
1200mm high Aluminium window DAVID MUSEMBI SIMIYU
FOUNDATION NOTES P.O BOX.....
15Omm thick RC slab on 500 Gauge DPM KIMAETI.

Double Door 22
0.900

on 50mm thick murram blinding on 150mm


1.100

hardcore compacted to s/e details

Window 22
Window 22
0.200

Scale
A96 BRC mesh

Door 22
As Shown

NAMAE
0.600
Depth to be determined on site.
ELEVATION 01
5 4 3 2 1 Date Friday, 3 March 2023

Drawn By: MICHAEL MWANZA, GIET(K)


0728909529
1. ROOF PLAN 1:60 X BUILDING SECTION 1:55
ALL OPENINGS SCHEDULE
GSPublisherVersion 0.40.100.100

You might also like