This sheet is the record of Revision. The previous issues are to be marked "superseded" and
archived.
Detailed Legend
W: Witness Point. Requires notification to the Owner by the Contractor. Upon proper
written notification by the Contractor to the Owner, work may proceed beyond a
Witness Point with or without action by the Owner. Contractor will submit Inspection
Request (IR) or inspection schedule to Owner for the items to be witnessed by Owner.
If Owner fails to participate in the test and inspection according to the IR or inspection
schedule, Contractor may proceed with the inspection as per the schedule without the
presence of Owner.
H: Hold Point. Verification points beyond which work may not proceed until the Contractor
notifies the Owner and the Owner performs verification and gives notice to the
Contractor to proceed. Downstream construction and activities shall not proceed without
attendance or written approval of Owner.
Al Ghubrah IWP
Consumable B1 Storage
g condition of lamination kits OEM manual H S S Log
g book
handling
B2 Check expire date Data sheet H S S Log book
Earth work & C1 Check trench condition provided by civil OEM manual H W S civil report
pipe stringing (dry, size and elevation, recesses)
C2 Check bedding condition prior to laying of pipe OEM Manual H W W civil report
(thickness and compaction)
D8 g assemblyy
Check flange OEM Manual H S S Pipe
p work pre-test
p checklist
(surface cleanliness, alignment and torque
value)
Final inspection G1 Reinstatement of the piping system Pipe work post-test H H w Pipe work post-test
checklist checklist