SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.

00 30-Jun-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
POSITIVE DISPLACEMENT PUMP SATIP-G-006-01 30-Oct-17 MECHANICAL-Rotating Equipment
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW Positive Displacement Pump Installation is a Special Process per Sch Q. An installation procedure include elements from checklists below.
Review of Material & Equipt Storage,
1.1 SAIC-G-2001 SAIC-G-2001 RH RH Per Schedule Q , Attach IV Para 6
Handling & Preservation Proc- (Pumps)
2.0 MATERIAL RECEIVING
Equipment Verification & Visual Insp of
2.1 SAIC-G-2009 SAIC-G-2009 H W
Positive Displacement Pumps

2.2 Pump Handling, Storage and Preservation SAIC-G-2010 SAIC-G-2010 H W See Note 1 of General Notes for SA's Responsibility.

Verification, Visual inspection and Refer to respective SATIPs (Electrical & Instrument)
2.3 storage/Preservation of Electrical and See Remarks See Remarks (SATIP-P-113-01/02/03, P-116-06 , P-515-01, J-100-01, J-
instrumentation components 200-01, J-300-01, J-400-01, J-902-03)

3.0 INSTALLATION

3.1 Concrete Foundation Installation See Remarks See Remarks See SATIP-Q-001-02
Verification of Equip Support Structure or
3.2 SAIC-M-2006 SAIC-M-2006 H W
Foundation (Pre-Installation)
Mounting Plate (Baseplate & Soleplate)
3.3 SAIC-G-2021 SAIC-G-2021 H W Use SATR-G-2005
Install & Leveling (Prior to Grouting)

3.4 Preliminary Pump / Driver Alignment SAIC-G-2022 SAIC-G-2022 H H Use SATR-G-2004

3.5 Grouting of Machinery Support See Remarks See Remarks See SATIP-Q-010-01 or Q-011-01whichever is applicable

3.6 Insp of Auxiliary Piping Installation SAIC-G-2004 SAIC-G-2004 H W

3.7 Welding See Remarks See Remarks See SATIP-W-011-01

3.8 Relief Valve Installation See Remarks See Remarks Refer to SATIP-J-600-01
Flange Joint, gasket verification and bolt Use SATR-L-2001 - See Note 1 of General Notes for SA's
3.9 SAIC-L-2014 SAIC-L-2014 H W
tightening Responsibility.
Refer to the applicable SATIP: SATIP-P-113-06,
3.10 Electric Motor (Driver) Installation See Remarks See Remarks
P-113-01, P-113-02, P-113-03, P-116-06
Skid Mounted Aux. Electrical System
3.11 See Remarks See Remarks Refer to SATIP-P-515-01
installation
Skid Mounted Aux. Instrumentation
3.12 See Remarks See Remarks Refer to SATIP-J-902-03
Systems installation

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00 30-Jun-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
POSITIVE DISPLACEMENT PUMP SATIP-G-006-01 30-Oct-17 MECHANICAL-Rotating Equipment
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.0 PRE-COMMISSIONING
Final Pump/Driver Shaft/Coupling
4.1 SAIC-G-2022 SAIC-G-2022 H W Use SATR-G-2004
Alignment
Instrumentation and Electrical Pre- Refer to the respective SATIPs for Electrical &
4.2 See Remarks See Remarks
Commissioning prior MCC Instrumentation
4.3 Final Insp/walkthrough (by Contractor) SAIC-G-2007 SAIC-G-2007 H W Use SATR-A-2011

4.4 Punch listing for Mech Completion Form SA-6133 Form SA-6133 H

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
1 Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is
3 not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017)

Saudi Aramco: Company General Use


Rev.2017.06.00

###

Saudi Aramco: Company General Use


30-Jun-17

Saudi Aramco: Company General Use


30-Oct-17 30-Oct-17

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017)

Saudi Aramco: Company General Use


Rev.2017.06.00

###

Saudi Aramco: Company General Use


30-Jun-17

Saudi Aramco: Company General Use


30-Oct-17 30-Oct-17