Khalidiya (Zakhir) Area and relocation of existing Substations at Different Areas in Al Ain.
Trial pit report for the cable route New Khalidiya PU SS to New Zakhir Grid Station (Span-04)
1
Supply & Installation of 33/11 kV Package Unit Primary Substations Including Power Cables at
Khalidiya (Zakhir) Area and relocation of existing Substations at Different Areas in Al Ain.
Trial pit report for the cable route New Khalidiya PU SS to New Zakhir Grid Station (Span-04)
2
Supply & Installation of 33/11 kV Package Unit Primary Substations Including Power Cables at
Khalidiya (Zakhir) Area and relocation of existing Substations at Different Areas in Al Ain.
Trial pit report for the cable route New Khalidiya PU SS to New Zakhir Grid Station (Span-04)