PARAPET WALL
North Elevation
IC IC 200mm thick by 500mm high machine cut
Plaster finish below window level. Stacked stone finish below window level.
11.090 external wall on 1:3 cement/sand
IC 0.150 0.200 IC Plaster finish on parts of walls. Plaster finish on parts of walls.
pv mortar,horizontal pointed square
0.200 4.000 0.200 1.000 0.950 1.000 0.200 2.990 0.200 SP
Running bond blocks on walls. joints,bitunminous feld and 25mm hoop
Running bond blocks on walls.
IC 1.350 2.850 0.200 1.500 2.000 1.600 1.590 iron for walls less 100mm thick.
IC Approved tyrolene finish under external
step
window cills.
S-05
1.000
step
BACK FIRST FLOOR SLAB
step
PORCH
pv
(non-slip ceramic tiles f.f)
150mm thick rc slab
4
15
pv
0.200
SEdetails
pv pv pv
14
pv pv pv
500mm wide by 1800mm 16
high wall mounted
wardrobe COMMON
13 IC
IC IC pv WALLS
5.078
pv
17
BATH 12
200mm thick machine cut external wall on
(non-slip ceramic tiles
3.300
18 f.f)
11
STORE pv LOBBY
pv 1:3 cement/sand mortar,horizontal pointed
19
(non-slip ceramic tiles
10 f.f) (ceramic tiles f.f)
DOWN
BED ROOM 01 (ceramic tiles f.f)
pv
9
square joints,bitunminous feld and 25mm
18G x 0.284
19R x 0.158
0.200
IC
4.000 0.200
8
STAIR WELL hoop iron for walls less 100mm thick.
5.800
7
6 1800mm high
(non-slip ceramic tiles f.f)
LOBBY
wall mounted
window cills.
(ceramic tiles f.f)
5 wardrobe
pv
pv
4
pv Steel casement windows to NOTES
2.300 0.200
pv pv pv pv pv
RG
IC
East Elevation
3
2pv
pv pv pv schedule and detail.
OFFICE 0.200
1
4.190 0.200 LOBBY
pv
UP COMMON
pv (ceramic tiles f.f)
pv GROUND FLOOR SLAB 1. This drawing is protected under the copyright
2.122
BATH
West Elevation
12.800
(non-slip ceramic tiles
pv pv
0.200
empyt door opening
FOUNDATION NOTES:
S-05
1.500
1800mm high wall
mounted shelves pv 25mm cement screed on to Architect before any work commences.
150mm thick rc foor slab on
1.500
3.900
3.900
latest K.B.S. standard codes of practice.
East Elevation 1:100 North Elevation 1:100 fumigated with anti-termite treatment
DINING ROOM
on solid rock bottom to SE details
(ceramic tiles f.f)
0.800
2.700
(hardwood parquet f.f)
be provided above all doors & windows except
5.200 pv
S-05 Building Section 1:100 doors to WC's.
0.200
350mm wide by 1800mm high
Fieldstone finish on balcony walls. Fieldstone finish on balcony walls.
pv
wall mounted shelves
5. All walls less 200mm thick to be reinforced
Plaster finish below window level. Plaster finish below window level. with hoop iron at every course.
2
2.700
Plaster finish on parts of walls. Plaster finish on parts of walls. 6. D.P.C. denotes one layer of bituminous felt and
0.200 5.490 0.200 1.500
1.200
pv pv
VERRANDAH should be provided under all external walls.
Running bond blocks on walls.
step
0.200
step step
1.300
pv
PARAPET WALL
4.500
East Elevation
0.200
pv
BUILDING HEIGHT
Approved tyrolene finish under external
2.400
window cills.
AXIS ARCHITECTS
0.200
1,300
West Elevation
1.200
1.500
11.800
pv
SH
CORRIDOR
6.200
f.f) pv
1.800
MASTER pv pv WALLS
6m Road
MASTER
2.850
pv
(ceramic tiles f.f) BED ROOM WC
0.200
0.200 5.000
7,450
3.790 0.200
1st FLOOR LEVEL
NGUMAMAS PLACE
Approved tyrolene finish under external
1st BEAM LEVEL window cills.
350mm wide by
1.500
4.400
500
mounted shelves
Steel casement windows to
BED ROOM 03 schedule and detail.
(ceramic tiles f.f)
2
pv
2,500
OFFICE
2.350
pv
0.200
LOBBY
pv (ceramic tiles f.f)
pv (hardwood parquet f.f)
GROUND FLOOR SLAB
1.300
1.550
pv BALCONY
(ceramic tiles f.f)
KITCHEN
(non-slip ceramic tiles f.f) 150mm thick rc slab
with BRC A142 to
Job Title:
GROUND LEVEL SEdetails
1
0.200
GROUND LEVEL
150
RG
0.200 3.790 0.200 1.500 0.200 5.000 0.200 consolidated hardcore filling Proposed Site
11.090 fumigated with anti-termite treatment 5948 CLIENT:PAUL OMONDI OYUECH
A B C D on solid rock bottom to SE details
South Elevation I.D NO:.14473384
L.R NO:LOITOKITOK/ENKARIAK
1. Story 1:100 S-04 Building Section 1:100 SITE PLAN NOT TO SCALE. RONGENA/5948
P.O BOX:......-00209
450X 600mm MANHOLE
COVER AND FRAME
450X 600mm MANHOLE
COVER AND FRAME 450X 600mm MANHOLE 8mm MAIN BAR AT NUMBER OLOITOKITOK,KENYA.
CAPACITY
350 120
GL GL
150 1,200 150 GL GL GL
COVER AND FRAME 300mm C/C
GL OF DIMENSIONS IN MILLIMETRES (mm).
200 5,200 200 Client signature ......................
120
12mm MAIN BARS AT 300mm CENTRES
E 450X 600mm
MANHOLE WITH C .I.
INLET
MANHOLE OUTLET 150mm THICK TYPE LITRES PERSONS A B C D E F1 F2
FROM SEPTIC 12mm BARS AT 150mm C1 4 INLET PIPE 10mm MAIN BAR C1 4 OUTLET PIPE MANHOLE
LIGHT DUTY COVER 150mm THICK BLOCK WORK Drawing title
100
450
250
500 250
WATER LEVEL TANK OUTLET CENTRES BOTH WAYS IL
A 3000 UP TO 10 800 1000 1000 3000 800 1500 1400
150
550
MANHOLE
G G CONCRETE 1:3:6 800 1400 1200 FOUNDATION MIX 1:3:6
C 9000 21-30 800 1400 1200 3600 1800 1500 1400 , Roof plan
Varries
F1
F2
800 1400 1200 D 12000 31-40 800 1600 1400 4000 2000 1500 1300
STONE WORK STONE WORK WALL scale:
12mm MAIN BARS SOAK PIT AS 'H' DEPTH OF SOAK PIT WALL 100
12mm WATER PROOF
AT 200mm CENTRES SPECIFIED
CEMENT -SAND
AS SPECIFIED 12mm WATER PROOF CEMENT -
SAND RENDERING
12mm WATER PROOF
CEMENT -SAND RENDERING E 15000 41-50 800 1600 1400 4000 2400 1500 1200 1:100
Gravel Fill
PLASTER
OR DIRECTED
150 600 200 F 21000 70-80 1200 2400 1600 4800 2400 2000 1800 Drawn by date:
150
D BY DRAWING {6
M }.
150mm THICK 400 80-90 1400 2600 1800 5200 2600 2200 2000
H
BASE SLAB . 400 150 mm CONCRETE BASE SLAB 1:2:4 - 3/4 GRADED G 24000
SEPTIC PLAN Designed by Sign:
SECTION H-H. SECTION G-G. SEPTIC TANK SCHEDULE Eric Asava ......................
GSPublisherVersion 0.80.100.100