BUILDING PLINTH AREA DETAILS & CORRESPONDING TENDERED AMOUNT

Name of Work : Construction of 339 AMK Projects for HAPP at Trichy.

PHASE - I

Area
(PEB area + RCC area)
Sl. No Name of the building
PEB RCC Total

1 Main Building 7289 7289

2 Office Building in Main Building area - 900 900

3 Building No.1:Stamping and Heat Treatment. 1321 - 1321

4 Building No.2:Laboratory and Manufacturing. - 2339 2339

5 Building No.3:Plating - 1033 1033

6 Building No.4:Painting - 1033 1033

7 Raw Material store 2400 2400

8 Sub station-2nos - 900 900


9 ETP - 480 480

10 Air Compressor Building 400 15 415

Office room, Rest room, Store room, Toilets, Bath


11 2034 2034
rooms and maintenance rooms

12 Production, Planning & Control bldg. 500 500

13 Foreign Technician Hostel 1069 1069

Total : 11410 10303 21713

PHASE II

Sl. No Name of the building PEB RCC TOTAL

Building for Production of work-pieces (blanks)


4627 1360 5987
3BM42.007, 3BM42.009, 3BM42.009-01
1
2 Connectin Hood - 61 61
Building for Plasticizer preparation (Elastic gum
- 154 154
3 in benzin solution)
4 Hydrogen Gas Generating Plant Building 400 183 583
5 Substation Building - 1No. 450 450
6 Parking - 3 50 - 50
Total : 5077 2208 7285
Grand Total: 16487 12511 28998
ERED AMOUNT

at Trichy.

Amount

176019113

12604862

49483155

73106285

22236848

22405782

44123342
11229650
11438233

10545251

35338404

10135245

22454182
501120352

151893408
1498785

5452655
25953091
6879408
826350
192503697
693624049
HAPP Area calculation
Main shop
PEB 192.54 36.46 7020.008
4.32 36.46 157.5072
17.23 6.46 111.3058
7288.821
Say 7289.00 sqm

RCC 19.47 5.50 107.09


12.70 0.43 5.46
24.50 6.77 165.86
0.50 12.70 23.07 146.49
424.91

3.14 5.66 5.66 100.59 (A)


2 2 4 (B)
(A)/(B) 25.15
For one floor 450.05
For (G+1) 450.05 2 900.11
Say 900.00 sqm

Lab
RCC 3 42.23 18.46 2338.70
Say 2339.00 sqm

Plating
RCC 1 42.23 24.46 1032.95
Say 1033.00 sqm

Painting
RCC 1 42.23 24.46 1032.95
Say 1033.00 sqm

Stamping &Heat Treatment


PEB 1 36.46 36.23 1320.95
Say 1321.00 sqm

Engineering Room
RCC 2 214.09 6.23 2667.56
Toilets
lab 1 3.46 3.56 12.32
Plating &
Painting 2 6.23 4 49.84
Less -2 20.45 6.23 -254.81
-2 17.90 6.23 -223.03
-2 17.50 6.23 -218.05
2033.83
Say 2034.00 sqm
Raw material
PEB 1 60.00 44.50 2670.00
Say 2670.00 sqm

Sub station
RCC 3 30.00 15.00 1350.00
Say 1350.00 sqm

ETP
RCC 1 24.00 20.00 480.00
Say 480.00 sqm

Air Compressor
PEB 1 40.00 10.00 400.00
Say 400.00 sqm

RCC 1 5.00 3.00 15.00


Say 15.00 sqm

PM Shop
PEB 1 78.35 54.46 4266.94
Say 4267.00 sqm
RCC
Ladies rest room 1 39.01 7.73 301.55
Lab & Engg
section 1 55.06 19.21 1057.70
1359.25
Say 1360.00 sqm

Plasticiser Building
RCC 1 12.46 12.35 153.88
Say 154.00 sqm

Connecting Hood
RCC 1 17.54 3.46 60.69
Say 61.00 sqm

Hydrogen plant
PEB 1 18.23 15.23 277.64
Rectifier room 1 15.23 8.00 121.84
399.48
Say 400.00 sqm
RCC
Pannel room 1 15.23 6.00 91.38
Compressor room 1 15.23 6.00 91.38
182.76
Say 183.00 sqm
Foreign Technical Hostel
Ground Floor
Cupboard 1 36.87 15.44 569.27
Dining 1 2.17 0.60 1.30

Nitch Staircase 1 1.50 0.60 0.90


Bed RM area 3 4.26 0.635 8.12
Wardrope 3 2.00 0.60 3.60

Bedroom 2 4.26 1.51 12.87


Wardrope 2 2.00 0.60 2.40

Elect. Room 1 2.66 1.51 4.02

O.T.S 1 3.30 3.53 11.65


-1 5.03 3.43 -17.25

Balcony 1 7.23 0.80 5.78


602.65
Less landscape are -1 12.25 0.5 3.53 -21.62
-21.62
581.03 (A)

First Floor
Same as G.F 602.65
Less landscape are -1 15.44 3.53 -54.50
-1 16.03 2.33 -37.35
-1 6.00 5.43 -32.58
W1 -2 1.80 0.60 -2.16
Rear Terrace -1 3.30 1.80 -5.94
-1 1.20 0.23 -0.28
Near lobby -1 5.03 3.40 -17.10
452.74 (B)

(A) + (B) 581.03 452.74 1033.77


Add G.F Porch 1 0.50 9.92 5.7 28.27
-1 0.50 3.90 3.23 -6.30
1055.75
Say 1056.00
PHASE - II

PEB Structure 84.46 54.46 4600

RCC 7.23+19.46 54.46 1453.54

Less 15.225 7.73 -117.69

1336

Connecting Hood 17.54 3.00 52.62

Plasticiser Building 12.345 12.46 153.8

PEB RCC TOTAL

PM SHOP 4600 1336 5936

CONNECTING HOOD - 53 53

PLASTICISER BUILDING - 154 154

SUB STATION (1) 450 450

PARKING (3) 50 - 50

6643 Sqm
Sqm

Sqm

Sqm

Sqm
BUILDING AND ITS PLINTH AREA DETAILS

Name of Work : Construction of 339 AMK Projects for HAPP at Trichy.

PHASE - I
Area as per Revised Area as per HAPP's drawings
original and inputs
requisition and (PEB area + RCC area)
Sl. No Name of the building based on
which project
cost worked PEB RCC Total
out by HAPP

1 Main Building 8739 Sqm 7374 sqm - 7374 sqm


Office Building in Main Building
2 - - 714 sqm 714 sqm
area
Building No.1:Stamping and Heat
3 1080 Sqm 1330sqm - 1330 sqm
Treatment.
Building No.2:Laboratory and
4 1500 Sqm - 2621sqm 2621 sqm
Manufacturing.
Building No.3:Plating
5 - 1033sqm 1033 sqm

5.1 ETP - 400 sqm 400 sqm


1475 Sqm
5.2 Chemical Store - 80 sqm 80 sqm
6 Building No.4:Paint - 1033sqm 1033sqm
Office room, Rest room, Store room,
7 Toilets, Bath rooms and maintenance - - 2227sqm 2227 sqm
rooms
8 Raw Material store 2400 sqm 2173 sqm 190 sqm 2363 sqm

9 Production, Planning & Control bldg. 500 sqm - 500 sqm 500 sqm

10 Foreign Technician Hostel 1000 sqm - 1069sqm 1069 sqm


11 2 Nos. of sub station 1200 Sqm - 900 sqm 900 sqm
12 Air Compressor Building - 400 sqm 65 sqm 465 sqm

Total : 18354 sqm 11277 sqm 10832sqm 22109 sqm

PHASE II
Sl. No Name of the building PEB RCC TOTAL
Building for Production of work-
pieces (blanks) 3BM42.007, 4600 1336 5936
1 3BM42.009, 3BM42.009-01
2 Connectin Hood - 53 53
Building for Plasticizer preparation
- 154 154
3 (Elastic gum in benzin solution)
Hydrogen Gas Generating Plant
4 Building
5 Substation Building - 1No. 450 450
6 Parking - 3 50 - 50
6643
Total
Sqm