Hitung Besi Farid (Training) (1) (1) - 1
Hitung Besi Farid (Training) (1) (1) - 1
Hitung Besi Farid (Training) (1) (1) - 1
8 METER
TULANGAN ATAS & BAWAH
7 METER
8 METER
TULANGAN TENGAH (TUMPUAN)
TB1 7 METER
8 METER
TULANGAN TENGAH (LAPANGAN)
7 METER
4 METER
TULANGAN ATAS & BAWAH
3 METER
4 METER
TB2 TULANGAN TENGAH (TUMPUAN)
3 METER
4 METER
TULANGAN TENGAH (LAPANGAN)
3 METER
8 METER
SENGKANG/CINCIN (TUMPUAN)
7 METER
TB1 & TB2
8 METER
SENGKANG/CINCIN (LAPANGAN)
7 METER
OVERLAPING PERTEMUAN TIEBEAM 5 TITIK
OVERLAPING TENGAH/PEREMPATAN
1 TITIK
TB1 & TB2 TIEBEAM
OVERLAPING TENGAH/PERTIGAAN
2 TITIK
TIEBEAM
NOTE :
TUMPUAN TB1 = 40X16 640
LAPANGAN TB1 = 40X16 640
TUMPUAN TB2 = 40X10 400
LAPANGAN TB2 = 40X10 400
MM
MM
MM
MM
MM
KEBUTUHAN WASTE/BTG TOTAL KEBUTUHAN/BTG
5.37 6 BTG 10% 1 7
23.41 24 BTG 10% 2 26
30.83 31 BTG 10% 3 34