GENERAL NOTES

GENERAL

1 This drawing is protected under the copyright act


and cannot be used or reproduced in part or in
whole without the authors consent

2 Read only figured dimensions.


3 All construcon work is to comply with the latest
K.B.S. standard code of prac ce, local authority
By- Laws, and fire regulaons.

4 P.v. denotespermanent venl laon and must be


provided above all openings where indicated or
shown
5 All walls to be reinforced with hoop iron alterna ng
A B C D E F G H courses

6 Water meters to be 300mm above ground level.


7,000 6,000 6,000 6,000 6,000 6,000 6,000
200 3,600 200 15,000 200 7 D.p.c. denotes damp proof course and to be of
bituminous felt placed under every wall and must be
1
atleast 150mm above ground level
200

8 All r.c. works to structural engineers details


6,200
6,000

6,200
9 Provide atleast one row of precast concrete
WAREHOUSE 600x600x50mm paving slabs around the building
OFFICE 1 unless otherwise shown.
(ceramic les f.f)

10 Contractors must verify all figured dimensions and


2 level on site before commencement of works and
200

any descripancy must be reported to the architect


for clarificaon.
WAREHOUSE
OFFICE 2 11 All levels shown are finished levels unless otherwise
6,200
6,000

6,200
(ceramic les f.f) stated

12 All surface beds to be cast on well compacted and


CUSTOMS & WAREHOUSE well consolidated filling
(epoxy power-floated f.f) 13 Depth of foundaon to be decided on site and
3
200

trenches to be minimum 600mm below reduced


ground level.
WORKSHOP
30,000

30,000
14 All pipes and services passing under road works to
(epoxy power-floated f.f)
6,200

6,200
be encased in 150mm thick concrete surround and
atleast 450mm below reduced ground level.

4
17,200
6,200

6,200
Rev. No. Date Revision

200
Project;

PROPOSED 45,000 METRIC TONS LPG


STORAGE BAY MANAGER'S OFFICE COMMON OFFICE STORAGE TERMINAL FOR TAIFA GAS SEZ

4,800
5,000

5,000
(epoxy power-floated f.f) (ceramic les f.f) (ceramic les f.f) INVESTMENTS

Client:

6 TAIFA GAS INVESTMENT


200

200
200 200 15,000 200 11,800 200 5,800 200 5,800 200 SEZ LIMITED.
P.O. BOX 40462 - 00232,
7,000 6,000 6,000 6,000 6,000 6,000 6,000
NAIROBI, KENYA.
44,400
Consultant:

WAREHOUSE & WORKSHOP GROUND FLOOR PLAN

Title:

WAREHOUSE & WORKSHOP

Scale: Drawn: Project. No.:


1:100 O.W.N

Date: Approved: Drg. No.


29/01/2024 A.M.N SC-01
GSPublisherVersion 0.41.100.100

You might also like