Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FABTECH ENGINEERING LLC

PLOT No: 532-110 & 532-111, DUBAI INDUSTRIAL CITY, DUBAI, UNITED ARAB EMIRATES.

FINAL DIMENSION AND VISUAL INSPECTION REPORT

Job No: 4023076 Date: 05.04.2024

Project: WEST QURNA 1 - OIL TRAIN 2 (DS7) Report No: 4023076/Dim/Rep/01


Client: CPECC / EXXON MOBIL Item description: D7 -PAR-05
Drawing No: IQWQ-CE820-VDERE-D7-3704

Description Required Dimension Measured Dimension Deviation noted.


Remarks
(mm) (mm) (mm)
Overall 24000 23999 -1
length
Height 14600 14601 +1
Width 4650 46501 +1
350 351 +1
1975 1976 +1
PIPE 2000 2001 +1
SUPPORTS
475 476 +1
(EL:17.400)
1850 1849 -1
2400 2402 +2
1000 1001 +1

Calibration details of measuring equipments used:


Equipment name Serial no Cal. date
Measuring Tape (0 to 5000mm) 32915-01 17/07/2024
Measuring Tape (0 to 30000mm) 92230 -MT-01 25/04/2024
AUTOMATIC LEVEL ZF 8683 10/04/2024
Remarks:
1) Overall alignment, plumbness, diagonal & straightness verified and found satisfactory.
2) Stick built final dimension verified as per drawing and found in acceptable limits.
3) Baseplate dimensions with bolt holes verified and found acceptable.
4) Overall Visual inspection carried out and found acceptable as per AWS D1.1
FABTECH ENGINEERING LLC CONTRACTOR TPI CLIENT TPI
Name: Vignesh Raja Name:
Signature: Name:
Signature:
Signature:
Date:
Date:

Date: 05-04-2024

You might also like