INSPECTION REPORT NDT

Customer : PT Kilang Pertamina Internasional RU VI Balongan


Equipment : Steam Turbine ( General Purpose - API 611 )
OEM : N/A
Job No : 23,107
Description Job : PENETRANT TESTING
MAGENTIC PARTICLE TESTING
Model / Type : N/A
Status of Part : As Received

Prepared Approved
NDT Inspector Engineering

Iwandhy David M.Asri


Date : 23 October 2023 Date : 23 October 2023

FP-10/22 // Rev 0 // 12-02-2014


PENETRANT TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/PT level : Iwandhy / II Report No. : 107/NDT-PT/X/23
No Id. No Qty. Description Status of Part
Overhaul Turbin 52-B-101E-K1-T-RKAP 2023,( Job Description As Recieve Repair
1 N/A 1 Lot :Overhaul Turbin 52-B-101E-K1-T-RKAP 2023 ) Final
Surface Preparation
Solvent Cleaning
Sand Blasting
Others
:

References: Penetrant Mng.: Penetrant Test Description


ASTM-E1444 STD-PE-10 Magnaflux SKL SP1 Color Contrast Dwell time
STD-PE-09 STD-PE-13 Red Dye Penetrant :
Ardrox 907PB 15 Minutes 30 Minutes
Others: API 687 Fluorescent
ISO 4386-3€ Others: Type: Developer:
Solvent Removal 3 Minutes 10 Minutes
Test Area
All Visible Surfaces Emulsifier
Post Cleaning
Others: Water Washable Preservative/Rust Protect

Witness by :
Test Result :

Results
No. ID No. QTY Item Evaluation Remarks
Accept Reject
1 N/A 1 Lot Turbine Shaft 52 - B - 101 E - K1 - T - Found Non-Relevant √
2 N/A 1 Set Upper Casing - Found Non-Relevant √
3 N/A 2 Ea Sleeve Bearing TE & CE - Found Non-Relevant √

NDT L.III/Eng.
Comment :

ACCEPTED

NOTE : INSPECTED BY : APPROVED BY :


Iwandhy David M. Asri
DATE : 23 October 2023 DATE : 23 October 2023
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN PERMISSION OF THE
COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 1 of 1


PENETRANT TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/PT level : Iwandhy / II Report No. : 107/NDT-PT/X/23

PENETRANT TESTING DOCUMENTATION

Turbine Shaft 52 - B - 101 E - K1 - T

Penetrating Process

Developing and Evaluation

The results of the Penetrant Testing Inspection Have Been found found Pitting Corosion on Deflector shaft Area

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN PERMISSION
OF THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 1 of 3


PENETRANT TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/PT level : Iwandhy / II Report No. : 107/NDT-PT/X/23

PENETRANT TESTING DOCUMENTATION

Upper Casing

Penetrating Process

Developing and Evaluation

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN PERMISSION
OF THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 2 of 3


PENETRANT TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/PT level : Iwandhy / II Report No. : 107/NDT-PT/X/23

PENETRANT TESTING DOCUMENTATION

Sleeve Bearing TE & CE

Penetrating Process

Developing and Evaluation

The results of the Penetrant Testing Inspection Have Been found Cluster Porosity

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN PERMISSION
OF THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 3 of 3


MAGNETIC PARTICLE TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/MT level : Iwandhy / II Report No. : 107/NDT-MT/X/23
No Id. No Qty. Description Status of Part
Overhaul Turbin 52-B-101E-K1-T-RKAP 2023,( Job Description As Recieve Repair
1 N/A 1 Lot :Overhaul Turbin 52-B-101E-K1-T-RKAP 2023 ) Final
Surface Preparation
Solvent Cleaning
Sand Blasting
Others

:
References: Test Description:
ASTM-E1417 STD-PE-11 Particle: Check Residual Magnet Method
STD-PE-09 Magnaflux 14A Min. : 1 Gauss Continuous Residual
API 687
Others Ardrox SY-8000 Max. : 2 Gauss Technique
: Others: Magnetizer Cable Central Conductor
Test Area Type Mobil Unit Direct Current
All Visible Surfaces Fluorescent wet Yoke End Process
Others Black-ink spray Current Demagnetize
AC
: Media : 2 Gauss
DC
Kerosene Base Min. : 300
Preservative/Rust Protect
Water Base Max.: 500
Witness by :
Test Result :

Results
No. ID No. QTY Item Evaluation Remarks
Accept Reject

Overhaul Turbin 52 B 101E K1 T


1 N/A 1 Lot - Found Non-Relevant √
RKAP 2023

NDT L.III/Eng.
Comment :

ACCEPTED

NOTE : INSPECTED BY : APPROVED BY :


Iwandhy David M. Asri
DATE : 23 October 2023 DATE : 23 October 2023
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN PERMISSION OF
THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 1 of 1


MAGNETIC PARTICLE TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/MT level : Iwandhy / II Report No. : 107/NDT-MT/X/23

MAGNETIC PARTICLE TESTING DOCUMENTATION


Overhaul Turbin 52 B 101E K1 T RKAP 2023

Perform Magnetic Particle Test

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 1 of 2


MAGNETIC PARTICLE TESTING REPORT
JOB NO : 23.107 MODEL / TYPE : N/A
CUSTOMER P/N
: PT Kilang Pertamina Internasional RU VI Balongan : N/A
EQUIPMENT : Steam Turbine ( General Purpose - API 611 ) S / N : N/A
OEM : N/A TAG NUMBER : N/A
Inspector/MT level : Iwandhy / II Report No. : 107/NDT-MT/X/23

MAGNETIC PARTICLE TESTING DOCUMENTATION


Overhaul Steam Turbin RU VI Balongan ( Upper Casing )

Perform Magnetic Particle Test

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. JAPA INDOTAMA (THE COMPANY) AND SHALL NOT BE REPRODUCED, USED, TRANSFERRED OR DISCLOSED TO OTHERS, EXCEPT AS AUTHORIZED BY CONTRACT WITH THE COMPANY, WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY

FP-10/22 // Rev 0 // 12-02-2014 Page 2 of 2