Extra Item Statement No.1 03.07.2020
Extra Item Statement No.1 03.07.2020
1
Name of Work :-C/o AMK 339 Project for HAPP at Trichy. Package I. SH: Factory Buildings (Office attached Main Shop, Stamping & Heat Treatment Shop, Laboratory & Manufacturing
Building, Plating Shop, Paint coating Shop, Raw Material Store, Building for Production of work-piece i/c Engineering Rooms, Hydrogen Gas Generating Plant Building, Building for Plasticizer
preparation & PPC Building) i/c FT Hostel and Development works(civil) and Internal Electrical installations.
Page 1 of 7
Analysis of Rate
Name of work: Construction of AMK 339 project for HAPP at Trichy. package I. SH: Factory buildings(office attach
main shop, Stamping & heat treatment shop, laboratory & manufacturing building, plating shop, paint coating shop,
raw material store, building for production of work-piece i/c engineering rooms, hydrogen gas generating plant build
building for plasticizer preparation & PPC building) i/c FT hostel and development works(civil) and internal electrica
installations.
SUB ANALYSIS
13.50 Applying priming coat : 13.50.3 With ready mixed red oxide zinc chromate primer of approved
brand and manufacture on steel galvanised iron/steel works
CODE DESCRIPTION RATE UNIT
Detail of cost for 10 sqm
MATERIALS
4202 Red oxide Zinc chromate yellow primer 157.75 litre
9999.00 Carriage 2.00 L.S.
LABOUR
131 Painter 569.00 Day
115 Coolie 503.00 Day
9999 Brushes,sand paper including sundries 2.00 L.S.
Cost of 10.00 sqm
Cost of 1.00 sqm
MAIN ANALYSIS
Details of cost for one qunital
MATERIAL
Steel = 1.00q
Add wastage @ 5% = 0.05q
Total = 1.05q
Feb-2020 =(4550+4380)/2=4465
Chequered Plate 4465.00 quintal
Page 2
Add CP& OH @ 15%
Add TNLW @ 1%
Cost of 5.331 qunital
Cost per kg.
Page 3
actory buildings(office attached
ing shop, paint coating shop,
en gas generating plant building,
ks(civil) and internal electrical
QTY AMOUNT
0.54 85.19
0.52 1.04
0
0.24 136.56
0.24 120.72
10.79 21.58
365.09
36.51
1.05 4688.25
0.105 10.50
0.00
0.50 333.00
0.75 426.75
1.00 503.00
0.00
1.3 47.46
120.67 241.34
6250.30
62.50
6312.80
1330.11
Page 4
7642.91
1146.44
8789.35
87.89
8877.24
88.77
Page 5
Sl.No. Description No No Length Breadth
Layout-1 Sub-Station-1
10mm Chequered plate @
Panel room 1 1 22.32 2.150
1 1 10.98 2.150
1 1 5.94 1.650
1 1 9.22 2.150
1 1 12.39 1.650
1 1 3.19 1.650
VCB room 1 1 12.40 2.150
1 1 3.14 1.650
1 1 12.40 1.650
1 1 3.14 1.650
TR-I 1 1 5.78 0.650
1 1 5.78 0.450
1 1 5.78 0.650
1 1 3.02 0.650
1 1 3.04 0.650
1 1 3.04 0.650
1 1 3.02 0.650
1 1 3.02 0.450
1 1 3.04 0.650
TR-II 1 1 5.73 0.650
1 1 5.73 0.450
1 1 5.73 0.650
1 1 3.02 0.650
1 1 3.07 0.650
1 1 3.01 0.650
1 1 3.04 0.650
1 1 3.07 0.450
1 1 3.02 0.650
Battery room 1 1 2.30 2.150
Total Wt. for one Sub-station
Total Wt. in MT for 3 Sub-station
Say
Weight Qty
Per Sqm
78.50 3767.058
78.50 1853.15
78.50 769.379
78.50 1556.106
78.50 1604.815
78.50 413.185
78.50 2092.81
78.50 406.709
78.50 1606.11
78.50 406.709
78.50 294.925
78.50 204.179
78.50 294.925
78.50 154.096
78.50 155.116
78.50 155.116
78.50 154.096
78.50 106.682
78.50 155.116
78.50 292.373
78.50 202.412
78.50 292.373
78.50 154.096
78.50 156.647
78.50 153.585
78.50 155.116
78.50 108.448
78.50 154.096
78.20 386.699
18206.13
54618.38
55000.00