Pastors' 034633
Pastors' 034633
NYANG'ORI/GIMARAKWA/825
NOTES
S-02
1. All Dimensions are in mm unless specified ARCHITECTURAL DRAWING
ELEVATION 02
2.929
2.500
2. The contractor must check and verify all dimensions before
commencing any work. Any discrepancies must be notified CLIENT:
to the architect
1.000
0.300
0.300
4.000 FOUNDATION
GIMARAKWA P.A.G CHURCH
3. All sections should be read as per the floor plan and all
drawings must be read in context with each other. Any
LOCATION:
01 ELEVATION 01 1:100 discrepancies must be notified to the designer and clarified
ENTRY
1.694
3.000
DRAWING TITTLE:
0.200
ELEVATION 01
PROPOSED PUBLIC PURPOSE
1.715
SITTING DEVELOPMENT PLAN
5.302
KITCHEN ROOM 4. Damp proof course must be provided under all the external
4.725
2.662
4.000
2.500
BEDROOM 5. All the soils under the slab and around external foundation
to be treated for termite control.
CHECKED BY:
1.000
0.300
FOUNDATION
BACKYARD on 50mm stone dust binding on compacted hardcore
3.000
02 ELEVATION 02 1:100
7. Window sills must be finished before internal plastering
SCALE
1:100
CIVIL
S-02
STRUCTURAL
ELEVATION 03 9. Depth of the Foundation to be determined on site
for structural engineer to approve
FOUNDATION
10. Depth of foundation to be determined on site to structural engineer's
Ground Floor 1:100
approval
03 ELEVATION 03 1:100
11. All walls less than 200mm thick to be reinforced with hoop iron at
every alternate course
MECHANICAL
FOUNDATION
FOUNDATION 13. Deep seal or anti-vac or waste pipes. All bens and junctions
to have inspection plates
04 ELEVATION 04 1:100
S-02 SECTION 02 1:100