A:Code B:Description F:Subtotal G:Factor H:Total


4. Groundworks;
4.1. Excavation, 5)
Trench Excavation for Edge Beam 6.54 1.00 6.54
Trench Excavation,
D3
4. Groundworks;
Disposal of Excavated Material (Off-site) 6.54 1.00 6.54
4.1. Excavation, M1

6. Concrete; 6.1: In-


Sand Blinding Layer 2.00 1.00 2
situ concrete, 19. D3

4. Groundworkd;
4.3: Paper & Plastic Plastic Membrane (200um Visqueen DPC) 5.50 2.00 11
membranes. M1
7. Formworks; 7.1:
Formwork (Faces, Soffits, Reveals) 1.2 1 1.2
Form work, D3
6. Concrete; 6.1: In-
situ concrete, 7.
Concrete Supply, Place, and Finishing (40MPa) 0.005 1 0.005
columns and beams;
M9

16. Structural Steel;


N12 Bar Reinforcement (Fixing Incl.) 575.09 12 6901.094
2. Beams

8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 575 12 6901.08
bars, D2

7. Formworks: 7.2
PERMANENT METAL
FORMWORK
Formwork (Faces, Soffits, Reveals) 1332 1 1332
SYSTEM; 8. sides and
soffits of
beams, M5 & M6

6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 78.8 1 78.8
CONCRETE; 7.
columns and beams

16. Structural Steel;


N12 Bar Reinforcement (Fixing Incl.) 79 3 237
2. Beams
8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 4400 1 4400
bars, D2.

6. CONCRETE
6.1 IN-SITU
Expansion Joints (Due to the exceptional length of the
CONCRETE; 12.
beam (661.4m), expansion joints are highly likely to be 667 1 667
ducts, channels or
required to manage thermal expansion and contraction)
box
drains, M13

7. Formworks: 7.2
PERMANENT METAL
FORMWORK
Formwork (Faces, Soffits, Reveals) 1 1 1
SYSTEM; 8. sides and
soffits of
beams, M5 & M6

6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 1 1 1
CONCRETE; 7.
columns and beams

16. Structural Steel;


N12 Bar Reinforcement (Fixing Incl.) 45 4 180
2. Beams
8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 300 2 600
bars, D2.
7. Formworks: 7.2
PERMANENT METAL
FORMWORK
Formwork (Faces, Soffits, Reveals) 37 1 37
SYSTEM; 8. sides and
soffits of
beams, M5 & M6

6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 11.00 1 11
CONCRETE; 7.
columns and beams

16. Structural Steel;


N12 Bar Reinforcement (Fixing Incl.) 42 1 42.37
2. Beams

8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 0.23 1 0.23
bars, D2

6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 26 1.05 27.3
1. footings, 2. pad
footings

6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 47 1.05 49.35
19. Blinding, 1.
Horizontal, D2.

4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 35 1.05 36.75
Plastic, 1. Horizontal,
M1

7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 27.00 1.05 28.35
of footing , M8 & M9

6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 38 1.05 39.9
1. footings , 3. pad
footings

8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 49 1.05 51.45
bars, 1. in footings

6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 165 1.05 173.25
1. footings, 2. pad
footings

6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 140 1.05 147
19. Blinding, 1.
Horizontal, D2.

4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 147 1.05 154.35
Plastic, 1. Horizontal,
M1

7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 4.6 1.05 4.83
of footing , M8 & M9

6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 152 1.05 159.6
1. footings , 3. pad
footings
8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 7.8 1.05 8.19
bars, 1. in footings

6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 96 1.05 100.8
1. footings, 2. pad
footings

6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 66 1.05 69.3
19. Blinding, 1.
Horizontal, D2.

4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 67 1.05 70.35
Plastic, 1. Horizontal,
M1

7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 35 1.05 36.75
of footing , M8 & M9

6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 39 1.05 40.95
1. footings , 3. pad
footings

8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 47 1.05 49.35
bars, 1. in footings

4. Groundworks,
4.3 PAPER AND
PLASTIC Plastic Membrane (200um Visqueen DPC) 66 1.05 69.3
MEMBRANES, 2.
Plastic, 1. Horizontal

6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place and Finishing (32 MPa) 23 1 23
CONCRETE, 2. slabs,
M7

6. CONCRETE
6.1 IN-SITU
Reinforcement Supply and Place/Fix (SL92 top & bottom) 33 1 33
CONCRETE, 2. slabs,
M7

37. EXTERIOR
ELEMENTS, 37.2 Diamond Dowel Expansion Joints 37 1.05 38.85
ROADWORKS, P1

4. GROUNDWORKS
Reinforcement Supply and Place/Fix (SL82 top & bottom) 37 1.05 38.85
4.1 EXCAVATION, P1

4. GROUNDWORKS
Concrete Supply, Place and Finishing (40 MPa Coloured -
4.1 EXCAVATION, 11. 37 1.05 38.85
CCS Voodoo87)
Surface Preparation

16. Roofing, 1.
Roofing Sheeting (Main Roof) 7.89 1.00 7.89
membranes, M4 , P1

16. Roofing, 3. Flat


Roofing Sheeting (Canopy Roof) 9.00 1.00 9
sheet, M8 & M9
16. Roofing, 6.
translucent sheet, Roofing Sheeting (Walkway Roof) 9.50 1.00 9.5
M8 & M9
16. Roofing, 20.
Safety Wire 2.44 1.00 2.44
Safety Mesh
16. Roofing, 18.
Insulation (R3.3 Air-cell RetroShield Blanket) 7.89 1 7.89
insulation
16. Roofing, 18.
Thermal Expansion 0.006 1 0.006
insulation
16. Roofing, 32.
Roof Infill Strips 0.40 1 0.4
separation strips
16. Roofing, 22.
0.55 BMT Box Gutter (Colorbond) 29 1 28.7
Gutters
16. Roofing, 22.
Gutters, 6. Joints 9.54 1 9.54
Expansion joint

16. Roofing, 22.


Stop Ends 14 1 14
Gutters,5. stop ends

16. Roofing, 22.


Angles 1 1 1
Gutters, 7. Angles
16. Roofing, 22.
Straps 14 1 14
Gutters, 2,3,4
16. Roofing, 22.
Brackets 14 1 14
Gutters, 2,3,4
16. Roofing, 22.
Clips 14 1 14
Gutters, 2,3,4
16. Roofing, 21.
Box Gutter Flashing (Colorbond; Custom Orb) 66.6 1.05 69.93
Flashing
16. Roofing, 21.
Parapet Flashing (Colorbond; Custom Orb) 35.8 1.05 37.59
Flashing
16. Roofing, 21.
Apron Flashing (Colorbond; Custom Orb) 38.7 1.05 40.635
Flashing
16. Roofing, 21.
Pan Flashing (Colorbond; Custom Orb) 44.7 1.05 46.935
Flashing

4. Groundworks,
4.3 PAPER AND
PLASTIC Plastic Membrane (200um Visqueen DPC) 54 1.05 56.385
MEMBRANES, 2.
Plastic, 1. Horizontal

6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place and Finishing (32 MPa) 19.5 1.05 20.475
CONCRETE, 2. slabs,
M7

6. CONCRETE
6.1 IN-SITU
Reinforcement Supply and Place/Fix (SL92 top & bottom) 14.6 1.05 15.33
CONCRETE, 2. slabs,
M7
16. Roofing, 21.
Pan Flashing (Colorbond; Custom Orb) 4 1.05 4.2
Flashing
16. Roofing, 23.
100mm Zincalume Downpipe 2 1.05 2.1
downpipes
16. Roofing, 23.
150mm Zincalume Downpipe 3 1.05 3.15
downpipes
16. Roofing, 23.
90° Bends (100mm) 2 1 2
downpipes
16. Roofing, 23.
90° Bends (150mm) 3 1 3
downpipes
16. Roofing, 23.
Downpipe Junctions 0 1.0 0
downpipes
16. Roofing, 23.
Downpipe Joints 1 1 1
downpipes
16. Roofing, 23.
Downpipe Supports (100mm) 4 1 4
downpipes
16. Roofing, 23.
Downpipe Supports (150mm) 3 1 3
downpipes
16. Roofing, 23.
Downpipe Straps 2 1 2
downpipes
16. Roofing, 23.
Downpipe Brackets 2 1 2
downpipes
16. Roofing, 23.
Downpipe Clips 15 1 15
downpipes
11. TANKING AND
WATERPROOF
Collars around Pipes 5 1 5
MEMBRANES, 6.
Collars, D1

16. Roofing, 22.


Dressing into Outlets, Sumps 3 1 3
Gutters, 10. Sumps
Code Description Quantity Unit Rate Subtotal Factor Total Workings Workings

ASMM Sections &


Subsections
External Beam 5.45 m Derived from S050 drawing of Struct Binder
4. Groundworks;
Total Excavation- = Perimeter= 5.45 m,
4.1. Excavation, 5) Trench Excavation for
6.54 m³ 6.54 1.00 6.54 Perimeter x Width Excavation = 545 x
Trench Excavation, Edge Beam
x Depth 0.3 x 0.4 = 6.54 m³
D3

4. Groundworks;
Disposal of Excavated Quantity x disposal Quantity x disposal
4.1. Excavation, 6.54 m³ 6.54 1.00 -
Material (Off-site) cost per m³ cost per m³
M1
6. Concrete; 6.1:
Beam Length (L) x 5 meters x 2 meters =
In-situ concrete, Sand Blinding Layer 10.00 m² 10.00 1.00 10
Beam Width (W) 10 square meters
19. D3

(Beam Length (L) +


4. Groundworkd; (5 meters + 0.1
allowance for laps)
4.3: Paper & Plastic Membrane meters) x (0.4 meters
5.70 m² 5.70 1.00 5.7 x (Beam Width (W)
Plastic (200um Visqueen DPC) + 0.1 meters) = 5.7
+ allowance for
membranes. M1 square meters
laps)

7. Formworks; Beam Length (L) x 5 meters x 0.4


Formwork (Faces,
7.1: Form work, 1.6 m² 1.60 1 1.6 Beam Width (W) x meters x 0.6 meters
Soffits, Reveals)
D3. Beam Depth (D = 1.6 square meters

6. Concrete; 6.1:
Beam Length (L) x Beam Concrete = 5m
In-situ concrete, 7. Concrete Supply, Place,
0.007 t 0.01 1 0.007 Beam Width (W) x x 0.4m x 0.6m =
columns and and Finishing (40MPa)
Beam Depth (D) 1.2m³ ≈ 0.0007 t)
beams; M9
16. Structural N12 Bar Reinforcement 2 x Beam Length
570.00 t 570.00 12 6840 10260
Steel; 2. Beams (Fixing Incl.) (L) x 3 bars/side
8. Beam Length (L) /
R12 Bar Stirrups (Fixing
REINFORCEMENT; 615 t 615.00 12 7380 Stirrup Spacing 4100
Incl.)
1. bars, D2 (0.3m) x 2
Internal Beam-1 650.5 m Derived from S050 drawing of Struct Binder

7. Formworks: 7.2
PERMANENT Formwork Area =
Beam Perimeter = 2
METAL Beam Perimeter x
Formwork (Faces, (Length) + 2 (Width)
FORMWORK 1256 m² 1256.00 1 1324.8 Beam Height =
Soffits, Reveals) = 2 (661.4m) + 2
SYSTEM; 8. sides 1324.8m x 0.4m =
(0.3m) = 1256
and soffits of 529.92 m²
beams, M5 & M6

6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 75.4 m³ 75.40 1 79.386 Beam Width (W) x
and Finishing (40MPa) Depth = 661.4m x
columns and Beam Depth (D)
0.3m x 0.4m = 75.4
beams

Total N12 Bar Length


16. Structural N12 Bar Reinforcement 2 x Beam Length = 2 (Beam Length) x
1290 t 1290.00 3 3968.4
Steel; 2. Beams (Fixing Incl.) (L) x 3 bars/side Bars per Side x 3 = 2
(661.4m) x 3 = 1290

Total R12 Stirrup


Length = Beam
8. Beam Length (L) /
R12 Bar Stirrups (Fixing Length / Stirrup
REINFORCEMENT; 4500 t 4500.00 1 4409.33 Stirrup Spacing
Incl.) Spacing x 2 =
1. bars, D2 (0.3m) x 2
661.4m / 0.3m x 2 =
4500

Expansion Joints (Due


6. CONCRETE to the exceptional
6.1 IN-SITU length of the beam
CONCRETE; 12. (661.4m), expansion According to the
625.7 m 625.70 1 661.4m 661.4m
ducts, channels or joints are highly likely to Drawing
box be required to manage
drains, M13 thermal expansion and
contraction)

Internal Beam-2 45.78 m Derived from S050 drawing of Struct Binder


7. Formworks: 7.2
PERMANENT Beam Perimeter =
Formwork Area =
METAL 2 (Length) + 2
Formwork (Faces, Beam Perimeter x
FORMWORK 35.6 m² 35.60 1 (Width) = 2
Soffits, Reveals) Beam Height = 93.8m
SYSTEM; 8. sides (44.68m) + 2
x 0.4m = 35.6
and soffits of (0.45m) = 93.8m
beams, M5 & M6

6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 8.2 m³ 8.20 1 Beam Width (W) x
and Finishing (40MPa) Depth = 44.68m x
columns and Beam Depth (D)
0.45m x 0.4m = 8.2
beams

otal N12 Bar Length =


2 (Beam Length) x
16. Structural N12 Bar Reinforcement 2 x Beam Length
32.9 t 32.90 4 178.72 Bars per Side x 3 = 2
Steel; 2. Beams (Fixing Incl.) (L) x 4 bars/side
(44.68m) x 4 =
178.72m

Total R12 Stirrup


Length = Beam
8. Beam Length (L) /
R12 Bar Stirrups (Fixing Length / Stirrup
REINFORCEMENT; 288 t 288.00 2 576 Stirrup Spacing
Incl.) Spacing x 2 =
1. bars, D2. (0.3m) x 2
44.68m / 0.3m x 2 =
288

Internal Beam-3 41.05 m Derived from S050 drawing of Struct Binder

7. Formworks: 7.2
PERMANENT Beam Perimeter =
Formwork Area =
METAL 2 (Length) + 2
Formwork (Faces, Beam Perimeter x
FORMWORK 38 m² 38.00 1 36.82 (Width) = 2
Soffits, Reveals) Beam Height =
SYSTEM; 8. sides (40.52m) + 2
92.04m x 0.4m = 38
and soffits of (0.65m) = 92.04m
beams, M5 & M6

6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 11.00 m³ 11.00 1 10.4 Beam Width (W) x
and Finishing (40MPa) Depth = 40.52m x
columns and Beam Depth (D)
0.65m x 0.4m = 11
beams

Concrete (tonnes) =
16. Structural N12 Bar Reinforcement 2 x Beam Length 40.52m x 0.65m x
45 t 45.00 1 42
Steel; 2. Beams (Fixing Incl.) (L) x 6 bars/side 0.4m x 1.05 x 2400
kg/m³ / 1000 = 45

R12 Stirrup Weight


8. Beam Length (L) /
R12 Bar Stirrups (Fixing (tonnes) = 274m *
REINFORCEMENT; 0.56 t 0.56 1 0.22 Stirrup Spacing
Incl.) 0.8 kg/m / 1000 =
1. bars, D2. (0.3m) x 2
0.56
Pad Footings-1 400 m² Derived from S050 drawing of Struct Binder
6. CONCRETE 6.1
Excavation Volume =
IN-SITU Footing Length (L)
Detailed Excavation (20m + 2 x 0.1m) x
CONCRETE, 1. 4 m³ 4.00 1.05 408 x Width (W) x
(incl. Disposal) (20m + 2 x 0.1m) x
footings, 2. pad Depth
1m = 408.08 m³
footings

6. CONCRETE 6.1
IN-SITU Footing Blinding Area
Footing Length (L)
CONCRETE, 19. Sand Blinding Layer 4 m² 4.00 1.05 400 = L x W = 20m x 20m
x Width (W)
Blinding, 1. = 400 m²
Horizontal, D2.

4. Groundworkd; (Footing Length (L) Membrane Area = (L


4.3: Paper & + allowance for + 0.2m) x (W + 0.2m)
Plastic Membrane
Plastic membrane, 4 m² 4.00 1.05 408 laps) x (Footing = (20m + 0.2m) x
(200um Visqueen DPC)
2. Plastic, 1. Width (W) + (20m + 0.2m) =
Horizontal, M1 allowance for laps) 408.04 m²
Formwork Perimeter
7. FORMWORK
= 2 (L) + 2 (W) = 2
7.1 FORMWORK, Footing Perimeter
Formwork (Faces) 4 m² 4.00 1.05 40 (20m) + 2 (20m) =
1. face of footing , (2L + 2W) x Height
80m, Formwork Area
M8 & M9
= 80m x 0.5m = 40 m²

6. CONCRETE 6.1
IN-SITU Footing Length (L) Concrete Volume =
Concrete Supply, Place,
CONCRETE, 1. 4 m³ 4.00 1.05 400 x Width (W) x 20m x 20m x 1m =
and Finishing (40MPa)
footings , 3. pad Depth (D) 400 m³
footings

N16 bar unit weight


2 x (L + W +
8. of 1.58 kg/m: Total
allowance for
REINFORCEMENT, N16 Bar Reinforcement N16 Bars (tonnes) =
8 t 8.00 1.05 2032.5 bends) x 8
1. bars, 1. in (Fixing Incl.) 1286.4m x 1.58
bars/layer x 2
footings kg/m / 1000 = 2032.5
layers
tonnes

Pad Footings-2 144 m² Derived from S050 drawing of Struct Binder


6. CONCRETE 6.1
IN-SITU Footing Length (L) 12m x 12m x (1m +
Detailed Excavation
CONCRETE, 1. 8 m³ 168 1.05 1344 x Width (W) x 0.1m/side) (D=1m,
(incl. Disposal)
footings, 2. pad Depth Batter=0.1m/side)
footings

6. CONCRETE 6.1
IN-SITU
Footing Length (L) L (12m) x W (12m) =
CONCRETE, 19. Sand Blinding Layer 8 m² 144 1.05 1152
x Width (W) 144 m²
Blinding, 1.
Horizontal, D2.

(Footing Length (L)


4. Groundworkd;
+ Overlap
4.3: Paper &
Plastic Membrane Allowance) x (12m+0.2m) x
Plastic membrane, 8 m² 148.84 1.05 1190.72
(200um Visqueen DPC) (Footing Width (12m+0.2m)
2. Plastic, 1.
(W) + Overlap
Horizontal, M1
Allowance)

7. FORMWORK
Perimeter
7.1 FORMWORK, Footing Perimeter
Formwork (Faces) 8 m² 4.8 1.05 38.4 (21.2m+21.2m) x
1. face of footing , (2L + 2W) x Height
Height
M8 & M9

6. CONCRETE 6.1
IN-SITU Footing Length (L) 12m x 12m x 1m x
Concrete Supply, Place,
CONCRETE, 1. 8 t 151.2 1.05 1209.6 x Width (W) x 1.05 (wastage)
and Finishing (40MPa)
footings , 3. pad Depth (D) tonnes
footings

2 x (Footing
8. Perimeter +
2 x (12m+12m+0.2m)
REINFORCEMENT, N16 Bar Reinforcement Allowance for
8 t 780 1.05 6240 x Bars/Layer x 2 =
1. bars, 1. in (Fixing Incl.) Bends) x Number
780 tonnes
footings of Bars/Layer x
Layers

Pad Footings-3 64 m² Derived from S050 drawing of Struct Binder


6. CONCRETE 6.1
8m x 8m x (1m +
IN-SITU Footing Length (L)
Detailed Excavation 0.1m/side) (D=1m,
CONCRETE, 1. 2 m³ 96 1.05 192 x Width (W) x
(incl. Disposal) Batter=0.1m/side)=
footings, 2. pad Depth
96 m³
footings

6. CONCRETE 6.1
IN-SITU
Footing Length (L) L (8m) x W (8m) = 64
CONCRETE, 19. Sand Blinding Layer 2 m² 64 1.05 128
x Width (W) m²
Blinding, 1.
Horizontal, D2.
4. Groundworkd; (Footing Length (L)
4.3: Paper & + allowance for (L+0.2m) x (W+0.2m)
Plastic Membrane
Plastic membrane, 2 m² 64.64 1.05 129.28 laps) x (Footing (e.g., L+0.2m +
(200um Visqueen DPC)
2. Plastic, 1. Width (W) + W+0.2m) = 64.64 m²
Horizontal, M1 allowance for laps)

7. FORMWORK
7.1 FORMWORK, Footing Perimeter Perimeter
Formwork (Faces) 2 m² 1.05
1. face of footing , (2L + 2W) x Height (28m+28m) x Height
M8 & M9

6. CONCRETE 6.1
IN-SITU Footing Length (L)
Concrete Supply, Place, L (8m) x W (8m) x D x
CONCRETE, 1. 2 t 1.05 x Width (W) x
and Finishing (40MPa) 1.05 (wastage)
footings , 3. pad Depth (D)
footings

2 x (L + W +
8.
allowance for
REINFORCEMENT, N16 Bar Reinforcement 2 x (8m+8m+0.2m) x
2 t 1.05 bends) x 4
1. bars, 1. in (Fixing Incl.) Bars/Layer x 2
bars/layer x 2
footings
layers
Ground Slab 0.50 m² Derived from drawing A110

Total Area = (5
4. Groundworks, meters + 2 x 0.1
4.3 PAPER AND Slab Length + Lap meter) x (3 meters +
PLASTIC Plastic Membrane Allowance) x (Slab 2 x 0.1 meter) Total
17.45 m² 1
MEMBRANES, 2. (200um Visqueen DPC) Width + Lap Area = (5.2 meters) x
Plastic, 1. Allowance (3.2 meters) Total
Horizontal Area = 17.45 square
meters (sq m)

Concrete mass
(tonnes) = (Slab Area
x Slab Depth x
6. CONCRETE slab area (sq m) x
Wastage Factor x
6.1 IN-SITU Concrete Supply, Place Slab Depth (0.125
0.010 t 1 Concrete Density) /
CONCRETE, 2. and Finishing (32 MPa) m) x 1.05 (wastage
1000 = (0.072429 sq
slabs, M7 factor)
m x 0.125 m x 1.05 x
2400 kg/cu m) / 1000
≈ 0.02173 tonnes

Perimeter of slab x Total Reinforcement


6. CONCRETE Number of Bars Mass (tonnes) = (20
Reinforcement Supply
6.1 IN-SITU per Meter (refer to m x 4 bars/m x 2 x π
and Place/Fix (SL92 top 170.00 t 1
CONCRETE, 2. structural x (0.012 m)^2 / 4 x
& bottom)
slabs, M7 drawings) x 2 (top 7850 kg/m) / 1000 ≈
& bottom) 0.0399 tonnes

External Pavement 1.98 m² Derived from drawing C103


Perimeter (20 m) /
37. EXTERIOR
Diamond Dowel Joint Spacing (6 m Perimeter / Joint
ELEMENTS, 37.2 2.35 m 1.05
Expansion Joints from Spacing
ROADWORKS, P1
drawings)=2.35

4. Perimeter (20 m) x Perimeter x Number


Reinforcement Supply
GROUNDWORKS Number of of Bars/Meter
and Place/Fix (SL82 top 170.00 m 1.05
4.1 EXCAVATION, Bars/Meter (4 ( number of
& bottom)
P1 bars/meter) x 2 bars/meter) x 2

4.
Concrete Supply, Place
GROUNDWORKS
and Finishing (40 MPa Slab Area x 0.175 Slab Area x 0.175 m x
4.1 EXCAVATION, 0.33 m³ 1.05
Coloured - CCS m x 1.05 = 0.32 m³ 1.05 = 0.33 m³
11. Surface
Voodoo87)
Preparation
A:Code B:Description C:Quantity D:Unit E:Rate F:Subtotal G:Factor H:Total I:Workings J:Workings

ASMM Sections &


Subsections

16. Roofing, 1. Roofing


As per
membranes, Sheeting 7.80 m² 1.00 7.8
Floor Plan
M4 , P1 (Main Roof)

16. Roofing, 3. Roofing


As per
Flat sheet, M8 & Sheeting 8.80 m² 1.00 8.8
Floor Plan
M9 (Canopy Roof)

Roofing
16. Roofing, 6.
Sheeting As per
translucent 9.40 m² 1.00 9.4
(Walkway Floor Plan
sheet, M8 & M9
Roof)
16. Roofing, 20. As per
Safety Wire 2.80 m 1.00 2.8
Safety Mesh Floor Plan
Insulation
16. Roofing, 18. (R3.3 Air-cell As per
7.80 m² 1 7.8
insulation RetroShield Floor Plan
Blanket)

ΔL =
(0.000006
5 /°F) x
16. Roofing, 18. Thermal ΔL = α x L x (49.2
0.006 m 1 0.006
insulation Expansion ΔT feet) x
(108°F) =
0.006
meters

10 meters
16. Roofing, 32. Roof Infill
10 m 1 10 of infill
separation strips Strips
strips
30 meters
16. Roofing, 22. Box Gutter
30 m² 1 30 based on
Gutters (Colorbond)
drawings.
16. Roofing, 22.
Gutters, 6. Joints 10 item 1 10
Expansion joint
16. Roofing, 22.
As per
Gutters,5. stop Stop Ends 15 item 1 15
Floor Plan
ends
16. Roofing, 22.
As per
Gutters, 7. Angles 2 deg 1 2
Floor Plan
Angles
16. Roofing, 22. As per
Straps 12 item 1 12
Gutters Floor Plan
16. Roofing, 22. As per
Brackets 12 item 1 12
Gutters Floor Plan
16. Roofing, 22. As per
Clips 12 item 1 12
Gutters Floor Plan

50 meters
x 1.05
16. Roofing, 21. Box Gutter (wastage
55 m 1.05 57.8
Flashing Flashing factor) =
57.8
meters

20 meters
x 1.05
16. Roofing, 21. Parapet
20 m 1.05 21.0 (wastage
Flashing Flashing
factor) =
21 meters

30 meters
x 1.05
16. Roofing, 21. (wastage
Apron Flashing 15 m² 1.05 31.5
Flashing factor) =
31.5
meters

4 x 1.05
16. Roofing, 21. (wastage
Pan Flashing 4 m² 1.05 4.2
Flashing factor) =
4.2

2
16. Roofing, 23. 100mm downpipes
2 m² 1.05 2.1
downpipes Downpipe (100mm
diameter)

1
16. Roofing, 23. 150mm downpipe
3 m 1.05 3.15
downpipes Downpipe (150mm
diameter)
16. Roofing, 23. 90° Bends
2 item 1 2
downpipes (100mm)
16. Roofing, 23. 90° Bends
3 item 1 3
downpipes (150mm)
16. Roofing, 23. Downpipe
0 item 1.0 0
downpipes Junctions
16. Roofing, 23. Downpipe
1 item 1 1
downpipes Joints
Downpipe
16. Roofing, 23.
Supports 5 item 1 5
downpipes
(100mm)
Downpipe
16. Roofing, 23.
Supports 4 item 1 4
downpipes
(150mm)
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Straps
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Brackets
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Clips

11. TANKING 5 pipes


AND penetratin
Collars around
WATERPROOF 5 item 1 5 g the roof
Pipes
MEMBRANES, 6. requiring
Collars, D1 collars

3 outlets
16. Roofing, 22. Dressing into
and sumps
Gutters, 10. Outlets, 5 item 1 5
requiring
Sumps Sumps
dressing