Final BOQ With Make - 18 Oct.2023

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

1 Mahape

2 Mahape
f Mahape

g Mahape
j Mahape

3 Mahape

c Mahape

i Mahape

k Mahape

l Mahape

4 Mahape

q Mahape

t Mahape

5 Mahape

6 4D

7 Interface
b Interface

8 Interface

9 Interface

10 Thane

11 Interface

12 Interface

13 Interface

14 Spectrum 3rd Floor

15 Interface

16 Interface
MEP related R&M work of mumbai circle offices and MSC locations
Fire Fighting System & related work

Office Work
Supply and fixing of1150x740mm aluminium framing glass fixing louvers window in pantry
for concealing of MSC cables 1 Job
Supply and installation of table border patti. 15 Rmt
Supply and Installation of shutter outside the mahape main double glass door. 1 Nos

Washroom Refusrbuishment
Sink Cock Faucets Tap for Kitchen Sink/Basin Taps with Wall Flange & Teflon Tape
(Mark),SILVER, Medium 4 Nos

Supply and installation of pull-out drawers near basin sink for consumable material storage 6 Nos
Supply & Installation of waterproofing chemical for wall and ceiling slab by Dr. Fixit or
equivalent make, high performance polymer modified cementitious membrane. This 600 sqft
includes crack filling and 2 coats of chemical application
Brick work in super structure class designation- 105, above DPC level in mortar mix 1:4 (1
cement : 4 course sand) including all materials, labour and tools and plants etc. required for 3 Cu.m
proper completion of work with minimum 6-days curing.

Mezzanine Floor - Cafeteria


Supply and installation of glass window after making provision on wall . The cost is including
of chipping of wall and civil reinstatement 2 Nos
Supply and installation of air PVC curtain for creation of partition within cafetaria 200 Sqft

Back side gate work

Washroom work

Office Work
Workstation soft board cushion replacement 4650 Sqft

Washroom work

Thane Meeting room Work

Common Area

Thane Meeting room Work

TNL Cabin - 1 to Meeting room

TNL Cabin - 2 Meeting room 2

Main Door work

Duct Extension Work

Interface- Fresh Air Unit Installation work


- -
- -
- -

200.00 3,000.00 40.00 600.00


- -
- -
- -

3,000.00 12,000.00 500.00 2,000.00

- -

- -

- -

- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

5,281,345.00 1,491,785.00
Total 6,773,130.00

You might also like