Professional Documents
Culture Documents
P&P Layout - Copy-02
P&P Layout - Copy-02
Station=: 0+630.000
12
Station=: 0+488.429
Station=: 0+438.429
Station=: 0+403.429
Station=: 0+326.332
Station=: 0+273.332
Station=: 0+223.332
Station=: 0+286.332
Station=: 0+213.958
Station=: 0+363.429
Level =: 6.200
Level=: 6.200
LEGEND: 10
Level=: 5.825
Level=: 5.300
Level =: 5.290
Level=: 5.000
Level=: 5.165
Level=: 5.290
Level=: 5.100
Level=: 5.000
PLAN
8
Proposed CW
Earthen Shoulder
6
Road Shyness
Road Marking
4
Proposed Drain
Proposed CL
2
PROFILE
Proposed Road Level Datum Lvl : 0
Existing Road Level
5.051
5.251
5.290
5.290
5.132
5.000
5.000
6.079
6.189
6.200
6.200
6.200
6.200
6.200
6.200
6.200
6.200
5.276
5.223
5.043
5.003
5.549
5.848
At Grade
/GL Below PCL FRL (LHS)
Ground Level at13.5 m 14
(RHS) from CL
6.201
5.461
Ext. OGL Bellow
5.602
5.712
5.612
6.246
6.226
6.344
6.294
5.179
5.767
5.539
5.657
5.943
5.904
6.275
6.117
5.959
5.776
5.710
5.647
5.893
6.207
Ground Level at13.5 m
Station=: 0+650.000
CL (LHS)
Station=: 0+630.000
Station=: 0+716.500
Station=: 0+756.500
(LHS) from CL 12
Station=: 0+700.000
Station=: 0+943.104
Station=: 1+003.104
Level =: 6.200
Horizontal L=57.30 L=59.93 L=62.83 L=13.49 L=13.32 L=26.63 L=26.63
Level=: 6.200
Service Road Level L=10.451
R=300.0
L=19.572
R=300.0
L=28.263
R=450.0
L=1.562
R=100.0
L=25.983
R=1000.0
L=54.058
R=200.0
L=4.223
R=200.0
L=11.802
Level=: 5.785
Level=: 5.585
Schematic 10
Level=: 5.950
Δ-10.944 Δ-11.446 Δ-8.000 Δ-7.727 Δ-0.763 Δ-7.628 Δ-7.628
Level=: 5.585
Level=: 5.435
0.0 .37m
L= -0.5
Vertical L= 50.0m L= 40.0m
37.
10m L= 40.0m
35.
00m L= 50.0m
L= 141.57m
13 0%
0%
R= 10000m R= 8000m L= 00% R= 2667m L= R= 3333m
.0
0%
9
Schematic 0. 1.5 0.00%
0m
8
L=
K= 100 K= 80 K= 27 K= 33
0+214
0+220
0+240
0+260
0+280
0+300
0+320
0+340
0+360
0+380
0+400
0+420
0+440
0+460
0+480
0+500
0+520
0+540
0+560
0+580
0+600
0+620
0+630
Chainage 6
14
4
Station=: 0+000.000
12
Station=: 0+040.100
Station=: 0+080.100
Station=: 0+190.923
2
Station=: 0+220.000
Station=: 0+150.923
Level =: 6.882
Level =: 5.290
10
Level=: 6.170
Level=: 5.714
Level=: 5.271
Datum Lvl : 0
Level=: 5.358
6.200
6.200
6.190
6.110
5.950
5.752
5.619
5.573
5.528
5.450
5.585
5.585
5.585
5.585
5.585
5.585
5.585
5.585
5.585
5.585
8 At Grade FRL
5.781
6.848
6.920
6.762
6.427
6.520
6.577
6.146
5.340
6.415
5.966
5.756
5.626
5.759
5.458
5.485
5.476
5.185
5.543
5.306
Ext. OGL
Bellow CL
4
Horizontal L=22.066
L=25.96
R=500.0
L=44.981
L=56.45
R=1500.0
L=72.785
L=10.83
L=55.399
L=65.73
Ls=20 R=400.0 Ls=20 R=400.0
Schematic Δ-2.974 Δ-2.156 Δ-1.551 Δ-9.416
2 L= L= L=
1
Vertical 2
0.0 0.00 -1 6.5
.0 0m
L=186.60m 2
-0. 2.20
0% m 0% -0.00% 50 m
Schematic %
Datum Lvl : 0
0+630
0+640
0+660
0+680
0+700
0+720
0+740
0+760
0+780
0+800
0+820
0+840
0+860
0+880
0+900
0+920
0+940
0+960
0+980
1+000
Chainage
6.882
6.527
6.172
5.880
5.715
5.614
5.514
5.413
5.319
5.272
5.277
5.290
14
At Grade FRL
Station=: 0+630.000
12
Station=: 0+463.429
5.681
5.576
5.193
5.624
Station=: 0+413.429
Ext. OGL
Station=: 0+367.429
Station=: 0+225.411
Station=: 0+327.429
Bellow CL
Level =: 6.200
Level=: 6.200
10
Level =: 5.290
Level=: 5.950
Level=: 5.490
Horizontal L=63.31
Level=: 5.290
L=132.194 L=4.500
Ls=10 R=400.0 Ls=10
Schematic Δ-9.068
8
L=4
Vertical 0. L= 40.0m L=70.8 L= 40.0m 08m
-1.7 10m R= 3143m 2m R= 7037m 29.
8% -0.50% L= .07%
Schematic K= 31 K= 70 0
6
0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+220
Chainage
4
Datum Lvl : 0
6.011
5.290
5.290
5.290
5.290
5.290
5.290
5.310
5.423
5.616
5.816
6.145
6.199
6.200
6.200
6.200
6.200
6.200
6.200
6.200
6.200
6.200
At Grade
FRL (RHS)
4.911
4.848
5.029
5.244
5.150
5.360
5.740
5.549
5.640
5.596
5.639
5.819
5.832
5.720
5.638
5.530
5.908
6.178
5.035
5.765
5.585
CL (RHS)
Horizontal L=8.695
L=57.33
R=300.0
L=16.031
L=59.92
R=300.0
L=24.431
L=56.27
R=450.0
L=12.21
L=2.292 L=5.183
R=200.0
L=39.43
R=200.0
L=53.523
L=26.63
R=200.0
L=4.220
L=26.63
R=200.0
L=11.804
Schematic Δ-10.949 Δ-11.443 Δ-7.164 Δ-3.498 Δ-11.296 Δ-7.628 Δ-7.628
Vertical L= 102.02
m 6.00
m
L= 4 0%
Schematic -0.00% 1.0
0+225
0+240
0+260
0+280
0+300
0+320
0+340
0+360
0+380
0+400
0+420
0+440
0+460
0+480
0+500
0+520
0+540
0+560
0+580
0+600
0+620
0+630
Chainage
PROFILE
CLIENT:- AUTHORITY ENGINEER: EPC CONTRACTOR : DRAWING TITLE.
DRAWN BY M.M
NATIONAL HIGHWAYS AT GRADE PLAN & PROFILE
AUTHORITY OF INDIA LHS FROM CH. 0+214 TO CH. 0+630
DESIGNED BY S.A
RHS FROM CH. 0+225 TO CH. 0+630
PROOF CONSULTANT : SAFETY : DESIGN CONSULTANT: PROJECT:
CHECKED BY M.S
CONSTRUCTION OF SIX LANE ELEVATED KONA DRAWING NO: SP-09/HW/DWG/P&P/ 02 R0
Shashwat Structural Solutions Pvt. Ltd.
MKD. DATE DESCRIPTION APPROVED EXPRESSWAY FROM KM 0.145 TO KM 7.337 OF NH-117
L-206, 24, Veer Savarkar Block, Shakarpur,
Delhi-110092 Email: lw.infrastructures@gmail.com
IN THE STATE OF WEST BENGAL ON EPC MODE.
S.G
DATE :
APPROVED BY SCALE : 1:2000
R E V I S I O N S Ph no. +0120-4121867,9830035864
SHEET : PLOT SIZE-A2