BLCN29003 Arsalan
BLCN29003 Arsalan
4. Groundworkd;
4.3: Paper & Plastic Plastic Membrane (200um Visqueen DPC) 5.50 2.00 11
membranes. M1
7. Formworks; 7.1:
Formwork (Faces, Soffits, Reveals) 1.2 1 1.2
Form work, D3
6. Concrete; 6.1: In-
situ concrete, 7.
Concrete Supply, Place, and Finishing (40MPa) 0.005 1 0.005
columns and beams;
M9
8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 575 12 6901.08
bars, D2
7. Formworks: 7.2
PERMANENT METAL
FORMWORK
Formwork (Faces, Soffits, Reveals) 1332 1 1332
SYSTEM; 8. sides and
soffits of
beams, M5 & M6
6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 78.8 1 78.8
CONCRETE; 7.
columns and beams
6. CONCRETE
6.1 IN-SITU
Expansion Joints (Due to the exceptional length of the
CONCRETE; 12.
beam (661.4m), expansion joints are highly likely to be 667 1 667
ducts, channels or
required to manage thermal expansion and contraction)
box
drains, M13
7. Formworks: 7.2
PERMANENT METAL
FORMWORK
Formwork (Faces, Soffits, Reveals) 1 1 1
SYSTEM; 8. sides and
soffits of
beams, M5 & M6
6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 1 1 1
CONCRETE; 7.
columns and beams
6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place, and Finishing (40MPa) 11.00 1 11
CONCRETE; 7.
columns and beams
8.
REINFORCEMENT; 1. R12 Bar Stirrups (Fixing Incl.) 0.23 1 0.23
bars, D2
6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 26 1.05 27.3
1. footings, 2. pad
footings
6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 47 1.05 49.35
19. Blinding, 1.
Horizontal, D2.
4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 35 1.05 36.75
Plastic, 1. Horizontal,
M1
7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 27.00 1.05 28.35
of footing , M8 & M9
6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 38 1.05 39.9
1. footings , 3. pad
footings
8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 49 1.05 51.45
bars, 1. in footings
6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 165 1.05 173.25
1. footings, 2. pad
footings
6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 140 1.05 147
19. Blinding, 1.
Horizontal, D2.
4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 147 1.05 154.35
Plastic, 1. Horizontal,
M1
7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 4.6 1.05 4.83
of footing , M8 & M9
6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 152 1.05 159.6
1. footings , 3. pad
footings
8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 7.8 1.05 8.19
bars, 1. in footings
6. CONCRETE 6.1
IN-SITU CONCRETE,
Detailed Excavation (incl. Disposal) 96 1.05 100.8
1. footings, 2. pad
footings
6. CONCRETE 6.1
IN-SITU CONCRETE,
Sand Blinding Layer 66 1.05 69.3
19. Blinding, 1.
Horizontal, D2.
4. Groundworkd;
4.3: Paper & Plastic
membrane, 2. Plastic Membrane (200um Visqueen DPC) 67 1.05 70.35
Plastic, 1. Horizontal,
M1
7. FORMWORK 7.1
FORMWORK, 1. face Formwork (Faces) 35 1.05 36.75
of footing , M8 & M9
6. CONCRETE 6.1
IN-SITU CONCRETE,
Concrete Supply, Place, and Finishing (40MPa) 39 1.05 40.95
1. footings , 3. pad
footings
8.
REINFORCEMENT, 1. N16 Bar Reinforcement (Fixing Incl.) 47 1.05 49.35
bars, 1. in footings
4. Groundworks,
4.3 PAPER AND
PLASTIC Plastic Membrane (200um Visqueen DPC) 66 1.05 69.3
MEMBRANES, 2.
Plastic, 1. Horizontal
6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place and Finishing (32 MPa) 23 1 23
CONCRETE, 2. slabs,
M7
6. CONCRETE
6.1 IN-SITU
Reinforcement Supply and Place/Fix (SL92 top & bottom) 33 1 33
CONCRETE, 2. slabs,
M7
37. EXTERIOR
ELEMENTS, 37.2 Diamond Dowel Expansion Joints 37 1.05 38.85
ROADWORKS, P1
4. GROUNDWORKS
Reinforcement Supply and Place/Fix (SL82 top & bottom) 37 1.05 38.85
4.1 EXCAVATION, P1
4. GROUNDWORKS
Concrete Supply, Place and Finishing (40 MPa Coloured -
4.1 EXCAVATION, 11. 37 1.05 38.85
CCS Voodoo87)
Surface Preparation
16. Roofing, 1.
Roofing Sheeting (Main Roof) 7.89 1.00 7.89
membranes, M4 , P1
4. Groundworks,
4.3 PAPER AND
PLASTIC Plastic Membrane (200um Visqueen DPC) 54 1.05 56.385
MEMBRANES, 2.
Plastic, 1. Horizontal
6. CONCRETE
6.1 IN-SITU
Concrete Supply, Place and Finishing (32 MPa) 19.5 1.05 20.475
CONCRETE, 2. slabs,
M7
6. CONCRETE
6.1 IN-SITU
Reinforcement Supply and Place/Fix (SL92 top & bottom) 14.6 1.05 15.33
CONCRETE, 2. slabs,
M7
16. Roofing, 21.
Pan Flashing (Colorbond; Custom Orb) 4 1.05 4.2
Flashing
16. Roofing, 23.
100mm Zincalume Downpipe 2 1.05 2.1
downpipes
16. Roofing, 23.
150mm Zincalume Downpipe 3 1.05 3.15
downpipes
16. Roofing, 23.
90° Bends (100mm) 2 1 2
downpipes
16. Roofing, 23.
90° Bends (150mm) 3 1 3
downpipes
16. Roofing, 23.
Downpipe Junctions 0 1.0 0
downpipes
16. Roofing, 23.
Downpipe Joints 1 1 1
downpipes
16. Roofing, 23.
Downpipe Supports (100mm) 4 1 4
downpipes
16. Roofing, 23.
Downpipe Supports (150mm) 3 1 3
downpipes
16. Roofing, 23.
Downpipe Straps 2 1 2
downpipes
16. Roofing, 23.
Downpipe Brackets 2 1 2
downpipes
16. Roofing, 23.
Downpipe Clips 15 1 15
downpipes
11. TANKING AND
WATERPROOF
Collars around Pipes 5 1 5
MEMBRANES, 6.
Collars, D1
4. Groundworks;
Disposal of Excavated Quantity x disposal Quantity x disposal
4.1. Excavation, 6.54 m³ 6.54 1.00 -
Material (Off-site) cost per m³ cost per m³
M1
6. Concrete; 6.1:
Beam Length (L) x 5 meters x 2 meters =
In-situ concrete, Sand Blinding Layer 10.00 m² 10.00 1.00 10
Beam Width (W) 10 square meters
19. D3
6. Concrete; 6.1:
Beam Length (L) x Beam Concrete = 5m
In-situ concrete, 7. Concrete Supply, Place,
0.007 t 0.01 1 0.007 Beam Width (W) x x 0.4m x 0.6m =
columns and and Finishing (40MPa)
Beam Depth (D) 1.2m³ ≈ 0.0007 t)
beams; M9
16. Structural N12 Bar Reinforcement 2 x Beam Length
570.00 t 570.00 12 6840 10260
Steel; 2. Beams (Fixing Incl.) (L) x 3 bars/side
8. Beam Length (L) /
R12 Bar Stirrups (Fixing
REINFORCEMENT; 615 t 615.00 12 7380 Stirrup Spacing 4100
Incl.)
1. bars, D2 (0.3m) x 2
Internal Beam-1 650.5 m Derived from S050 drawing of Struct Binder
7. Formworks: 7.2
PERMANENT Formwork Area =
Beam Perimeter = 2
METAL Beam Perimeter x
Formwork (Faces, (Length) + 2 (Width)
FORMWORK 1256 m² 1256.00 1 1324.8 Beam Height =
Soffits, Reveals) = 2 (661.4m) + 2
SYSTEM; 8. sides 1324.8m x 0.4m =
(0.3m) = 1256
and soffits of 529.92 m²
beams, M5 & M6
6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 75.4 m³ 75.40 1 79.386 Beam Width (W) x
and Finishing (40MPa) Depth = 661.4m x
columns and Beam Depth (D)
0.3m x 0.4m = 75.4
beams
6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 8.2 m³ 8.20 1 Beam Width (W) x
and Finishing (40MPa) Depth = 44.68m x
columns and Beam Depth (D)
0.45m x 0.4m = 8.2
beams
7. Formworks: 7.2
PERMANENT Beam Perimeter =
Formwork Area =
METAL 2 (Length) + 2
Formwork (Faces, Beam Perimeter x
FORMWORK 38 m² 38.00 1 36.82 (Width) = 2
Soffits, Reveals) Beam Height =
SYSTEM; 8. sides (40.52m) + 2
92.04m x 0.4m = 38
and soffits of (0.65m) = 92.04m
beams, M5 & M6
6. CONCRETE
Concrete Volume =
6.1 IN-SITU Beam Length (L) x
Concrete Supply, Place, Length x Width x
CONCRETE; 7. 11.00 m³ 11.00 1 10.4 Beam Width (W) x
and Finishing (40MPa) Depth = 40.52m x
columns and Beam Depth (D)
0.65m x 0.4m = 11
beams
Concrete (tonnes) =
16. Structural N12 Bar Reinforcement 2 x Beam Length 40.52m x 0.65m x
45 t 45.00 1 42
Steel; 2. Beams (Fixing Incl.) (L) x 6 bars/side 0.4m x 1.05 x 2400
kg/m³ / 1000 = 45
6. CONCRETE 6.1
IN-SITU Footing Blinding Area
Footing Length (L)
CONCRETE, 19. Sand Blinding Layer 4 m² 4.00 1.05 400 = L x W = 20m x 20m
x Width (W)
Blinding, 1. = 400 m²
Horizontal, D2.
6. CONCRETE 6.1
IN-SITU Footing Length (L) Concrete Volume =
Concrete Supply, Place,
CONCRETE, 1. 4 m³ 4.00 1.05 400 x Width (W) x 20m x 20m x 1m =
and Finishing (40MPa)
footings , 3. pad Depth (D) 400 m³
footings
6. CONCRETE 6.1
IN-SITU
Footing Length (L) L (12m) x W (12m) =
CONCRETE, 19. Sand Blinding Layer 8 m² 144 1.05 1152
x Width (W) 144 m²
Blinding, 1.
Horizontal, D2.
7. FORMWORK
Perimeter
7.1 FORMWORK, Footing Perimeter
Formwork (Faces) 8 m² 4.8 1.05 38.4 (21.2m+21.2m) x
1. face of footing , (2L + 2W) x Height
Height
M8 & M9
6. CONCRETE 6.1
IN-SITU Footing Length (L) 12m x 12m x 1m x
Concrete Supply, Place,
CONCRETE, 1. 8 t 151.2 1.05 1209.6 x Width (W) x 1.05 (wastage)
and Finishing (40MPa)
footings , 3. pad Depth (D) tonnes
footings
2 x (Footing
8. Perimeter +
2 x (12m+12m+0.2m)
REINFORCEMENT, N16 Bar Reinforcement Allowance for
8 t 780 1.05 6240 x Bars/Layer x 2 =
1. bars, 1. in (Fixing Incl.) Bends) x Number
780 tonnes
footings of Bars/Layer x
Layers
6. CONCRETE 6.1
IN-SITU
Footing Length (L) L (8m) x W (8m) = 64
CONCRETE, 19. Sand Blinding Layer 2 m² 64 1.05 128
x Width (W) m²
Blinding, 1.
Horizontal, D2.
4. Groundworkd; (Footing Length (L)
4.3: Paper & + allowance for (L+0.2m) x (W+0.2m)
Plastic Membrane
Plastic membrane, 2 m² 64.64 1.05 129.28 laps) x (Footing (e.g., L+0.2m +
(200um Visqueen DPC)
2. Plastic, 1. Width (W) + W+0.2m) = 64.64 m²
Horizontal, M1 allowance for laps)
7. FORMWORK
7.1 FORMWORK, Footing Perimeter Perimeter
Formwork (Faces) 2 m² 1.05
1. face of footing , (2L + 2W) x Height (28m+28m) x Height
M8 & M9
6. CONCRETE 6.1
IN-SITU Footing Length (L)
Concrete Supply, Place, L (8m) x W (8m) x D x
CONCRETE, 1. 2 t 1.05 x Width (W) x
and Finishing (40MPa) 1.05 (wastage)
footings , 3. pad Depth (D)
footings
2 x (L + W +
8.
allowance for
REINFORCEMENT, N16 Bar Reinforcement 2 x (8m+8m+0.2m) x
2 t 1.05 bends) x 4
1. bars, 1. in (Fixing Incl.) Bars/Layer x 2
bars/layer x 2
footings
layers
Ground Slab 0.50 m² Derived from drawing A110
Total Area = (5
4. Groundworks, meters + 2 x 0.1
4.3 PAPER AND Slab Length + Lap meter) x (3 meters +
PLASTIC Plastic Membrane Allowance) x (Slab 2 x 0.1 meter) Total
17.45 m² 1
MEMBRANES, 2. (200um Visqueen DPC) Width + Lap Area = (5.2 meters) x
Plastic, 1. Allowance (3.2 meters) Total
Horizontal Area = 17.45 square
meters (sq m)
Concrete mass
(tonnes) = (Slab Area
x Slab Depth x
6. CONCRETE slab area (sq m) x
Wastage Factor x
6.1 IN-SITU Concrete Supply, Place Slab Depth (0.125
0.010 t 1 Concrete Density) /
CONCRETE, 2. and Finishing (32 MPa) m) x 1.05 (wastage
1000 = (0.072429 sq
slabs, M7 factor)
m x 0.125 m x 1.05 x
2400 kg/cu m) / 1000
≈ 0.02173 tonnes
4.
Concrete Supply, Place
GROUNDWORKS
and Finishing (40 MPa Slab Area x 0.175 Slab Area x 0.175 m x
4.1 EXCAVATION, 0.33 m³ 1.05
Coloured - CCS m x 1.05 = 0.32 m³ 1.05 = 0.33 m³
11. Surface
Voodoo87)
Preparation
A:Code B:Description C:Quantity D:Unit E:Rate F:Subtotal G:Factor H:Total I:Workings J:Workings
Roofing
16. Roofing, 6.
Sheeting As per
translucent 9.40 m² 1.00 9.4
(Walkway Floor Plan
sheet, M8 & M9
Roof)
16. Roofing, 20. As per
Safety Wire 2.80 m 1.00 2.8
Safety Mesh Floor Plan
Insulation
16. Roofing, 18. (R3.3 Air-cell As per
7.80 m² 1 7.8
insulation RetroShield Floor Plan
Blanket)
ΔL =
(0.000006
5 /°F) x
16. Roofing, 18. Thermal ΔL = α x L x (49.2
0.006 m 1 0.006
insulation Expansion ΔT feet) x
(108°F) =
0.006
meters
10 meters
16. Roofing, 32. Roof Infill
10 m 1 10 of infill
separation strips Strips
strips
30 meters
16. Roofing, 22. Box Gutter
30 m² 1 30 based on
Gutters (Colorbond)
drawings.
16. Roofing, 22.
Gutters, 6. Joints 10 item 1 10
Expansion joint
16. Roofing, 22.
As per
Gutters,5. stop Stop Ends 15 item 1 15
Floor Plan
ends
16. Roofing, 22.
As per
Gutters, 7. Angles 2 deg 1 2
Floor Plan
Angles
16. Roofing, 22. As per
Straps 12 item 1 12
Gutters Floor Plan
16. Roofing, 22. As per
Brackets 12 item 1 12
Gutters Floor Plan
16. Roofing, 22. As per
Clips 12 item 1 12
Gutters Floor Plan
50 meters
x 1.05
16. Roofing, 21. Box Gutter (wastage
55 m 1.05 57.8
Flashing Flashing factor) =
57.8
meters
20 meters
x 1.05
16. Roofing, 21. Parapet
20 m 1.05 21.0 (wastage
Flashing Flashing
factor) =
21 meters
30 meters
x 1.05
16. Roofing, 21. (wastage
Apron Flashing 15 m² 1.05 31.5
Flashing factor) =
31.5
meters
4 x 1.05
16. Roofing, 21. (wastage
Pan Flashing 4 m² 1.05 4.2
Flashing factor) =
4.2
2
16. Roofing, 23. 100mm downpipes
2 m² 1.05 2.1
downpipes Downpipe (100mm
diameter)
1
16. Roofing, 23. 150mm downpipe
3 m 1.05 3.15
downpipes Downpipe (150mm
diameter)
16. Roofing, 23. 90° Bends
2 item 1 2
downpipes (100mm)
16. Roofing, 23. 90° Bends
3 item 1 3
downpipes (150mm)
16. Roofing, 23. Downpipe
0 item 1.0 0
downpipes Junctions
16. Roofing, 23. Downpipe
1 item 1 1
downpipes Joints
Downpipe
16. Roofing, 23.
Supports 5 item 1 5
downpipes
(100mm)
Downpipe
16. Roofing, 23.
Supports 4 item 1 4
downpipes
(150mm)
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Straps
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Brackets
16. Roofing, 23. Downpipe
5 item 1 5
downpipes Clips
3 outlets
16. Roofing, 22. Dressing into
and sumps
Gutters, 10. Outlets, 5 item 1 5
requiring
Sumps Sumps
dressing