Training Design (draft)

1.0 Background and Objectives


2.0 Expected Outputs
3.0 Participants
4.0 Program

Day/Date Topics/Sessions Responsible Team Materials / Resources Needed

Day 1 (Online)

15 Minutes Introduction
● Internet Connection

● Introduction of Participants
● Attendance Sheet

● Introduction of Firm (OIDCI)


● Zoom Meeting

● Activity Guide
● Document and Training Materials

o Project Overview

o Social, Gender and


Resettlement Document
Overview

o Project Alignment

o SES Questionnaire

o Consent Form

1 | Page
Day/Date Topics/Sessions Responsible Team Materials / Resources Needed

o Guide notes

o Project Flyers

30 Minutes Project Profile and Background Power point (LGU PowerPoint)

● Project Objectives

● Project Overview and Alignment

● Project Component (Social and


Environment)

● Project Timeline

30 Minutes Social, Gender and Resettlement Survey Power point (OIDCI PowerPoint)

● Project Objectives

● Project Outputs

● Project Timeline

● Institutional Component

2 | Page
Day/Date Topics/Sessions Responsible Team Materials / Resources Needed

● Team Composition

30 Minutes Introduction of Project Area and Affected Power point (OIDCI PowerPoint)
and Indirectly Affected

● Laguna Province

● Rizal Province

15 Minutes Break OIDCI Infomercial

30 Minutes Project Status and Upcoming Activities Power point (OIDCI PowerPoint)

15 Minutes Recap

Day 2 (Online)

30 Minutes Introduction

● Day 1 Review

● Activity Guide

60 Minutes Activity: IOL/CT/DMS Barangay Letters

3 | Page
Day/Date Topics/Sessions Responsible Team Materials / Resources Needed

Endorsement Letter
● Respondents (PAP)
Blown Up Maps
● Walkthrough: Preparation to
Consent Forms
Implementation
IOL Forms
● Document review
Rules and Guidelines in Conducting
the Activity
Outputs: Directory, IOL Form, Consent
Form, Photo Documentation Safety and Security

15 Minutes Break

60 Minutes Activity: SES SES Questionnaire

Power Point
● Respondents (PAP)
Barangay Letters
● Questionnaire Walkthrough
Endorsement Letter

● Outputs: Questionnaire ID

60 Minutes CAPI Program

15 Minutes Safety and Security Protocol

Day 3 (Pilot Testing with Actual PAP) – Rizal and Laguna

4 | Page
Day/Date Topics/Sessions Responsible Team Materials / Resources Needed

30 Minutes Introduction

● Day 2 Review

● Activity Guide

60 Minutes SES Mock Up (between participants)

120 Minutes IOL/ CT/SES Pilot

60 Minutes Plenary Review

5 | Page