Area Cal
Area Cal
Area Cal
PHASE - I
Area
(PEB area + RCC area)
Sl. No Name of the building
PEB RCC Total
PHASE II
at Trichy.
Amount
176019113
12604862
49483155
73106285
22236848
22405782
44123342
11229650
11438233
10545251
35338404
10135245
22454182
501120352
151893408
1498785
5452655
25953091
6879408
826350
192503697
693624049
HAPP Area calculation
Main shop
PEB 192.54 36.46 7020.008
4.32 36.46 157.5072
17.23 6.46 111.3058
7288.821
Say 7289.00 sqm
Lab
RCC 3 42.23 18.46 2338.70
Say 2339.00 sqm
Plating
RCC 1 42.23 24.46 1032.95
Say 1033.00 sqm
Painting
RCC 1 42.23 24.46 1032.95
Say 1033.00 sqm
Engineering Room
RCC 2 214.09 6.23 2667.56
Toilets
lab 1 3.46 3.56 12.32
Plating &
Painting 2 6.23 4 49.84
Less -2 20.45 6.23 -254.81
-2 17.90 6.23 -223.03
-2 17.50 6.23 -218.05
2033.83
Say 2034.00 sqm
Raw material
PEB 1 60.00 44.50 2670.00
Say 2670.00 sqm
Sub station
RCC 3 30.00 15.00 1350.00
Say 1350.00 sqm
ETP
RCC 1 24.00 20.00 480.00
Say 480.00 sqm
Air Compressor
PEB 1 40.00 10.00 400.00
Say 400.00 sqm
PM Shop
PEB 1 78.35 54.46 4266.94
Say 4267.00 sqm
RCC
Ladies rest room 1 39.01 7.73 301.55
Lab & Engg
section 1 55.06 19.21 1057.70
1359.25
Say 1360.00 sqm
Plasticiser Building
RCC 1 12.46 12.35 153.88
Say 154.00 sqm
Connecting Hood
RCC 1 17.54 3.46 60.69
Say 61.00 sqm
Hydrogen plant
PEB 1 18.23 15.23 277.64
Rectifier room 1 15.23 8.00 121.84
399.48
Say 400.00 sqm
RCC
Pannel room 1 15.23 6.00 91.38
Compressor room 1 15.23 6.00 91.38
182.76
Say 183.00 sqm
Foreign Technical Hostel
Ground Floor
Cupboard 1 36.87 15.44 569.27
Dining 1 2.17 0.60 1.30
First Floor
Same as G.F 602.65
Less landscape are -1 15.44 3.53 -54.50
-1 16.03 2.33 -37.35
-1 6.00 5.43 -32.58
W1 -2 1.80 0.60 -2.16
Rear Terrace -1 3.30 1.80 -5.94
-1 1.20 0.23 -0.28
Near lobby -1 5.03 3.40 -17.10
452.74 (B)
1336
CONNECTING HOOD - 53 53
PARKING (3) 50 - 50
6643 Sqm
Sqm
Sqm
Sqm
Sqm
BUILDING AND ITS PLINTH AREA DETAILS
PHASE - I
Area as per Revised Area as per HAPP's drawings
original and inputs
requisition and (PEB area + RCC area)
Sl. No Name of the building based on
which project
cost worked PEB RCC Total
out by HAPP
9 Production, Planning & Control bldg. 500 sqm - 500 sqm 500 sqm
PHASE II
Sl. No Name of the building PEB RCC TOTAL
Building for Production of work-
pieces (blanks) 3BM42.007, 4600 1336 5936
1 3BM42.009, 3BM42.009-01
2 Connectin Hood - 53 53
Building for Plasticizer preparation
- 154 154
3 (Elastic gum in benzin solution)
Hydrogen Gas Generating Plant
4 Building
5 Substation Building - 1No. 450 450
6 Parking - 3 50 - 50
6643
Total
Sqm