Plan PMX

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

29

28.1
28

27

26

25

24 K

23
F J

E.1 I
E
D.2
UNCOVERAGE AREAS
D.1
D
C.2

C.1
C
B.2

B.1
B
A.1
A
10 11 12 13 14 15 16 17

1 2 3 4 5 6 7 8 9 18 19 20 21 22

LPS SYSTEM ROLLING SPHERE ON LIGHTING POLE PROMATRIX


SCALE : N.T.S

OWNER/DEVELOPER PROJECT MANAGEMENT CONSULTANT KEY PLAN PROJECT TITLE : REF. DRAWING EDITION

AECOM
NO. REVISION DATE SHOP DRAWING
EDGECONNEX
1 SCALE : SIGN DATE JKT02 DATA CENTER
CORE & SHELL
GTN DATA CENTER, CIKARANG SELATAN, JAKARTA, INDONESIA PT AECOM INDONESIA
South Quarter Building, Tower C 5th Floor, Jl.RAA Kartini Kav.8, Cilandak Barat, Jakarta 12430, Indonesia 2 DRAWN :

CONTRACTOR DRAWING TITLE : DRAWING NO. REVISION


NOTES : 3 REVIEWED :
The review of this shop drawing is for conformity in the design intent and for general
arrangement only, BCEI & AECOM neither undertakes nor assumes any responsibility
whatsoever for the accuracy and/or adequacy (in any aspect) of the shopdrawing. The contractor
shall be strictly and solely responsible for any discrepancy, error, omission, inadequacy or non- 4 APPROVED :
compliance (with contract documents) in the shop drawing. The acceptance does not exonerate
KAJIMA - TATA JOINT OPERATION the contractor / subcontractor from any responsibility under the contract / subcontract PRJ CODE
5

You might also like